SARAMA RESOURCES REPORTS FURTHER Q1 2017 DRILL RESULTS
FOR KARANKASSO PROJECT IN BURKINA FASO
VANCOUVER, CANADA. Sarama Resources Ltd. (the “Company” or “Sarama”) advises that Savary Gold Corp. (“Savary”),
the operator of the Karankasso Project Joint Venture5 between Sarama and Savary, provided an update on April 10, 2017
of ongoing drilling campaigns. The drilling was undertaken across multiple target zones within the Karankasso Project
area.
Highlights
Note: mineralisation true widths are estimated at 65-80% of listed downhole intersection lengths
Further details of these drill results, including sampling and QA/QC procedures, are contained in Savary’s news release
dated April 10, 2017.
Sarama’s President and CEO, Andrew Dinning, commented:
“We are pleased with the steady progress and work being undertaken on the Karankasso Project and are looking
forward to the recommencement of activity in May.”
For further information on the Company’s activities, please contact: Andrew Dinning or Paul Schmiede
e: [email protected] | t: +61 (0) 8 9363 7600
• 41 holes totalling approximately 4,500 metres of reverse-circulation ("RC") drilling were completed.
• Selected downhole intersections highlighted by Savary include:
Serakoro 1 Main
HE-RC-17-030 5m @ 2.04 g/t Au from 19m including 1m @ 6.01 g/t Au from 23m
Karangosso Zone
HE-RC-17-044 3m @ 3.62 g/t Au from 84m
HE-RC-17-046 9m @ 1.66 g/t Au from 81m including 2m @ 5.44 g/t Au from 88m
Diosso South Zone
HE-RC-17-051 5m @ 3.12 g/t Au from 81m including 2m @ 6.72 g/t Au from 82m
HE-RC-17-053 5m @ 3.38 g/t Au from 100m including 1m @ 14.25 g/t Au from 101m
HE-RC-17-057 2m @ 19.91 g/t Au from 74m
HE-RC-17-060 18m @ 1.92 g/t Au from 10m including 9m @ 3.14 g/t Au from 12m, and
3m @ 6.86 g/t Au from 18m
HE-RC-17-062 6m @ 2.33 g/t Au from 122m
HE-RC-17-064 17m @ 1.72 g/t Au from 85m including 1m @ 11.10 g/t Au from 86m, and
1m @ 6.37g/t Au from 92m
Kueredougou West Trend Zone
HE-RC-17-066 4m @ 3.25 g/t Au from 80m including 2m @ 6.28 g/t Au from 80m
HE-RC-17-067 13m @ 1.26 g/t Au from 115m including 4m @ 2.54 g/t Au from 121m
HE-RC-17-070 4m @ 2.74 g/t Au from 99m
HE-RC-17-071 8m @ 1.54 g/t Au from 119m including 2m @ 3.58 g/t Au from 124m
• Follow-up drilling on selected targets is planned for Q2 2017.
ABOUT SARAMA RESOURCES LTD
Sarama Resources Ltd (TSX- V: SWA) is a West African focused gold explorer with substantial landholdings in Burkina
Faso. Sarama is focused on consolidating under -explored landholdings in Burkina Faso and other established mining
jurisdictions.
Sarama’s flagship properties are situated within the Company’s South Houndé Project area in south-west Burkina Faso.
Located within the prolific Houndé Greenstone B elt, Sarama’s exploration programs have built on sig nificant early
success to deliver an inferred mineral resource estimate of 2.1 Moz gold 1,2. Acacia Mining plc is earning up to a 70%
interest in the South Houndé Project by satisfying certain conditions, including funding earn- in expenditures of up to
US$14 million, over a 4-year earn-in period and may acquire an additional 5% interest, for an aggregate 75% interest in
the Project, upon declaration of a minimum mineral reserve of 1.6 million ounces of gold.
Sarama holds a 31% participating interest in the Karankasso Project Joint Venture (“ JV”) which is situated adjacent to
the Company’s South Houndé Project in Burkina Faso and is a JV between Sarama and Savary Gold Corp. (“ Savary”).
Savary is the operator of the JV and in October 2015, declared a maiden inferred mineral resource estimate of 671,000
ounces of contained gold3,4 at the Karankasso Project JV.
Sarama has also agreed to acquire a 100% interest in the Bondi D eposit from Orezone Gold Corporation (refer news
release May 24, 2016).
Together, the South Houndé Project, Bondi Deposit and the Karankasso Project form a cluster of advanced gold deposits,
within trucking distance of one another, which potentially offers a development option for a multi -source fed central
processing facility in the southern Houndé Belt region of Burkina Faso.
Incorporated in 2010, the Company’s Board and management team have a proven track record in Africa and a strong
history in the discovery and development of large-scale gold deposits. Sarama is well positioned to build on its current
success with a sound exploration strategy across its property portfolio.
1. 43.0 Mt @ 1.5 g/t Au (reported above cut -off grades ranging 0.3- 2.2 g/t Au, reflecting the mining methods and processing flowsheets
assumed to assess the likelihood of the inferred mineral resources having reasonable prospects for eventual economic extraction)
2. The effective date of the Company’s inferred mineral resource estimate is February 4, 2016. For further information regarding the mineral
resource estimate please refer to the technical report titled “NI 43 -101 Independent Technical Report South Houndé Project Update,
Bougouriba and Ioba Provinces, Burkina Faso”, dated March 31, 2016. The technical report is available under Sarama Resources Ltd.’s
profile on SEDAR at www.sedar.com.
3. 9.2 Mt @ 2.3 g/t Au (at a 0.5 g/t Au cut-off)
4. The effective date of the Karankasso Project JV mineral resource estimate is October 7, 2015. For further information regarding the mineral
resource estimate please refer to the technical report titled “Technical Report and Resource Estimate on the Karanka sso Project, Burkina
Faso”, dated October 7, 2015. The technical report is available under Savary Gold Corp’s profile on SEDAR at www.sedar.com. Sarama has
not independently verified Savary’s mineral resource estimate and takes no responsibility for its accuracy.
5. Sarama has 31% and Savary Gold has 69% ownership interests
CAUTION REGARDING FORWARD LOOKING STATEMENTS
Information in this news release that is not a statement of historical fact constitutes forward -looking information. Such forward-looking information
includes statements regarding drilling and geochemical and geophysical surveys at the South Houndé Project , the Earn- In Agreement with Acacia,
including the amounts that may be spent on exploration and interests in the South Houndé Project that may be earned by Acacia upon making certain
expenditures and estimating a minimum reserve, the potential to expand the present oxide component of the Company’s existing estimated mineral
resources, future exploration plans and the potential development of the Bondi, Karankasso and South Houndé Projects on a combined basis. Actual
results, performance or achievements of the Company may vary from the results suggested by such forward- looking statements due to known and
unknown risks, uncertainties and other factors. Such factors include, among others, that the business of exploration for gold and other precious
minerals involves a high degree of risk and is highly speculative in nature; Mineral Resources are not Mineral Reserves, they do not have demonstrated
economic viability, and there is no certainty that they can be upgraded to Mineral Reserves through continued exploration; few properties that are
explored are ultimately developed into producing mines; geological factors; the actual results of current and future explorat ion; changes in project
parameters as plans continue to be evaluated, as well as those factors disclosed in the Company’s publicly filed documents. There can be no assurance
that any mineralisation that is discovered will be proven to be economic, or that future required regulatory licensing or approvals will be obtained.
However, the Company believes tha t the assumptions and expectations reflected in the forward- looking information are reasonable . Assumptions
have been made regarding, among other things, Acacia’s continued funding of exploration activities, the Company’s ability to carry on its exploration
activities, the sufficiency of funding, the timely receipt of required approvals, the price of gold and other precious metals , that the Company will not
be affected by adverse political events, the ability of the Company to operate in a safe, efficient a nd effective manner and the ability of the Company
to obtain further financing as and when required and on reasonable terms. Readers should not place undue reliance on forward- looking information.
Sarama does not undertake to update any forward-looking information, except as required by applicable laws.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exc hange) accepts
responsibility for the adequacy or accuracy of this release.
QUALIFIED PERSONS’ STATEMENT
Scientific or technical information in this news release that relates to the preparation of the Company’s mineral resource es timate is based on
information compiled or approved by Adrian Shepherd. Adrian Shepherd is an employee of Cube Consulting Pty Ltd and is considered to be independent
of Sarama Resources Ltd. Adrian Shepherd is a Chartered Professional Member in good standing of the Australasian Institute of Mining and Metallurgy
and has sufficient experience which is relev ant to the commodity, style of mineralisation under consideration and activity which he is undertaking to
qualify as a Qualified Person under National Instrument 43-101. Adrian Shepherd consents to the inclusion in this news release of the information, in
the form and context in which it appears.
Scientific or technical information in this news release that relates to the preparation of the Karankasso Project’s mineral resource estimate is based
on information compiled or approved by Eugene Puritch and Ant oine Yassa. Eugene Puritch and Antoine Yassa are employees of P&E Mining
Consultants Inc. and are considered to be independent of Savary Gold Corp. and Sarama Resources Ltd. Antoine Yassa is a membe r in good standing
of the Ordre des Géologues du Québec and Eugene Puritch is a member in good standing of Professional Engineers Ontario. Eugene Puritch and Antoine
Yassa have sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which they are
undertaking to qualify as a Qualified Person under National Instrument 43-101. Eugene Puritch and Antoine Yassa consent to the inclusion in this news
release of the information, in the form a nd context in which it appears. Sarama has not independently verified S avary’s mineral resource estimate
and takes no responsibility for its accuracy.
Scientific or technical information in this news release, in respect of the Bondi Deposit relating to mineral resource and exploration information drawn
from the Technical Report prepared for Orezone on that deposit has been approved by Guy Scherrer. Guy Scherrer is an employee of Sarama Resources
Ltd and is a member in good standing of the Ordre des Géologues du Québec and has sufficient experience which is relevant to the commodity, style
of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 43 -101. Guy