Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SWA.V ·

Sarama Resources Increases Exploration Interests IN the Houndé Belt, Burkina Faso

Corporate Updates

MAY 16, 2017 

SARAMA RESOURCES INCREASES EXPLORATION INTERESTS IN

THE HOUNDÉ BELT, BURKINA FASO

VANCOUVER, CANADA.  Sarama Resources Ltd. (“Sarama” or the “Company”) (TSX‐V:SWA) is pleased to advise that it 

has agreed to acquire a 100% interest in the Botoro exploration property (“Botoro” or the “Property”) in south‐west 

Burkina Faso.   Botoro complements Sarama’s mineral property interests in the highly prospective southern Houndé 

Belt and increases the size of its 100%‐owned4 ThreeBee Project to approximately 660km². 

Highlights

Sarama’s President and CEO, Andrew Dinning, commented: 

“We are excited about the acquisition and the exploration potential of the Botoro Property and also the strengthening 

of our position in the southern Houndé Belt.   Importantly, Botoro complements our 100% owned ThreeBee Project 

and provides us with additional options outside our current joint ventures in the Houndé Belt. 

Teranga’s recently announced discoveries at their Golden Hill Project, situated less than 20km from Sarama’s Bondi 

Deposit,  further  shows  the  potential  on  the  eastern  part  of  the  belt  and  we  look  forward  to  the  results  from  our 

generative exploration work on Botoro that has already commenced.” 

For further information on the Company’s activities, please contact:  

Andrew Dinning or Paul Schmiede 

e: [email protected]  

t: +61 (0) 8 9363 7600  

 Acquisition is consistent with Sarama’s strategy to enhance, diversify and materially increase its position in the 

southern part of the prolific Houndé Belt 

 Botoro  Property  covers  224km²  and  is  located  within  trucking  distance  of  Sarama’s  100%‐owned  Bamako, 

Djarkadougou and Bouni Properties, altogether forming the ThreeBee Project 

 Underlain by a diverse suite of volcanic and meta‐sedimentary rocks known to host gold deposits of significant 

size  in  the  region,  with  prospectivity  further  enhanced  by  district‐scale  faults  and  shear  zones  traversing  the 

Property 

 Botoro  shares  geological  similarities  to  Sarama’s  Djarkadougou  Property,  which  hosts  the  Bondi  Deposit 

(historical estimate mineral resources of 0.3Moz Au measured and indicated and 0.1Moz Au inferred3) 

 Potential to build on existing gold occurrences within the ThreeBee Project which includes the Bondi Deposit 

and yet to be followed‐up drill intersections at the Bamako Property which include 15m @ 6.17g/t Au from 9m 

and 6m @ 1.78g/t Au from surface 

 No systematic modern‐day exploration has been conducted on Botoro 

 Substantial artisanal mining infrastructure previously established in several areas within the Property 

 ThreeBee  Project  is  independent  of,  but  complementary  to  other  projects  in  the  region  including  Sarama’s 

South  Houndé  Project  which  hosts  a  gold mineral  resources  of  2.1Moz1  and  also  Teranga  Gold  Corporation’s 

(“Teranga”) Golden Hill Project where encouraging new gold discoveries have recently been announced6 

2 

Botoro Property Location & Strategic Fit 

The 224km² Botoro Property is located on the eastern margin of the Houndé Belt and is well positioned relative to 

Sarama’s existing mineral property interests in the area.   Apart from having untested exploration potential itself, the 

Property  is  a  key component  of  the  Company’s 100%‐owned  ThreeBee Project,  which  also  includes the prospective 

Djarkadougou, Bamako and Bouni Properties. 

Botoro is located approximately 20km from the centroid of the Bondi Deposit (on the Djarakdougou Property) which 

has  a  historical  estimate  of  mineral  resources  of  0.3Moz  Au  measured  and  indicated  and  0.1Moz  Au  inferred3  and 

offers potential for the discovery of truckable feed to support eventual project development. 

The  ThreeBee  Project  is  also  complimented  by  the  early‐stage  exploration  properties  of  Bamako  and  Bouni  upon 

which reconnaissance drilling programs by Sarama have returned encouraging historical5 drill intersections including: 

 15m @ 6.17g/t Au from 9m (FRC384, Bamako); 

 6m @ 1.78g/t Au from surface FRC384, Bamako); 

 3m @ 3.81g/t Au from 63m (FRC489, Bamako); 

 4m @ 1.94g/t Au from 48m (FRC385, Bamako); 

 3m @ 2.43g/t Au from 37m (FRC108, Bouni); 

 4m @ 1.40 g/t Au from 26m (FRC101, Bouni); and 

 5m @ 1.14g/t Au from 33m (FRC101, Bouni). 

These intersections were returned in 2011/12, but have never been fully followed‐up by Sarama given the Company’s 

coincident discovery  on the South Houndé Project which subsequently became the primary focus.  When considered 

in  the  context  of  the  demonstrated  prospectivity  of  Sarama’s  other  properties  within  the  ThreeBee  Project,  these 

historical intersections demonstrate good potential for the discovery of exploitable gold mineralisation. 

It is notable that the Botoro Property is underlain by the same geological sequence of rocks as Teranga’s emerging 

Golden  Hill  Project  to  the  north.   Recent  exploration  by  Teranga6  on  the  project  has  returned  several  higher  grade 

intersections over mineable widths which reinforce the excellent historical drill results of previous operators6 on the 

Golden Hill Project. 

Botoro Property Geology and Gold Occurrences 

The geology of the Botoro Property is typical of other properties in the Houndé Belt where Sarama has had significant 

exploration success and broadly consists of a sequence of alternating volcanic and metasedimentary rocks oriented in 

an approximate north‐south orientation (refer Figure 2).  In addition to the presence of a regionally extensive granitic 

belt along the eastern and northern margins of the Property, several localised felsic intrusions are also present, all of 

which  result  in  zones  of  deformation  and  contact  metamorphism.   A  property‐scale  fold  structure  is  interpreted, 

which is bounded on its eastern side by a district‐scale north‐north‐east trending shear zone.   The diversity of these 

geological units and their litho‐structural contacts present areas of interest for gold exploration. 

The Property is also interpreted to feature several regionally extensive first and second‐order faults and shear zones, 

further adding to the Property’s exploration potential. 

Site visits conducted by Sarama have identified several areas of significant gold exploitation by artisanal miners.   In 

general, these activities targeted gold‐bearing quartz veins down to depths of approximately 40m (refer Plates 1 and 

2).  Gold was also noted in the weathered zones of both mafic and felsic rock units. 

Sarama plans to focus initial exploration activities on artisanal mining areas and prospective zones located proximal to 

major structural features within the Property.  Forward work programs include geological mapping, regolith mapping, 

soil geochemistry surveys and data collection from artisanal workings. 

3 

Figure 1 – Location Plan of Botoro Property (ThreeBee Project in Red)    

4 

Figure 2 ‐ Geology Map of the Botoro Property 

5 

Plate 1 – Artisanal Gold Mining Infrastructure Established to Depths of 40m 

Plate 2 – Extensive Artisanal Gold Mining Workings in Prospective Areas 

6 

ABOUT SARAMA RESOURCES LTD  

Sarama Resources Ltd (TSX‐V: SWA) is a West African focused gold explorer with substantial landholdings in Burkina 

Faso.   Sarama is focused on consolidating under‐explored landholdings in Burkina Faso and other established mining 

jurisdictions. 

Sarama’s  flagship  properties  are  situated  within  the  Company’s  South  Houndé  Project  area  in  south‐west  Burkina 

Faso.  Located  within  the  prolific  Houndé  Greenstone  Belt,  Sarama’s  exploration  programs  have  built  on  significant 

early success to deliver an inferred mineral resource estimate of 2.1 Moz gold1. Acacia Mining plc is earning up to a 

70% interest in the South Houndé Project by satisfying certain conditions, including funding earn‐in expenditures of up 

to  US$14  million,  over  a  4‐year  earn‐in  period  and  may  acquire  an  additional  5%  interest,  for  an  aggregate  75% 

interest in the Project, upon declaration of a minimum mineral reserve of 1.6 million ounces of gold.  

Sarama holds a 31% participating interest in the Karankasso Project Joint Venture (“JV”) which is situated adjacent to 

the Company’s South Houndé Project in Burkina Faso and is a JV between Sarama and Savary Gold Corp. (“Savary”).  

Savary  is  the  operator  of  the  JV  and  in  October  2015,  declared  a  maiden  inferred  mineral  resource  estimate  of 

671,000 ounces of contained gold2 at the Karankasso Project JV. 

Sarama has also agreed to acquire a 100% interest in the Bondi Deposit from Orezone Gold Corporation (refer news 

release May 24, 2016).   Bondi has a historical estimate of mineral resources of 0.3Moz Au (measured and indicated) 

and 0.1Moz Au (inferred)3. 

Together,  the  South  Houndé  Project,  Bondi  Deposit  and  the  Karankasso  Project  form  a  cluster  of  advanced  gold 

deposits, within trucking distance of one another, which potentially offers a development option for a multi‐source 

fed central processing facility in the southern Houndé Belt region of Burkina Faso. 

Incorporated in 2010, the Company’s Board and management team have a proven track record in Africa and a strong 

history  in  the  discovery  and  development  of  large‐scale  gold  deposits.   Sarama  is  well  positioned  to  build  on  its 

current success with a sound exploration strategy across its property portfolio. 

1. South  Houndé  Project ‐  43.0  Mt  @  1.5  g/t  Au  (reported  above  cut‐off  grades  ranging  0.3‐2.2  g/t  Au,  reflecting  the  mining  methods  and 

processing flowsheets assumed to assess the likelihood of the inferred mineral resources having reasonable prospects for eventual economic 

extraction). The effective date of the Company’s inferred mineral resource estimate is February 4, 2016.  For further information regarding 

the  mineral  resource  estimate  please  refer  to  the  technical  report  titled  “NI  43‐101  Independent  Technical  Report  South  Houndé  Project 

Update, Bougouriba and Ioba Provinces, Burkina Faso”, dated March 31, 2016. The technical report is available under Sarama Resources 

Ltd.’s profile on SEDAR at www.sedar.com.   

2. Karankasso Project ‐ 9.2 Mt @ 2.3 g/t Au (at a 0.5 g/t Au cut‐off).  The effective date of the Karankasso Project JV mineral resource estimate 

is October 7, 2015.   For further information regarding the mineral resource estimate please refer to the technical report titled “Technical 

Report  and  Resource  Estimate  on  the  Karankasso  Project,  Burkina  Faso”,  dated  October  7,  2015.  The  technical  report  is  available  under 

Savary Gold  Corp’s profile on SEDAR at www.sedar.com.   Sarama  has  not independently verified Savary’s  mineral resource  estimate and 

takes no responsibility for its accuracy. Savary is the operator of the Karankasso Project JV and Sarama is relying on their Qualified Persons’ 

assurance of the validity of the mineral resource estimate. 

3. Bondi  Deposit ‐   4.1Mt  @  2.1g/t  Au  for  282,000  oz  Au  (measured  and  indicated)  and  2.5Mt  @  1.8g/t  Au  for  149,700  oz  Au  (inferred), 

reported at a 0.5 g/t Au cut‐off. 

i. The historical estimate of the Bondi Deposit reflects a mineral resource estimate compiled by Orezone Gold Corporation (“Orezone”) 

which has an effective date of February 20, 2009.  The historical estimate is contained in a technical report titled “Technical Report on 

the Mineral Resource of the Bondigui Gold Project”, dated date of February 20, 2009 (the “Bondi Technical Report”) and is available 

under the profile of Orezone on SEDAR at www.sedar.com. 

ii. Sarama  believes  that  the  historical  estimate  is  relevant  to  investors’  understanding  of  the  property,  as  it  reflects  the  most  recent 

technical work undertaken in respect of the Bondi Deposit. 

iii. The historical estimate was informed by 886 drillholes, assayed for gold by cyanidation methods, were used to interpret mineralised 

envelopes  and  geological  zones  over  the  area  of  the  historical  estimate.   Gold  grade  interpolation  was  undertaken  using  ID² 

methodology based on input parameters derived from geostatistical and geological analyses assessments.  Field measurements and 

geological logging of drillholes were used to determine weathering boundaries and bulk densities for modelled blocks. 

iv. The historical estimate uses the mineral resource reporting categories required under National Instrument 43‐101. 

v. No more recent estimates of the mineral resource or other data are available. 

vi. Sarama  is  currently  undertaking  the  necessary  verification  work  in  the  field  and  on  the  desktop  that  may  support  the  future 

reclassification of the historical estimate to a mineral resource.  

vii. A  qualified  person  engaged  by  Sarama  has  not  undertaken  sufficient  work  to  verify  the  historical  estimate  as  a  current  mineral 

resource and Sarama is therefore not treating the historical estimate as a current mineral resource.   

7 

4. Upon  closing  of  the  respective  purchase  agreements  for  Botoro  and  Djarkadougou,  Sarama  will  have  100%  interest  in  the  Botoro, 

Djarkadougou, Bamako and Bouni Properties which together comprise the ThreeBee Project. 

5. For  further  information  regarding  the  drilling  on  the  Bamako  and  Bouni  Properties,  please refer  to  the technical  report  titled  “NI  43‐101 

Independent Technical Report South Houndé Project Update, Bougouriba and Ioba Provinces, Burkina Faso”, dated October 28, 2013. The 

technical report is available under Sarama Resources Ltd.’s profile on SEDAR at www.sedar.com. 

6. Results of exploration activities on the Golden Hill Project by Teranga Gold Corporation are sourced from Teranga Gold Corporation’s news 

release  “Teranga  Gold  Announces  Two  New  Gold  Discoveries  at  Golden  Hill  Property  in  Burkina  Faso”,  dated  April  25,  2017.   Results  of 

exploration  activities  on  the  Golden  Hill  Project  by  operators  prior  to  Teranga  Gold  Corporation  are  sourced  from  Gryphon  Minerals 

Limited’s news release “Exploration Pipeline Update”, dated March 5, 2014. 

8 

CAUTION REGARDING FORWARD LOOKING STATEMENTS 

Information in this news release that is not a statement of historical fact constitutes forward‐looking information. Such forward‐looking information 

includes statements regarding the Company’s intention to acquire the Botoro Property and its plans to explore and develop the Botoro Property and 

the ThreeBee Project, exploration activities at the South Houndé Project, the Earn‐In Agreement with Acacia, including the  amounts that may  be 

spent on exploration and interests in the South Houndé Project that may be earned by Acacia upon making certain expenditures and estimating a 

minimum reserve, the potential to expand the present oxide component of the Company’s existing estimated mineral resources, future exploration 

plans  and  the  potential  development  of  the  Bondi,  Karankasso  and  South  Houndé  Projects  on  a  combined  basis.  Actual  results,  performance  or 

achievements  of  the  Company  may  vary  from  the  results  suggested  by  such  forward‐looking  statements  due  to  known  and  unknown  risks, 

uncertainties and other factors. Such factors include, among others, that the business of exploration for gold and other precious minerals involves a 

high  degree  of  risk  and  is  highly  speculative  in  nature;  Mineral  Resources  are  not  Mineral  Reserves,  they  do  not  have  demonstrated  economic 

viability, and there is no certainty that they can be upgraded to Mineral Reserves through continued exploration; few properties that are explored 

are  ultimately  developed  into  producing  mines;  geological  factors;  the  actual  results  of  current  and  future  exploration;  changes  in  project 

parameters  as  plans  continue  to  be  evaluated,  as  well  as  those  factors  disclosed  in  the  Company’s  publicly  filed  documents.  There  can  be  no 

assurance that any mineralisation that is discovered will be proven to be economic, or that future required regulatory licensing or approvals will be 

obtained.  However,  the  Company  believes  that  the  assumptions  and  expectations  reflected  in  the  forward‐looking  information  are  reasonable. 

Assumptions have been made regarding, among other things, Acacia’s continued funding of exploration activities, the Company’s ability to carry on 

its exploration activities, the sufficiency of funding, the timely receipt of required approvals, the price of gold and other precious metals, that the 

Company will not be affected by  adverse political events, the ability of the Company to operate in a safe, efficient and effective manner and the 

ability  of  the  Company  to  obtain  further  financing  as  and  when  required  and  on  reasonable  terms.  Readers  should  not  place  undue  reliance  on 

forward‐looking information.  

Sarama does not undertake to update any forward‐looking information, except as required by applicable laws. 

Neither  TSX  Venture  Exchange  nor  its  Regulation  Services  Provider  (as  that  term  is  defined  in  policies  of  the  TSX  Venture  Exchange)  accepts 

responsibility for the adequacy or accuracy of this release. 

QUALIFIED PERSONS’ STATEMENT 

Scientific or technical information in this news release that relates to the Company’s exploration activities in Burkina Faso is based on information 

compiled or approved by Guy Scherrer. Guy Scherrer is an employee of Sarama Resources Ltd and is a member in good standing of the Ordre des 

Géologues  du  Québec  and  has  sufficient  experience  which  is  relevant  to  the  commodity,  style  of  mineralisation  under  consideration  and  activity 

which he is undertaking to qualify as a Qualified Person under National Instrument 43‐101.   Guy Scherrer consents to the inclusion in this report of 

the information, in the form and context in which it appears. 

Scientific  or  technical  information  in  this  news  release  that  relates  to  the  Company’s  references  to  the  exploration  activities  of  Teranga  Gold 

Corporation  and  Gryphon  Minerals  Limited  on  the  Golden  Hill  Project  in  Burkina  Faso  is  based  on  information  compiled  or  approved  by  Paul 

Schmiede.  Paul  Schmiede  is  an  employee  of  Sarama  Resources  Ltd  and  is  a  Fellow  in  good  standing  of  the  Australasian  Institute  of  Mining  and 

Metallurgy and has sufficient experience which is relevant to the  commodity, style of mineralisation under  consideration  and activity  which  he  is 

undertaking  to  qualify  as  a  Qualified  Person  under  National  Instrument  43‐101.   Paul  Schmiede  consents  to  the  inclusion  in  this  report  of  the 

information, in the form and context in which it appears. 

Scientific or technical information in  this news release that relates to the preparation of the South Houndé Project’s mineral resource estimate is 

based on information compiled or approved by Adrian Shepherd.  Adrian Shepherd is an employee of Cube Consulting Pty Ltd and is considered to be 

independent of Sarama Resources Ltd.  Adrian Shepherd is a Chartered Professional Member in good standing of the Australasian Institute of Mining 

and Metallurgy and has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is 

undertaking to qualify as a Qualified Person under National Instrument 43‐101.  Adrian Shepherd consents to the inclusion in this news release of the 

information, in the form and context in which it appears. 

Scientific or technical information in this news release that relates to the preparation of the Karankasso Project’s mineral resource estimate is based 

on  information  compiled  or  approved  by  Eugene  Puritch  and  Antoine  Yassa.  Eugene  Puritch  and  Antoine  Yassa  are  employees  of  P&E  Mining 

Consultants Inc. and are considered to be independent of Savary Gold Corp. and Sarama Resources Ltd. Antoine Yassa is a member in good standing 

of  the  Ordre  des  Géologues  du  Québec  and  Eugene  Puritch  is  a  member  in  good  standing  of  Professional  Engineers  Ontario.  Eugene  Puritch  and 

Antoine Yassa have sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which they are 

undertaking to qualify as a Qualified Person under National Instrument 43‐101. Eugene Puritch and Antoine Yassa consent to the inclusion in this 

news  release  of  the  information,  in  the  form  and  context  in  which  it  appears.   Sarama  has  not  independently  verified  Savary’s  mineral  resource 

estimate and takes no responsibility for its accuracy. 

Scientific  or  technical  information  in  this  news  release,  in  respect  of  the  Bondi  Deposit  relating  to  mineral  resource  and  exploration  information 

drawn from the Technical Report prepared for Orezone on that deposit has been approved by Guy Scherrer.  Guy Scherrer is an employee of Sarama 

Resources  Ltd  and  is  a  member  in  good  standing  of  the  Ordre  des  Géologues  du  Québec  and  has  sufficient  experience  which  is  relevant  to  the 

commodity,  style  of  mineralisation  under  consideration  and  activity  which  he  is  undertaking  to  qualify  as  a  Qualified  Person  under  National 

Instrument 43‐101.  Guy Scherrer consents to the inclusion in this report of the information, in the form and context in which it appears.