Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

SVRS.V ·

SILVER STORM DRILLS 473 g/t Ag.Eq(1,2) OVER 3.6 m AND 137 g/t Ag.Eq OVER 12.0 m, EXTENDS THE SAN NICOLAS ZONE AT DEPTH Toronto, Ontario, April 21, 202 6: Silver Storm Mining Ltd. (“ Silver Storm ” or the " Company")

Drill Results

NEWS RELEASE

SILVER STORM DRILLS 473 g/t Ag.Eq(1,2) OVER 3.6 m AND 137 g/t Ag.Eq OVER 12.0 m,

EXTENDS THE SAN NICOLAS ZONE AT DEPTH

Toronto, Ontario, April 21, 202 6: Silver Storm Mining Ltd. (“ Silver Storm ” or the " Company")

(TSX.V: SVRS | OTCQB: SVRSF | FSE: SVR), is pleased to announce drill results from the diamond

drilling program at the Company’s 100%-owned La Parrilla Silver Mine Complex (“La Parrilla”) located

in Durango, Mexico. Results from the holes (910 metres (“m”)) contained within this release are from

the San Nicolas Zone (“San Nicolas”) within the past-producing Quebradillas mine.

Key highlights include:

• Hole IDP-SN-26-001 returned 473 g/t Ag.Eq over 3.60 m, including 740 g/t Ag.Eq over 1.65

m and 527 g/t Ag.Eq over 0.90 m.

• Hole IDP-SN-26-001, combined with previously drilled holes, confirmed the presence of a high-

grade block of mineralization extending at least 90 m above the last mined stopes at San

Nicolas along a minimum strike length of 45 m.

• Hole IDP-SN-26-003 returned 137 g/t Ag.Eq over 11.95 m, including 320 g/t Ag.Eq over

2.75 m and 507 g/t Ag.Eq over 0.90 m.

• Hole IDP-SN-26-004 returned 420 g/t Ag.Eq over 0.40 m.

• Hole IDP-SN-26-005 returned 275 g/t Ag.Eq over 1.05 m.

• Hole EDP-SN-26-001 returned 149 g/t Ag.Eq over 8.45 m, including 285 g/t Ag.Eq over

3.50 m.

• Hole EDP-SN-26-002 returned 183 g/t Ag.Eq over 3.20 m , including 299 g/t Ag.Eq over

1.35 m.

• Hole EDP-SN-26-003 returned 137 g/t Ag.Eq over 1.10 m and 131 g/t Ag.Eq over 1.30 m.

• Holes IDP-SN-26-003 to 005 and EDP-SN-26-001 to 003, combined with the holes drilled as

part of previous drilling programs conducted by the Company, have the potential to extend the

Indicated and Inferred Resources at depth by additional 70 m and 45 m, respectively.

Greg McKenzie, President and CEO , commented: “We are pleased with the exploration and infill

drilling results at San Nicolas. Hole IDP-SN-26-001 has confirmed the presence of a high-grade block

of mineralization extending 90 m above the last mined stopes, while holes IDP-SN-26-003 to 005 and

EDP-SN-26-001 to 003 have confirmed the extension of the zone more than 85 m at depth below the

last mined stopes. These drill results have the potential to contribute towards expanding the La Parrilla

Mineral Resource at the San Nicolas Zone which remains open at depth.”

San Nicolas Zone

The San Nicolas Zone is considered part of the Quebradillas mine, located approximately 400 m to

the southwest, and connected to Quebradillas by underground development utilizing shared services

from the mine. San Nicolas had five development levels established and mined by First Majestic Silver

Corp. (“First Majestic”) and a ventilation raise from surface down to a depth of 275 m. As a result of

the drilling conducted by Silver Storm, the high-grade silver mineralization at San Nicolas can

now be traced with continuity down to a depth of approximately 480 m below surface.

The San Nicolas Zone is comprised of subvertical quartz -carbonate vein and breccia mineralization

striking northwest over approximately 600 m. Sulphide replacement zones occur within the hanging

wall and footwall along the bedding within the sediments. The sulphide mineralization is comprised of

pyrite, galena, sphalerite, acanthite, and native silver. A second set of east -west trending sulph ide-

bearing quartz-carbonate veins crosscuts the principal northwest trend. Breccia pipes (chimneys) form

at the intersection of these two trends.

Figure 1: Cross section view of the Quebradillas mine

Hole IDP-SN-26-001 was drilled 50 m above the topmost mined 1921 EL stope and returned 473 g/t

Ag.Eq over 3.60 m , including 740 g/t Ag.Eq over 1.65 m and 527 g/t Ag.Eq over 0.90 m . The

composited weighted average grade of historical channel samples from the 1921 EL stope returned

215 g/t Ag.Eq over a strike length of 19 m and an average width of 1.49 m.

Hole IDP-SN-26-001 was drilled in proximity to other holes that had been drilled as part of the previous

drilling programs at San Nicolas and is located:

• 22 m above and southeast of hole Q-23-024 (686 g/t Ag.Eq over 9.39 m ) and 25 m below

and southeast of the historic hole ILP-SN-19-08 (475 g/t Ag.Eq over 7.50 m) drilled by First

Majestic (see the news release published by the Company on January 29, 2024)

• 30 m above and northwest of hole Q-24-054 (294 g/t Ag.Eq over 7.00 m ) and 32 m below

and northwest of hole Q-24-056 (616 g/t Ag.Eq over 1.02 m) (see the news release published

by the Company on January 6, 2025).

Collectively these holes, along with the historic hole SLP-SN-12-02 (248 g/t Ag.Eq over 2.15 m) drilled

by First Majestic, confirm the presence of a high-grade block of mineralization, extending at least

90 m above the last mined stopes in San Nicolas along a minimum strike length of 45 m . The

high-grade block was classified as part of the Indicated Resources in the National Instrument 43-101

– Standards of Disclosure for Mineral Projects (“ NI 43-101”) Technical Report entitled "Independent

Technical Report for the La Parrilla Silver Mine, Durango State, Mexico" with an effective date of March

24, 2025 (“Technical Report”).

Holes IDP-SN-26-003 to 005 and EDP -SN-26-001 to 003 targeted the southeast depth extension of

San Nicolas, where previous drilling programs produced the following results:

• Hole Q-23-013A (584 g/t Ag.Eq over 1.00 m within a broader interval of 276 g/t Ag.Eq

over 4.09 m) and hole Q-23-014 (225 g/t Ag.Eq over 1.90 m) (see the news release published

by the Company on January 29, 2024)

• Hole Q-24-063 (632 g/t Ag.Eq over 0.40 m and 450 g/t Ag.Eq over 0.50 m) (see the news

release published by the Company on January 6, 2025)

Highlights from holes IDP-SN-26-003 to 005 and EDP-SN-26-001 to 003 include:

• Hole IDP-SN-26-003 returned 137 g/t Ag.Eq over 11.95 m, including 320 g/t Ag.Eq over

2.75 m and 507 g/t Ag.Eq over 0.90 m

• Hole IDP-SN-26-004 returned 252 g/t Ag.Eq over 0.40 m and 420 g/t Ag.Eq over 0.40 m

• Hole IDP-SN-26-005 returned 275 g/t Ag.Eq over 1.05 m

• Hole EDP-SN-26-001 returned 149 g/t Ag.Eq over 8.45 m, including 285 g/t Ag.Eq over

3.50 m

• Hole EDP-SN-26-002 returned 183 g/t Ag.Eq over 3.20 m, including 299 g/t Ag.Eq over

1.35 m

• Hole EDP-SN-26-003 returned 137 g/t Ag.Eq over 1.10 m and 131 g/t Ag.Eq over 1.30 m

These six holes have extended the San Nicolas mineralization to ~85 m below the bottommost 1874

EL stope. The composited weighted average grade of historical channel samples from the 1874 EL

stope returned 279 g/t Ag.Eq over a strike length of 35 m and average width of 1.15 m. By using the

classification criteria established in the Technical Report, these holes have the potential to extend

the Indicated Resources by additional 70 m at depth over a minimum strike length of 65 m and

to extend the Inferred Resources by additional 45 m at depth.

Silver Storm has recently added a second underground drill rig to advance the current drilling program

more rapidly. A total of 44 holes have been drilled to date (~3,000 m).

Figure 2: Longitudinal section of the San Nicolas Zone (view to NE)

For further information, the NI 43-101 Technical Report entitled "Independent Technical Report for the

La Parrilla Silver Mine, Durango State, Mexico" with an effective date of March 24, 2025 is available

for review on SEDAR (www.sedarplus.ca) and on the Company's website (www.silverstorm.ca).

Figure 2: Longitudinal section of the San Nicolas Zone (view to NE)

Table 1(1) – Select assay intervals from holes EDP-SN-26-001 to 003 and IDP-SN-26-001 to 005;

results from previous drilling conducted by Silver Storm and historic assay results

Zone Hole From To Length

(m)

ETW(3)

(m)

Ag.Eq(2)

g/t

Ag

g/t

Au

g/t

Pb

%

Zn

%

SN EDP-SN-26-001 107.40 115.85 8.45 6.51 149 111 0.07 0.52 1.10

including 109.50 113.00 3.50 2.70 285 208 0.13 1.04 2.38

SN EDP-SN-26-002 101.15 104.35 3.20 1.60 183 139 0.09 0.64 1.26

including 103.00 104.35 1.35 0.67 299 251 0.13 0.97 0.93

SN EDP-SN-26-003 118.15 119.25 1.10 0.78 137 64 0.07 1.84 1.57

SN EDP-SN-26-003 123.05 124.35 1.30 0.92 131 77 0.09 0.70 1.71

SN IDP-SN-26-001 83.00 83.60 0.60 0.56 196 113 0.04 0.72 3.44

SN IDP-SN-26-001 86.00 86.60 0.60 0.56 209 158 0.02 0.76 1.82

SN IDP-SN-26-001 91.85 95.45 3.60 3.35 473 465 0.01 0.23 0.12

including 91.85 93.50 1.65 1.53 740 727 0.01 0.37 0.24

and 94.55 95.45 0.90 0.84 527 522 0.01 0.18 0.03

SN IDP-SN-26-003 49.50 61.45 11.95 7.77 137 133 0.02 0.05 0.07

including 49.50 52.25 2.75 1.79 320 312 0.05 0.11 0.07

and 60.55 61.45 0.90 0.59 507 504 0.00 0.03 0.10

SN IDP-SN-26-004 35.75 36.15 0.40 0.39 252 97 0.09 2.69 4.91

SN IDP-SN-26-004 40.00 40.40 0.40 0.39 420 247 0.01 4.17 4.63

SN IDP-SN-26-005 53.05 54.10 1.05 0.91 275 182 0.03 3.32 1.22

PREVIOUS RESULTS

SN Q-23-013A 87.49 91.58 4.09 4.01 276 172 0.01 2.18 3.08

including 88.55 89.55 1.00 0.98 584 379 0.01 4.37 6.11

and 90.00 91.58 1.58 1.55 252 135 0.02 2.40 3.51

SN Q-23-013A 106.87 107.17 0.30 0.29 452 199 0.05 6.06 6.65

SN Q-23-014 111.80 113.70 1.90 1.65 225 174 0.07 1.71 0.55

SN Q_23_024 71.75 81.14 9.39 8.83 686 676 0.01 0.32 0.13

including 72.75 78.00 5.25 4.94 997 988 0.01 0.33 0.10

SN Q_23_025 85.65 86.74 1.09 0.71 181 101 0.02 1.37 2.63

SN Q-24-054 98.80 105.80 7.00 6.09 294 273 0.02 0.47 0.54

including 99.30 99.80 0.50 0.44 410 389 0.03 0.15 0.80

and 102.80 105.30 2.50 2.18 528 507 0.01 0.92 0.11

SN Q-24-056 116.70 117.30 0.60 0.52 220 103 0.01 1.00 5.10

SN Q-24-056 122.13 123.15 1.02 0.89 616 606 0.03 0.32 0.05

NEW Q-24-060 106.48 106.99 0.51 0.51 201 197 0.04 0.37 0.22

SN Q-24-063 94.85 95.25 0.40 0.39 632 593 0.06 1.62 0.08

SN Q-24-063 97.75 98.25 0.50 0.49 450 405 0.01 0.94 1.33

HISTORICAL RESULTS

SN ILP-SN-16-01-A 405.45 407.20 1.75 1.72 1,555 1,479 0.13 1.25 2.09

SN ILP-SN-16-05 464.80 465.45 0.65 0.64 153 143 0.05 0.24 0.09

SN ILP-SN-17-35 211.85 212.50 0.65 0.50 414 310 0.07 1.71 3.35

SN and 222.40 224.60 2.20 1.69 1,192 1,186 0.01 0.21 0.06

SN ILP-SN-17-36 257.80 262.30 4.50 3.47 889 854 0.08 0.38 1.08

SN ILP-SN-19-01 263.40 264.30 0.90 0.81 156 113 0.11 0.70 1.00

SN ILP-SN-19-03 230.80 231.55 0.75 0.75 228 165 0.01 1.31 1.93

SN ILP-SN-19-04 301.05 301.55 0.50 0.40 522 26 5.90 0.02 0.06

SN ILP-SN-19-08 186.10 193.60 7.50 7.05 475 325 0.03 3.71 3.80

SN including 190.15 193.60 3.45 3.24 855 380 0.02 0.91 0.40

SN ILP-SN-19-09 202.35 203.25 0.90 0.64 407 380 0.02 0.91 0.40

SN SLP-SN-12-02 181.05 183.20 2.15 1.72 248 135 0.04 1.43 4.22

SN SLP-SN-12-03 276.85 278.85 2.00 1.30 133 96 0.07 0.75 0.86

and 291.45 293.90 2.45 1.59 262 150 0.03 2.62 3.03

SN SLP-SN-12-05 149.95 150.55 0.60 0.46 950 776 0.38 4.01 3.16

SN ILP-SN-19-05 223.00 223.50 0.50 0.49 255 238 0.14 0.22 0.05

SN SN-02 122.60 124.40 1.80 1.28 411 367 0.10 1.46 0.30

SN SN-03 122.05 123.10 1.05 0.65 142 124 0.00 0.57 0.33

SN SN-04 44.80 45.70 0.90 0.50 267 245 0.07 0.80 0.03

Table 2(1) – Historical Channel Sample Results (4) – San Nicolas Zone

Elevation Zone Channel TW(3)

(m)

Ag.Eq(1)

g/t

Ag

g/t

Pb

%

Zn

%

1874 SN NW VSN-1873-26 1.10 291 135 1.55 6.58

1874 SN NW VSN-1873-29 2.30 224 175 1.20 1.29

1874 SN SW VSN-1874-40 3.50 666 312 4.99 13.38

1874 SN SW VSN-1874-44 2.70 300 150 3.23 4.47

1874 SN SW VSN-1874-45 2.90 284 139 3.49 3.89

1874 SN SW VSN-1875-43 0.50 415 355 2.66 0.28

1874 SN SW VSN-1875-51 5.30 505 424 2.09 2.01

1874 SN SE VSN-1874-42 3.10 262 195 2.05 1.31

1874 SN SE VSN-1874-54 3.20 257 231 1.02 0.29

1874 SN SE VSN-1874-56 2.80 209 176 0.92 0.77

1874 SN SE VSN-1874-58 0.40 143 60 1.83 2.39

1874 SN SE VSN-1873-62 0.40 246 103 3.24 4.06

1874 SN SE VSN-1873-64 0.30 157 64 2.17 2.55

1874 SN SE VSN-1873-65 0.70 612 253 7.30 11.10

1874 SN SE VSN-1873-66 1.70 122 40 1.49 2.75

1874 SN SE VSN-1873-73 0.30 124 41 1.58 2.70

1874 SN SE VSN-1873-75 0.30 33 0 0.15 1.58

1874 SN SE VSN-1873-76 0.40 888 405 11.20 13.50

1874 SN SE VSN-1873-78 0.60 131 39 1.38 3.36

1874 SN SE VSN-1873-79 0.80 439 217 7.27 3.87

1886 SN SE2 VSN-1885-82 0.70 119 88 0.58 1.00

1886 SN SE2 VSN-1885-84 0.65 225 103 2.90 3.33

1886 SN SE2 VSN-1885-89 3.65 254 103 3.47 4.25

1886 SN SE2 VSN-1885-92 0.60 253 73 3.83 5.38

1886 SN SE1 VSN-1886-108 1.10 183 96 2.45 1.93

1886 SN SE1 VSN-1886-111 3.15 154 65 2.05 2.48

1886 SN SE1 VSN-1886-112 2.40 223 146 2.15 1.74

1886 SN SE1 VSN-1886-113 0.85 293 192 3.40 1.67

1886 SN SE1 VSN-1886-115 0.60 404 253 4.12 3.56

1887 SN W VSN-1888-47 1.75 115 90 0.81 0.47

1887 SN W VSN-1888-48 5.05 142 86 1.50 1.34

1887 SN W VSN-1886-49 2.00 219 120 2.78 2.24

1887 SN W VSN-1886-51 1.65 408 356 1.39 1.26

1882 SN NW VSN-1888-28 0.50 345 307 1.15 0.76

1882 SN NW VSN-1887-31 2.30 262 242 0.59 0.38

1882 SN NW VSN-1887-37 2.00 179 112 2.51 0.82

1882 SN NW VSN-1887-40 3.00 364 337 1.01 0.35

1882 SN NW VSN-1887-43 4.90 231 142 2.57 1.95

1882 SN NW VSN-1887-49 6.45 439 325 3.59 2.18

1882 SN NW VSN-1887-52 4.20 237 63 2.54 6.46

1882 SN NW VSN-1888-48 2.10 317 205 3.74 1.86

1882 SN NW VSN-1888-51 3.70 407 344 2.35 0.79

1882 SN NW VSN-1887-55 0.65 195 61 1.91 5.01

1882 SN NW VSN-1884-60 1.75 262 122 2.52 4.67

1882 SN NW VSN-1883-63 1.75 316 197 3.00 3.04

1882 SN NW VSN-1885-57 2.70 187 101 2.33 2.05

1882 SN NW VSN-1887-58 1.20 377 163 3.93 7.09

1882 SN NW VSN-1887-61 1.40 407 163 5.50 6.97

1882 SN NW VSN-1887-64 2.20 474 119 3.80 14.66

1882 SN NW VSN-1882-66 1.20 339 166 4.05 4.79

1901 SN SE VSN-1901-26 0.70 108 51 1.51 1.39

1901 SN SE VSN-1901-29 1.45 329 150 5.35 3.70

1901 SN SE VSN-1901-32 0.60 225 126 2.88 2.10

1901 SN SE VSN-1901-35 1.30 128 93 1.01 0.72

1901 SN SE VSN-1901-38 2.80 311 132 4.19 4.93

1901 SN SE VSN-1901-44 1.30 150 88 1.92 1.20

1901 SN SE VSN-1901-47 1.60 123 58 1.55 1.76

1901 SN SE VSN-1901-50 4.20 177 99 2.25 1.72

1901 SN SE VSN-1901-53 5.20 445 411 1.51 0.78

1921 SN NW VSN-1921-L49 0.40 126 105 0.10 1.01

1921 SN NW VSN-1921-L52 1.70 368 277 1.08 3.67

1921 SN SE VSN-1921-L70 2.50 302 183 0.01 0.03

1921 SN SE VSN-1921-L73 1.60 350 173 4.08 4.94

1921 SN SE VSN-1921-L76 1.85 204 112 2.16 2.55

1921 SN SE VSN-1921-L79 0.85 101 62 0.50 1.51

1921 SN SE VSN-1921-L82 0.90 101 73 0.80 0.61

1921 SN SE VSN-1921-L84 2.10 316 227 2.15 2.36

1921 SN SE VSN-1921-L85 0.60 181 107 2.96 0.72

1921 SN SE VSN-1921-L88 1.50 163 94 1.95 1.58

(1) The individual grades of the metals that were used as inputs into the metal equivalent Ag.Eq g/t are provided

in Tables 1 & 2.

(2) All results in this release are rounded. Assays are uncut and undiluted. Widths are core -lengths, not true

widths. Silver equivalent: Ag.Eq g/t was calculated using commodity prices of US$30.00 /oz Ag, US$2,500 /oz

Au, US$0.95 /lb Pb, and US$1.25 /lb Zn applying metallurgical recoveries of 70.1% for silver and 82.8% for

gold in oxides and 79.6% for silver, 80.1% for g old, 74.7% for lead and 58.8% for zinc in sulphides. Metal

payable used was 99.6% for silver and 95% for gold in doré produced from oxides, and 95% for silver, gold,

and lead and 85% for zinc in concentrates produced from sulphides. Cut-off grades considered for oxide and

sulphide were 135 g/t Ag.Eq and 115 g/t Ag.Eq , respectively. The cut -off grades were based on 2017 costs

adjusted by the inflation rate and include sustaining costs.

(3) Estimated true widths (“ETW”) of mineralization have been calculated from core -lengths for drill core where

orientation of the zone is known; channel samples were taken perpendicular across the width of mineralization

and are considered true widths (“TW”).

(4) Weighted average grades were calculated over the mineralized widths of each channel across the stope

(Table 2, Figure 2).

Sample Analysis and QA/QC Program

Silver Storm uses a quality assurance/quality control (QA/QC) program that monitors the chain of

custody of samples and includes the insertion of blanks, duplicates, and reference standards in each

batch of samples sent for analysis. The drill core is phot ographed, logged, and cut in half, with one

half retained in a secured location for verification purposes and one half shipped for analysis. Sample

preparation (crushing and pulverizing) is performed at ALS Geochemistry, an independent ISO 9001:

2001 certified laboratory, in Zacatecas, Mexico and pulps are sent to ALS Geochemistry in Vancouver,

Canada for analysis. The entire sample is crushed to 70% passing -2 mm, and a riffle split of 250

grams is taken and pulverized to better than 85% passing 75 microns. Samples are analyzed for gold

using a standard fire assay with Atomic Absorption Spectrometry (AAS) (Au -AA23) from a 30 -gram

pulp. Gold assays greater than 10 g/t are re -analyzed on a 30 -gram pulp by fire assay with a

gravimetric finish (Au -GRA21). Samples are also analyzed using a 34 element inductively coupled

plasma (ICP) method with atomic emission spectroscopy (AES) on a pulp digested by four acids (ME-

ICP61). Overlimit sample values for silver (>100 g/t), lead (>1%), zinc (>1%), and copper (>1%) are

re-assayed using a four-acid digestion overlimit method with ICP -AES (ME-OG62). For silver values

greater than 1,500 g/t, samples are re-assayed using a fire assay with gravimetric finish on a 30-gram

pulp (Ag-GRA21). Samples with lead values over 20% are re-assayed using volumetric titration with

EDTA on a 1-gram pulp (Pb-VOL70). No QA/QC issues were noted with the results reported herein.

Qualified Person

The scientific and technical information in this document has been reviewed and approved by B ruce

Robbins, P.Geo. , Chief Geologist of the Company , engaged as an independent consultant to the

Company, a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for

Mineral Projects.

About Silver Storm Mining Ltd.

Silver Storm Mining Ltd. holds advanced-stage silver projects located in Durango, Mexico. Silver Storm

is committed to advancing toward a potential near -term restart of its 100% -owned La Parrilla Silver

Mine Complex, a prolific operation comprised of a 2,000 tpd mill and three underground mines. Silver

Storm also holds a 100% interest in the San Diego Project which ranks among the largest undeveloped

silver projects in Mexico. For more information regarding the Company and its projects, please visit

our website at www.silverstorm.ca.

For additional information, please contact:

Greg McKenzie, President & CEO

Ph: +1 (416) 504-2024

[email protected]

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the

TSXV) accepts responsibility for the adequacy or accuracy of this news release.