Silver Storm Announces Mobilization of Underground MINE Development Contractors at LA Parrilla
NEWS RELEASE
SILVER STORM ANNOUNCES MOBILIZATION OF UNDERGROUND MINE
DEVELOPMENT CONTRACTORS AT LA PARRILLA
Toronto, Ontario, May 07, 2026: Silver Storm Mining Ltd. (“Silver Storm” or the "Company") (TSX.V:
SVRS | OTCQX: SVRSF | FSE: SVR) is pleased to announce the mobilization of underground mine
development contractors at the Company’s 100% -owned past-producing La Parrilla Silver Mine
Complex (“La Parrilla”) located in Durango State, Mexico.
Silver Storm engaged MINPRO S.A. de C.V. (“MINPRO”) and Constructora Mexgeo S. de R.L. de
C.V. (“ Mexgeo”) to provide contract underground mine development services at La Parrilla. The
mobilization of MINPRO and Mexgeo is ongoing and expected to be completed by the end of May
2026.
Greg McKenzie, President and CEO, stated, “We are excited to have engaged two very experienced
mine development contractor companies with strong operational track records in Mexico to provide
services at La Parrilla . Mobilization of these contractors is a key step toward a potential restart of
operations at La Parrilla in the second quarter of 2026.”
Contractor overview: MINPRO and Mexgeo are well-established Mexican mining contractor firms
supporting gold, silver, and polymetallic operations across Mexico’s principal producing regions.
• MINPRO, founded in 2008 and headquartered in Chihuahua, provides underground and open-
pit development, drilling, blasting, and haulage services. MINPRO is recognized for its strong
safety performance, engineering discipline, and reliable execution, supported by an integrated
equipment fleet and a technically trained workforce. MINPRO’s operational scale and project
delivery record position it as a stable partner for long-term mine development programs.
• Mexgeo, founded in 2011 and based in Torreón, Coahuila, delivers underground development,
exploration support, and civil works supported by a technically experienced team with deep
mining industry tenure. Mexgeo emphasizes disciplined project management, value-driven
execution, and safety, offering an integrated service model that supports sustainable and
efficient mine development.
Together, MINPRO and Mexgeo bring complementary technical capabilities and a proven operational
track record to the restart program at La Parrilla.
Qualified Person
The scientific and technical information in this document has been reviewed and approved by Shane
Ghouralal, P.Eng., Director, Technical Services of the Company, a Qualified Person as defined by
National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).
About Silver Storm Mining Ltd.
Silver Storm Mining Ltd. holds advanced-stage silver projects located in Durango, Mexico. Silver Storm
is committed to advancing toward a potential near-term restart of its 100% -owned La Parrilla Silver
Mine Complex, a prolific operation comprised of a 2,000 tpd mill and three underground mines. The
Company also holds a 100% interest in the San Diego Project which ranks among the largest
undeveloped silver projects in Mexico. For more information regarding the Company and its projects,
please visit our website at www.silverstorm.ca.
For additional information, please contact:
Greg McKenzie, President & CEO
Ph: +1 (416) 504-2024
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the
TSXV) accepts responsibility for the adequacy or accuracy of this news release.
Cautionary Note Regarding Forward Looking Statements:
Certain statements in this news release are forward -looking and involve a number of risks and
uncertainties. Such forward-looking statements are within the meaning of the phrase ‘forward-looking
information’ in the Canadian Securities Administrators’ National Instrument 51 -102 – Continuous
Disclosure Obligations. Forward -looking statements are not comprised of historical facts. Forward -
looking statements include estimates and statements that describe the Company’s future plans,
objectives, or goals, including words to the effect that the Company or management and Qualified
Persons (in the case of technical and scientific information) expect a stated condition or result to occur.
Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”,
“estimates”, “may”, “could”, “would”, “will”, or “plan”. Since forward-looking statements are based on
assumptions and address future events and conditions, by their very nature they involve inherent risks
and uncertainties. Although these statements are based on information currently available to the
Company, the Com pany provides no assurance that actual results will meet management’s
expectations. Risks, uncertainties, and other factors involved with forward -looking information could
cause actual events, results, performance, prospects, and opportunities to differ materially from those
expressed or implied by such forward -looking information. Forward -looking information in this news
release includes but is not limited to: the Company's plans and expectations for La Parrilla; the timeline
for the completion of the mobilization of underground mine development contractors at La Parrilla; the
Company’s expectation to restart operations at La Parrilla in the second quarter of 2026; and the
timeline and ability to place the La Parrilla Silver Mine Complex back into operation.
In making the forward -looking statements included in this news release, the Company has applied
several material assumptions, including , among other things , the absence of material adverse
changes in market conditions, metal prices, permitting status, operating conditions, labour availability,
and access to required equipment, parts, and consumables . The Company cautions that its decision
to potentially restart operations at La Parrilla, and any related production decisions, are largely based
on internal Company data, historical operating results, reports, and engineering assessments and are
not supported by a current mineral reserve estimate prepared in accordance with NI 43 -101,
preliminary economic assessments, pre -feasibility studies, or feasibility studies that demonstrate
economic and technical viability. As a result, there is increased uncertainty and a higher degree of
economic and technical risk associated with any such production decision than would be the case if
such mineral reserves estimates or studies were completed and relied upon to support a production
decision. No mineral reserves have been established for La Parri lla, and mineral resources that are
not reserves do not have demonstrated economic viability. The absence of mineral reserve estimates
prepared in accordance with NI 43-101, preliminary economic assessments, pre-feasibility studies, or
feasibility studies supporting a production decision increases the uncertainty of achieving any
particular level of mineral recovery or the cost of such recovery and heightens the risks associated
with developing a commercially mineable deposit. Historically, projects advanced without the support
of such mineral reserves estimates and studies have ex perienced a significantly higher incidence of
economic and technical failure. There can be no assurance that production at La Parrilla will
commence as anticipated or at all, or that any anticipated production levels or operating costs will be
achieved. A failure to commence production would have a material adverse effect on the Company’s
ability to generate revenue and cash flow to fund its operations. Similarly, a failure to achieve
anticipated production costs would have a material adverse effect on the Company’s cash flow and
future profitability.
Forward-looking statements and information are subject to various known and unknown risks and
uncertainties, many of which are beyond the ability of the Company to control or predict, that may
cause the Company’s actual results, performance , or achievements to be materially different from
those expressed or implied thereby, and are developed based on assumptions about such risks,
uncertainties, and other factors set out herein.
Such forward-looking information represents management ’s and Qualified Persons ’ (in the case of
technical and scientific information) best judgment based on information currently available. No
forward-looking statement can be guaranteed, and actual future results may vary materially.
Accordingly, readers are advised not to place undu e reliance on forward -looking statements or
information.