Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SVM.TO ·

Silvercorp Reports High-Grade Mineralization Discovery Below Current Production Levels Within Major Vein Structures at GC AG-Pb-Zn MINE IN Guangdong Province, China

Drill Results

1

NEWS RELEASE

Trading Symbol: TSX: SVM

NYSE AMERICAN: SVM

SILVERCORP REPORTS HIGH-GRADE MINERALIZATION DISCOVERY BELOW CURRENT

PRODUCTION LEVELS WITHIN MAJOR VEIN STRUCTURES AT GC AG-PB-ZN MINE IN

GUANGDONG PROVINCE, CHINA

VANCOUVER, British Columbia – February 14, 2018 – Silvercorp Metals Inc. ("Silvercorp” or

the “Company”) (TSX:SVM / NYSE AMERICAN: SVM) is pleased to report results of its 201 6

and 2017 exploration program at its GC Ag-Pb-Zn mine, Guangdong Province, China.

In 2016 an d 2017, the Company launched ext ensive exploration program and completed a

total of 33,029 meters (“m”) of underground diamond drilling and 19,619 m of exploration

tunneling at its GC Ag -Pb-Zn mine. Significant high -grade mineralized zone s have been

exposed at and below the current production levels, and major mineralized zones have been

extended along strike and downdip.

The drilling program included infill drilling to define and upgrade the current resource model,

and step -out drilling for new resources surrounding and below the current resource area.

Between 2016 and 2017, 294 NQ sized diamond drill holes with total length of 33,029

meters were accomplished at 7 production levels from 150 m to -200 m at 50 m interval (the

elevation of the head frame is 258.5 m) . Among them, 153 holes intersected ore veins with

Ag equivalent (AgEq) values greater than 194 g/t, and another 36 holes hit mineralized veins

with AgEq values between 97 and194 g/t (Tab. 1).

Table 1: Summary of the drilling programs in 2016 and 2017

Year Meters

Drilled

Holes

Completed

Samples

Collected

Holes Intercepted

Mineralization

Holes Intercepted

Ore

2016 11,878 129 2,235 29 77

2017 21,151 165 4,595 7 76

Total 33,029 294 6,830 36 153

In 2016 and 2017, 19,619 m of tunneling were driven along and across the major mineralized

vein structures to upgrade the resource model and test for new vein structures. These

included 7,767 m key drifts that exposed 4,803 m of ore veins, as well as 4,351 m of key

raises that exposed 3,002 m of ore veins (Tab. 2).

2

Table 2: Summary of the tunneling programs in 2016 and 2017

Year Tunneling

(m)

Samples

Collected

Key Drifts

Included (m)

Ore Exposed

in Drifts (m)

Key Raise

Included (m)

Ore Exposed

in Raises (m)

2016 9,152 4,063 2,482 1,980 1,683 1,266

2017 10,467 5,608 5,285 2,823 2,668 1,736

Total 19,619 9,671 7,767 4,803 4,351 3,002

Tables 3 and 4 below list assay results of some selected drill holes that intercepted ores and

drift tunnels that exposed ore zones in the 2016 and 2017 exploration programs.

Table 3: Selected drilling results from the 2016 and 2017 drilling programs at GC

mine

Year Hole ID From

(m)

To

(m)

True

Width

(m)

Vein Elevation

(m)

Ag

(g/t)

Pb

(%)

Zn

(%)

AgEq (1,2)

(g/t)

2016 CK10381 29.97 32.74 2.54 V12 52.1 97 0.11 9.65 590

2016 CK10582 85.74 89.84 2.84 V36 -73.7 78 2.66 3.21 383

2016 CK11201 17.44 19.65 2.02 V28-4 -152.0 233 4.68 2.30 601

2016 CK11301 11.68 27.51 8.64 V1 -151.9 48 2.03 6.08 464

2016 CK3086 0 8.2 6.39 V7E -101.2 90 0.62 1.69 209

2016 CK3087 0 6.27 3.58 V7E -100.4 134 1.48 4.01 416

2016 CK4083 82.22 87.6 4.48 V7N -145.4 45 1.24 3.53 290

2016 CK4083 103.44 109.69 5.20 V7E -157.4 49 0.91 2.07 203

2016 CK4084 50.88 60.04 7.35 V7E -115.4 43 0.89 3.87 286

2016 CK4280 17.25 21.71 3.48 V10 -99.9 45 1.69 5.65 421

2017 18CK26A04 126.59 132.08 3.77 V2-4 -316.7 72 0.91 3.72 309

2017 18CK26A05 277.32 281.96 3.31 V2-2 -463.7 171.2 1.99 5.12 537

2017 18CK28A05 295.05 297.97 1.97 V6-1 -453.0 310 2.13 14.69 1,167

2017 CK10586 114.16 116.39 1.61 V9W-2 89.2 491 0.69 5.63 813

2017 CK10588 33.11 37.23 2.83 V19 78.9 87 3.12 2.62 387

2017 CK10691 99.57 102.38 2.14 V33 43.1 191 3.68 3.09 545

2017 CK1080 83.13 84.28 1.11 V40 -2.6 758 1.97 2.98 1,015

2017 CK10982 117.35 128.37 6.51 V7E -193.2 55 2.02 3.55 343

2017 CK10986 97.06 100.35 3.23 V14 14.3 94 0.46 5.95 419

2017 CK2282 56.56 60.64 3.90 V9-9 -94.0 57 1.21 6.52 451

2017 CK2688 115.76 123.59 7.57 V2E1 -245.6 64 0.75 4.00 306

2017 CK26A84 135.49 138.33 2.56 V2E1 -294.6 92 1.58 5.74 467

2017 CK26A88 106.15 108.95 2.79 V2-1 -239.4 109 4.59 5.29 624

2017 CK26A88 128.67 134.78 5.53 V2E1 -248.1 58 0.82 5.65 388

2017 CK28A84 116.96 120.93 3.47 V2-4 -272.6 299 3.00 10.54 993

2017 CK28A84 143.19 152.1 7.79 V2E -289.4 143 3.58 4.08 542

2017 CK28A86 96.95 97.89 0.77 V18 142.0 932 5.83 5.05 1,501

3

2017 CK30A83 184.5 191.15 5.01 V2E -297.6 101 0.90 2.89 295

(1) Metal prices assumed: Ag USD19/Oz, Pb USD1.0/lb., Zn USD1.2/lb.

(2) Ag equivalent AgEq = Ag grade (g/t) + 53.9 x Pb grade (%) + 50.5 x Zn grade (%)

Table 4: Selected drifts that exposed ore zones at GC mine in 2016 and 2017

Drift ID Vein Elevation

(m)

Length

(m)

True

Width(m)

Ag

(g/t)

Pb

(%)

Zn

(%)

AgEq

(g/t)

V2W-(-150)-22YM V2W -150 128 1.89 132 2.77 3.48 457

V2W-(-150)-22AYM+CM V2W -150 54 8.00 132 3.12 4.63 534

V2E-(-150)-26EYM V2E -150 300 1.70 134 2.85 3.89 484

V2E-(-200)-28EYM V2E -200 117 2.69 99 1.25 4.19 379

-150-V2E1-26YM V2E1 -150 86 5.99 96 0.66 1.78 221

V2E1-(-200)-26AYM V2E1 -200 71 2.70 163 2.18 2.79 421

V7E(V36)-(-100)-40YM V7E -100 110 1.75 106 2.14 4.04 426

V9-5-(-150)-30WYM V9-5 -150 150 1.45 96 3.41 3.57 461

-100-V10-40AYM V10 -100 210 1.29 41 1.29 3.34 280

V10-1-0-42SYM V10-1 0 145 1.57 101 0.86 4.16 357

V14-50-(105-111)YM V14 50 163 0.83 129 1.93 6.15 544

-100-V16-22AYM V16 -100 208 1.73 44 0.48 2.75 209

V24-0-14SWYM V24 0 90 1.10 312 2.63 5.81 747

The step -out drilling and tunneling in the east of the mine defined new mineralized vein

structures including V7E、NV10、V14、V19、V31、V32 and V33. Vein V7E has been defined

95 m in strike length, 150 m in downdip length and 0.8 -1.75 m in width, with average gr ade

of 81 g/t Ag, 1.43 % Pb and 3.08% Zn. The exploration program at -150m and -200m levels

indicated that the length and width, ore continuity and ore grades improved greatly with the

increase of depth (Tab. 5).

Table 5: Increases of average grades in veins V2E and V2W with depth

Vein Level

(m)

Length

(m)

True Width

(m)

Ag

(g/t)

Pb

(%)

Zn

(%)

AgEq

(g/t)

V2E 100 30 1.52 212 1.42 0.59 318

50 164 1.24 71 1.73 2.83 307

0 229 1.02 74 1.32 2.40 266

-50 225 1.2 94 1.47 2.62 306

-100 450 1.48 105 1.33 2.80 318

-150 418 1.28 122 1.94 3.35 396

-200 400 1.92 126 2.10 3.82 432

V2W 100 77 3.57 100 0.15 2.20 219

50 174 2.15 118 0.83 3.91 360

0 106 3.03 139 1.71 3.38 402

-50 242 3.4 141 1.62 3.48 404

-100 128 2.19 120 1.39 2.51 322

-150 183 6.32 277 5.00 6.53 876

4

In addition, two drill holes, 18CK26A04 and 18CK28A05, hit high-grade mineralization with

true width of 3.31 m and 1.97 m, respectively, at elevation around -455 m. The host rock of

the mineralization is slate, which indicated that the mineralization system is not limited to

granite, but extend into the sedimentary rock underneath the granite intrusive. Also, t he

trend of increasing Ag, Pb, Zn and Cu grade s with depth continued to below -450 m

elevation. The assay results of the intercepted ore of drill hole 18CK28A05 are 310 g/t Ag,

2.13% Pb, 14.96% Zn, 0.73% Cu, 0.19% Sn and 0.34 g/t Au.

Quality Control

Drill core samples were taken from sawn half core for every 1.5m or limited by apparent wall

rock and mineralization contact. Half of the core was sent to the laboratory for analysis and

the other half retained for archive. The channel samples are collected along sample lines

perpendicular to the mineralized vein structure in exploration tunnels. Sample length ranges

from 0.2 m to more than 1.0 m, depending on the width of the mineralized vein and the

mineralization type. Spacing between sampling lines is typically 5 m along strike. Both the

mineralized vein and the a ltered wall rocks are cut with continuous chisel chipping. The

samples are individually secured in cotton sample bags and then collectively secured in rice

bags for shipment to the on-site laboratory.

For analysis, the sample is dried and crushed to minus 1 mm and then split to a 200 -300 g

subsample which is further pulverized to minus 200 mesh. A duplicate sample of minus 1

mm is made and kept at the laboratory archives. Two subsamples are prepared from the

pulverized sample. One is digested with two-acids for analysis of silver, lead, zinc and copper

with AAS. The other is retained as pulp reject at the lab for future reference.

A routine quality assurance/quality control (QA/QC) procedure is adopted to monitor the

analytical quality at the lab. Certified reference materials (CRMs), pulp duplicates and blanks

are inserted into each lab batch of samples. QA/QC data at the lab are a ttached to the assay

certificates for each batch of samples.

The Company maintains its own comprehensive QA/QC program to ensure best practices in

sample preparation and analysis of the exploration samples. Project geologists regularly

insert CRM, field duplicates and blanks to each batch of core samples to monitor the sample

preparation and analysis procedures at the labs. The analytical quality of the labs is further

evaluated with external checks by sending about 3 -5% of the pulp samples to higher leve l

labs to check for lab bias.

Data from both the Company's and the lab’s QA/QC programs are reviewed on a timely basis

by project geologists.

Guoliang Ma , P. Geo, Silvercorp’s Manager of Exploration and Resource, reviewed the

exploration data and prepared the scientific and technical information regarding exploration

results contained herein . He is the Qualified Person on the project as defined under

National Instrument 43-101 and has verified and approved the contents of this news release.

5

About Silvercorp

Silvercorp is a low -cost silver-producing Canadian mining company with multiple mines in China. The

Company's vision is to deliver shareholder value by focusing on the acquisition of under developed

projects with resource potential and the abi lity to grow organically. For more information, please visit

our website at www.silvercorp.ca.

For further information

Silvercorp Metals Inc.

Lorne Waldman

Senior Vice President

Phone: (604) 669-9397

Toll Free 1(888) 224-1881

Email: [email protected]

Website: www.silvercorp.ca

CAUTIONARY DISCLAIMER - FORWARD LOOKING STATEMENTS

Certain of the statements and information in this press release constitute “forward -looking statements” within

the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward -looking

information” within the meaning of applicable Canadian provincial securities laws. Forward-looking statements or

information relate to, among other things: the price of sil ver and other metals; the accuracy of mineral resource

and mineral reserve estimates and exploration results at the Company’s GC mine.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties

and other fa ctors that could cause actual events or results to differ from those reflected in the forward -looking

statements or information, including, without limitation, risks relating to: fluctuating commodity prices;

calculation of resources, reserves and minerali zation and precious and base metal recovery; interpretations and

assumptions of mineral resource and mineral reserve estimates; and exploration results. This list is not

exhaustive of the factors that may affect any of the Company’s forward -looking statem ents or information.

Forward-looking statements or information are statements about the future and are inherently uncertain, and

actual achievements of the Company or other future events or conditions may differ materially from those

reflected in the forwa rd-looking statements or information due to a variety of risks, uncertainties and other

factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year

ended March 31, 2017 under the heading “Risk Factors”. Although the Company has attempted to identify

important factors that could cause actual results to differ materially, there may be other factors that cause results

not to be as anticipated, estimated, described or intended. Accordingly, readers should no t place undue

reliance on forward-looking statements or information.

The Company’s forward-looking statements and information are based on the assumptions, beliefs, expectations

and opinions of management as of the date of this press release, and other than as required by applicable

securities laws, the Company does not assume any obligation to update forward -looking statements and

information if circumstances or management’s assumptions, beliefs, expectations or opinions should change, or

changes in any other events affecting such statements or information. For the reasons set forth above, investors

should not place undue reliance on forward-looking statements and information.