SILVERCORP REPORTS FINANCIAL AND OPERATING RESULTS FOR THE SECOND QUARTER OF FISCAL 2013 

VANCOUVER, British Columbia –  November 13, 2012  –  Silvercorp  Metals Inc.  (“Silvercorp” or the “Company”) (TSX: SVM) (NYSE: SVM) today reported its unaudited financial and operating results for the second quarter ended September 30, 2012 (“Q2 2013”).

This earnings release should be read in conjunction with the Company's Management Discussion &
Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which
have been posted on SEDAR at www.sedar.com and are also available on the Company's website
at www.silvercorp.ca.All figures are in United States dollars unless otherwise stated.

SECOND QUARTER HIGHLIGHTS 

  • Silver production of 1.3 million ounces;
  • Gold production of 2,481 ounces;
  • Sales of $45.2 million;
  • Net income of $9.5 million, or $0.06 per share;
  • Cash flow from operations of $23.9 million, or $0.14 per share;
  • Cash costs of negative $0.74 per ounce of silver at the Ying Mining District;
  • Payment of $4.2 million, or CAD$0.025 per share, in quarterly dividends to shareholders.

FINANCIALS 

In Q2 2013, the Company recorded net income attributable to equity holders of the Company of $9.5 million  or  $0.06  per  share,  compared  to  $18.5  million  or  $0.11  per  share,  in  the  quarter  ended September 30, 2011 (“Q2 2012”).  The decrease compared to prior year was primarily due to lower sales and higher production costs as well as fluctuations in foreign currency.

In Q2 2013, the Company recorded sales of $45.2 million, compared to $62.1 million in Q2 2012. This decrease was due to a lower silver price, which was $30.50 per ounce in Q2 2013, a decrease of 24% compared to $40.13 per ounce in Q2 2012.  During the quarter, the Company sold 1.3 million ounces of silver, comparable to the 1.4 million ounces of silver sold in Q2 2012.

Cost of sales in Q2 2013 was $16.4 million, an increase of 14%, compared to $14.4 million in Q2 2012. The cost of sales included cash costs of $13.7 million compared to $11.4 million in Q2 2012.  The increase  in  cost  of  sales  was  due  to  more  ore  being  mined  and  processed  along  with  a  higher production cost per tonne.  In Q2 2013, ore production increased by 16% to 240,447 tonnes, while overall production costs increased by 8% to $80 per tonne from $74 per tonne in Q2 2012.

Gross profit margin in Q2 2013 was 64%, compared to 77% in Q2 2012.

Cash  flow  from  operations  in  Q2  2013  was  $23.9  million  or  $0.14  per  share,  compared  to  $35.2 million, or $0.20 per share, in Q2 2012.

Comparing this quarter to the first quarter Fiscal 2013, net income increased $3.4 million or 55%. This increase was attributable to a decrease in overall production costs from $85 per tonne in the prior quarter to $80 per tonne in Q2 2013.  As such, the gross profit margin for this quarter improved to 64% compared to 57% in the previous quarter.

For the six months ended  September 30, 2012, net income was  $15.6 million or $0.09 per share compared  to  $44.1  million  or  $0.25  per  share,  in  the  same  prior  year  period.    During  the  same comparative periods, sales were $89.8 million compared to $131.8 million, cost of sales were $35.4 million compared to $28.5 million, which resulted in gross profit margins of 61% compared to 78%. Cash flow from operations was $43.2 million compared to $69.1 million over the same periods.

OPERATIONS

On  a  consolidated  basis,  in  Q2  2013,  the  Company  produced  1.3  million  ounces  of  silver,  2,481 ounces of gold, 13.9 million pounds of lead and 3.5 million pounds of zinc, compared to 1.4 million ounces of silver, 2,516 ounces of gold, 16.5 million pounds of lead and 3.2 million pounds of zinc in Q2 2012.

Compared  to  production  reported  for  the  first  quarter  of  Fiscal  2013,  the  Company  produced  an additional 117,000 ounces of silver in Q2 2013.  This increase is attributable to a 15% increase in ore mined and processed during the quarter.

As at September 30, 2012, inventory of 480 tonnes of direct smelting ore and 100 tonnes of lead concentrate remains on hand at the Ying Mining District, which is approximately 55,000 ounces of silver produced but not sold.

For the six months ended September 30, 2012, on a consolidated basis, the Company produced 2.5 million ounces of silver, 5,134 ounces of gold, 27.6 million pounds of lead and 6.5 million pounds of zinc, compared to 3.0 million ounces of silver, 3,905 ounces of gold, 37.1 million pounds of lead and 7.3 million pounds of zinc, respectively, in the same prior year period.

1. Ying Mining District, Henan Province, China

In Q2 2013, the Company mined 205,811 tonnes of ore at the Ying Mining District, an increase of 13%, compared to 182,542 tonnes in Q2 2012.  During the quarter, metal production totaled 1.3 million ounces of silver, 1,238 ounces of gold, 13.4 million pounds of lead and 3.4 million pounds of zinc, compared to 1.4 million ounces of silver, 903 ounces of gold, 16.5 million pounds of lead and 3.2 million pounds of zinc in Q2 2012.  Compared with metal production in first quarter of Fiscal 2013, there has been a 9% increase in silver production attributable to a 9% increase in ore processed. Grades were 224 grams per tonne (“g/t”) for silver, 3.4% for lead and 1.2% for zinc, compared to 271 g/t for silver, 4.6% for lead and 1.2% for zinc in the same quarter last year.

Compared to Q2 2012, production from HPG, TLP, and LM satellite mines in this quarter increased by 10% and represent 43% of total production at the Ying Mining District compared to 33% in the prior year.  The reduction in production from the SGX mine was a result of mechanical problems with one of  the  shafts  which  impacted  production  for  20  days  during  the  quarter.    This  shaft  is  fully operational again but as a result of this issue, the Ying Mining District realized lower overall grades in this quarter.

In Q2 2013, total and cash mining costs per tonne were $62.56 and $53.27 respectively compared to $57.23  and  $45.74  respectively  in  Q2  2012.    The  increase  in  cash  mining  costs  was  due  to  the following: (i) an increase in labour costs for both the Company’s employees as well as those of its mining contractors of approximately $3.80 per tonne, (ii) an increase in mining administration and preparation costs of $2.00 per tonne and (ii) the impact of US dollar depreciation versus the Chinese RMB of approximately $1.00 per tonne.  Compared to the first quarter of Fiscal 2013, total and cash mining costs decreased by 9% and 4%, respectively.

For the six months ended September 30, 2012, the Company mined 386,829 tonnes of ore at the Ying Mining District, resulting in metal production of 2.5 million ounces of silver, 2,067 ounces of gold, 27.1 million pounds of lead and 6.4 million pounds of zinc, compared to 352,747 tonnes with metal production of 3.0 million ounces of silver, 1,703 ounces of gold, 37.1 million pounds of lead and 7.3 million pounds of zinc in the same prior year period.  Grades were 226 g/t for silver, 3.5% for lead, and 1.2% for zinc compared to 287 g/t for silver, 5.0% for lead and 1.4% for zinc, over the same period.

In Q2 2013, a total of 203,170 tonnes of ore were milled, an increase of 13% compared to 180,164 tonnes in Q2 2012.  The cash milling cost per tonne decreased to $12.12 from $13.48 in Q2 2012, attributable to the increased tonnage milled.  For the six months ended September 30, 2012, a total of 389,625 tonnes of ore were milled compared to 355,091 tonnes in the same prior year period. Over the same period, cash milling cost per tonne were $13.10 compared to $12.78.

Total  and  cash  costs  per  ounce  of  silver  in  Q2  2013  for  the  Ying  Mining  District  were  $1.05  and negative $0.74, compared to negative $2.74 and negative $4.55, respectively in Q2 2012.  Compared with first quarter Fiscal 2013, total and cash costs per ounce of silver decreased $1.44 and $0.90 respectively, due to lower overall production costs in Q2 2013.

For the six months ended September 30, 2012, total and cash costs per ounce of silver were $1.75 and negative $0.31 compared to negative $3.75 and negative $5.39, respectively, in the same prior year period.

The operational results for the past five quarters at the Ying Mining District are summarized in the table below:

Quarterly opertional results ‐ Ying Mining District Q2 2013 Q1 2013 Q4 2012 Q3 2012 Q2 2012 30‐Sep‐12 30‐Jun‐12 31‐Mar‐12 31‐Dec‐11 30‐Sep‐11
Ore Mined (tonne) Direct Smelting Ore (tonne) Stockpiled Ore (tonne)2,250 2,761 4,151 2,579 178,768 132,986 169,926 179,963
2,442
203,369
205,811181,018 135,747 174,077 182,542
Run of Mine Ore (tonne) Direct Smelting Ore (tonne) Ore Milled (tonne)2,250 2,761 4,151 2,579 184,205 133,848 171,243 177,586
2,442
200,728
203,170186,455 136,609 175,394 180,165
Metal Sales Silver (in thousands of ounces) Gold (in thousands of ounces) Lead (in thousands of pounds) Zinc (in thousands of pounds)1,223 1,082 1,542 1,396 0.8 1.0 1 0.9 13,713 14,668 20,551 16,520 2,974 2,637 3,525 3,236
1,277
1.3
13,403
3,412
Head Grade of Run of Mine Ore Silver (gram/tonne) Lead (%) Zinc (%)227 275 296 271 3.6 5.2 5.5 4.6 1.1 1.4 1.4 1.2
224
3.4
1.2
Recovery Rate of Run of Mine Ore Silver (%) Lead (%) Zinc (%)91.7 93.2 93.3 92.9 94 96.4 96.4 95.5 63 64.6 67.7 70.8
92.7
94.3
69.6
Cash Mining Cost ($ per tonne) Total Mining Costs($ per tonne) Cash Milling Cost ($ per tonne) Total Milling Cost ($ per tonne)53.27 62.56 12.12 13.8455.47 57.62 55.92 45.74 69.02 73.52 70.23 57.23 14.17 16.84 14.76 13.48 16.05 19.4 16.42 15.03
Cash Cost per Ounce of Silver ($) Total Production Cost per Ounce of Silver ($)(0.74) 1.050.16 (4.22) (4.64) (4.55) 2.49 (1.84) (2.67) (2.74)

2. BYP Mine, Hunan Province, China

In Q2 2013, the Company mined 26,641 tonnes of ore at the BYP mine with gold head grade of 3.3 g/t compared to 24,754 tonnes with gold head grade of 3.3 g/t in Q2 2012.  During the quarter, 1,212 ounces of gold was sold at a cash cost per ounce of gold of $361 compared to 1,613 ounces of gold sold at cash cost per ounce of gold of $276 in the same prior year period.

DEVELOPMENT AND EXPLORATION  

1. Ying Mining District, Henan Province, China

SGX (Ying) Mine

As at the end of Q2 2013, the Company had completed a total of 1,407 metres (“m”) of development work for a 5,200m ramp at the SGX mine, making construction of the ramp now 27% complete.  The ramp is designed to follow the main S7‐1 vein from the 450m elevation to the 150m elevation and then bottom at the zero metre elevation, where it will be connected to three existing vertical blind shafts.  Silvercorp expects to complete construction of the ramp in calendar 2015 but as construction progresses the ramp is expected to increase production capacity at the SGX mine with effect from the second quarter of Fiscal 2014.

In Q2 2013, the Company also developed 7,300m of horizontal tunnels and completed 15,000m of underground drilling at the SGX mine.

To support the ongoing expansion work at SGX, the Company has also commenced construction of a new 5,000m2 facility which will include offices and dormitories.

LM Mine and LM Mine West  

During the second quarter of Fiscal 2013 tunnel development on five mining levels at the LM mine continued and two new stopes along the 750m elevation commenced production which contributed to the increase in ore mined during the quarter.

At LM Mine West (“LM West”), the construction of Shaft 969 was completed during the quarter and preparation for tunnel development work is underway.  It is expected that Shaft 969 will become operational during the  third quarter of  Fiscal  2013 and will  start to produce ore during  the  third quarter of Fiscal 2014.

In addition, the Company completed a total of 1,084m of the development work of a 4,800m access ramp at LM West in Q2 2013.  The access ramp has already been connected to existing tunnels at LM West and this has vastly improved the tunnels’ ventilation and hauling capacity.  It is expected that this new access ramp will contribute to an increase in production by first quarter of Fiscal 2014.

Once Shaft 969, the access ramp and all the mining levels are completed down to the 500m elevation at LM West in Fiscal 2015, the combined production capacity of the two mines is expected to be 300,000 tonnes of ore per year.  In order to support the expected growth in operations at the LM Mine  and  LM  West,  the  Company  has  commenced  construction  of  a  3,000m2  facility  which  will include offices and a dormitory.

In Q2 2013, the Company also developed 5,000m of decline and horizontal tunnels and completed 12,500m of underground drilling at the LM Mine and LM West.

TLP Mine 

In Q2 2013, the Company continued to ramp up production at the TLP mine while developing over 6,400m  of  horizontal  tunnels  for  mining  and  underground  drilling  purpose.    The  Company  also completed 9,700m of underground drilling during the quarter.

HPG Mine 

In Q2 2013, the Company began construction of a 400m shaft in the HPG mine to support a future increase in ore production.   The Company also developed over 3,200m of decline and horizontal tunnels and completed 4,300m of underground drilling.

Adoption of New Mining Method 

At the Ying Mining District, the mining method has been comprised of 40% short‐hole shrinkage and 60% resuing, with cut‐off grades (before mining dilution) of 300 g/t silver‐equivalent (“AgEq”) at the SGX (Ying) mine,  and  150  g/t  AgEq  at the HPG,  LM  and  TLP mines.   The  resuing method is  more selective and is used to mine narrow veins under 0.7m, while the shrinkage method is used to mine wider stopes ranging from 0.8m to 3m.

With effect from October 2012, and following a reduction in the cut‐off grades for the Ying Mining District  Resource  as  per  the  2012  NI  43‐101  Technical  Report  prepared  by  AMC  Consultants,  the Company has started to gradually increase the use of the shrinkage method for mining.  As such the mining width has been increased and the cut‐off grades have been lowered to 150 g/t AgEq at the SGX (Ying) mine, and 110 g/t AgEq at HPG, LM and TLP mines.

The implementation of the new mining method will take place over the next 12 months and the Company expects to gradually increase the use of the shrinkage method at the Ying Mining District from 40% to 80% and reduce the use of the resuing method from 60% to 20%.

The expected benefits of the change in mining method are:

‐ Lower cash mining cost per tonne ‐ the short‐hole shrinkage method have a cash mining cost of $32 per tonne compared to $75 per tonne for the resuing method.

‐ Less  development  work  required  ‐  due  to  the  increase  in  mining  stope  width,  less  mine tunnel development work will be required to produce the same amount of ore.

‐ Higher tonnage produced ‐ as less tunnelling is required, this is expected to have a positive effect on hauling capacity and therefore allow for an increase in production.

‐ Increase in operational efficiency ‐ reducing the number of stopes required to produce the same amount of ore will result in a more focused and efficient mining operation.

It should be noted that the impact to overall head grades for the Ying Mining District following the adoption of the new mining method is currently unknown.

2. GC Project, Guangdong Province, China

The Company continued to progress the development of the GC project.

As of September 30, 2012, 376m of the construction of the 618m main shaft was complete.  The shaft is expected to reach its designed elevation of ‐370m in the first quarter of Fiscal 2015. The main access ramp is now 65% complete with a cumulative total of 1,447m of the 2,210m ramp having been developed as at the end of the quarter. In addition to the main access ramp, the Company has also been developing a 4,600m exploration ramp which will provide access to all known veins within a  horizontal  distance  of  250m.    As  of  September  30,  2012,  804m  of  the  exploration  ramp  was completed.

As at the end of this quarter, all major equipment for the 1,600 t/d floatation mill, including the jaw crusher, cone crusher, ball mills and flotation cells, has been installed and is currently undergoing testing  in  anticipation of the commencement of production.   Remaining work includes  secondary concrete casting and installation of auxiliary power equipment.  It is expected that the mill will be operational in third quarter of Fiscal 2013.

The construction of a 5.8 kilometre long, 110KV power line and a substation began in late July 2012. As of Q2 2013, the foundation work for 8 of the 13 power lines along with the substation’s building framework has been completed.  The power line and substation are expected to be operational by the end of third quarter of Fiscal 2013.

As  of  Q2  2013,  the  Company  successfully  completed  and  passed  a  health  and  safety  review  of engineering designs for the tailings storage facilities as reported in the previous quarter.  Accordingly, the  construction  of  the  dry  stacking  tailings  storage  facility  has  resumed  and  is  expected  to  be complete by the end of the third quarter of Fiscal 2013.

The construction of a lab, administrative offices and dormitory facilities were completed as of Q2 2013.

Assuming  a positive final  approval  to  commence operations  at  GC  from the local  authorities,  the Company  continues  to  expect  to  be  able  to  commence  initial  production  at  GC  in  early  2013, processing ore stockpiles and maintains its production guidance of 170,000 ounces of silver and 2.7 million pounds of lead and zinc for Fiscal 2013.

In Q2 2013, the Company completed 7,500m of diamond drilling using five underground drill rigs currently on site at the GC project.  During the quarter, exploration, mine development, mill and facility construction expenditures at the GC project were $7.3 million, with development expenditure of the project now totalling $40 million as of the end this quarter.

3. BYP Mine, Hunan Province, China

In  Q2  2013,  the  Company  released  an  update  to  the  BYP  mine  NI  43‐101  technical  report,  with indicated resources of 292,000 ounces of gold, 187 million pounds of lead and 408 million pounds of zinc.

As of Q2 2013, the Company had completed the excavation work for a 265m deep shaft that will facilitate the  mining of  the #3  gold mineralization  body  and the #5  zinc  and lead ore  body.   The installation  of  shaft  equipment  and  construction  of  the  head  frame  is  currently  underway.    In addition, the construction of a 1,500 t/d tailing‐backfill facility is well underway and is expected to be completed in fourth quarter Fiscal 2013.

4. X mines (“XBG and XHP projects”), Henan Province, China

At  the  XHP  and  XBG  projects,  construction  of  a  286m  incline  shaft  and  a  225m  incline  shaft, respectively, are underway with completion expected in the first quarter of Fiscal 2014.  During the quarter, approximately 1,400m of tunneling and 6,300m of diamond drilling were also completed at the X mines.

The X mines will continue to focus on the executions of an exploration program that will include surface  and  underground  mapping  and  systematic  sampling,  surface  and  underground  diamond drilling, with the intention of defining a NI 43‐101 compliant mineral resource.  Exploration and mine development  at  the  X  mines  will  be  partially  supported  from  cash  flows  generated  from  limited tunneling ore and existing ore stockpiles.

5. RZY Project, Qinghai Province, China

The RZY exploration permit is currently owned by the Qinghai Geological Survey Bureau, the non‐ controlling interest holder of Qinghai Found Mining Co. (“Qinghai Found”), an 82% owned‐subsidiary of the Company.  Pursuant to the joint‐exploration agreement, Qinghai Found currently owns 67% of the mineral interest in the RZY project, and can acquire up to 82% interest by providing exploration funding of $4.8 million.  Upon the completion of exploration funding, the exploration permit will be transferred to Qinghai Found.  The Company expects to fund up to $32 million in exploration and capital expenditures for the RZY project.

In Q2 2013, the Company commenced its first diamond drilling program at the RZY project with five diamond drill holes and 833m of drilling completed.

6. Silvertip Project, British Columbia, Canada

The Company is in the process of preparing a Small Mine Permit application to be submitted to the British Columbia Ministry of Energy and Mines.  A Small Mine Permit will allow a 75,000 tonnes per year mining operation.

Myles Gao, P.Geo., President of Silvercorp, is a Qualified Person for Silvercorp under NI 43‐101 and has reviewed and given consent to the technical information contained in this News Release.

CONFERENCE CALL AND WEBCAST INFORMATION 

An investor conference call will be held on Wednesday, November 14, 2012 at 8 a.m. Pacific Time (11 a.m. Eastern Time) to discuss the results. Participants may join the call by dialing 1‐877‐240‐9772 toll‐free or 1‐416‐340‐8527 for calls outside Canada and the U.S.

A live webcast of the conference call, together with supporting presentation slides will be available on the home page of the Company's website, www.silvercorp.ca.  The webcast will be archived and available on the Company’s website for up to one year.

An audio replay will be available until November 21, 2012 by calling 1‐800‐408‐3053 toll free or 1‐ 905‐694‐9451 for calls outside Canada and the U.S. and entering pass code 5953693.

About Silvercorp  

Silvercorp  is  a  low‐cost  silver‐producing  Canadian  mining  company  with  multiple  mines  in  China which has paid a cash dividend since 2007.  The Company is currently developing the GC project in southern China which it expects will become its next operating mine in early 2013.  The Company’s vision  is  to  deliver  shareholder  value  by  focusing  on  the  acquisition  of  small‐scale  projects  with resource potential and self‐fund the growth of those assets.  For more information, please visit our website at www.silvercorp.ca.

For further information 

Jonathan Hackshaw Director, Investor Relations

Phone: (604) 669‐9397 Toll Free 1(888) 224‐1881 Email: [email protected] Website: www.silvercorp.ca

CAUTIONARY DISCLAIMER ‐ FORWARD LOOKING STATEMENTS 

Certain of the statements and information in this press release constitute “forward‐looking statements” within the meaning  of  the  United  States  Private  Securities  Litigation  Reform  Act  of  1995  and  “forward‐looking  information” within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future  events  or  performance  (often,  but  not  always,  using  words  or  phrases  such  as  “expects”,  “is  expected”, “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”,  “strategies”,  “targets”,  “goals”, “forecasts”,  “objectives”,  “budgets”,  “schedules”,  “potential”  or  variations  thereof  or  stating  that  certain  actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward‐looking statements or information.  Forward‐looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company’s material properties; the sufficiency of the Company’s capital to finance the Company’s operations; estimates of the Company’s revenues and capital expenditures; estimated production from the Company’s mines in the Ying Mining Camp; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company’s operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company’s properties.

Forward‐looking statements or information are subject to a variety of known and unknown risks, uncertainties and other  factors  that  could  cause  actual  events  or  results  to  differ  from  those  reflected  in  the  forward‐looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources,  reserves and mineralization  and precious and base metal  recovery;  interpretations  and  assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licences; title to properties; First Nations title claims and rights; property interests;  joint venture partners;  acquisition  of  commercially  mineable  mineral  rights;  financing;  recent  market  events  and  conditions; economic  factors  affecting  the  Company;  timing,  estimated  amount,  capital  and  operating  expenditures  and economic  returns  of  future  production;  integration  of  future  acquisitions  into  the  Company’s  existing  operations; competition;  operations and political conditions; regulatory environment in China and Canada;  environmental risks; foreign  exchange  rate  fluctuations;  insurance;  risks  and  hazards  of  mining  operations;  key  personnel;  conflicts  of interest;  dependence  on  management;  internal  control  over  financial  reporting  as  per  the  requirements  of  the Sarbanes‐Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward‐looking  statements  or information.  Forward‐looking  statements  or  information  are  statements  about  the  future  and  are  inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward‐looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year ended March 31, 2012 under the heading “Risk Factors”.  Although the Company has attempted to identify important factors that  could  cause  actual  results  to  differ  materially,  there  may  be  other  factors  that  cause  results  not  to  be  as anticipated,  estimated,  described  or  intended.   Accordingly,  readers  should  not  place  undue  reliance  on forward‐ looking statements or information.

The Company’s forward‐looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward‐looking statements and information if circumstances or  management’s  assumptions,  beliefs,  expectations  or  opinions  should  change,  or  changes  in  any  other  events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward‐looking statements and information.

Unaudited Consolidated Balance Sheets 

September 30, 2012 March 31, 2012

ASSETS Current Assets

Cash and cash equivalents $                              89,334 $ 109,960

Short‐term investments47,23644,551
Accounts receivable3,19712,904
Inventories7,6657,006
Due from related parties369679
Prepaids and deposits5,6405,210

153,441 180,310

Non‐current Assets

Long term prepaids and deposits5,7866,015
Investment in an associate16,53415,872
Other investments42,30045,757
Plant and equipment80,99268,788
Mineral rights and properties288,123258,521
Deferred income tax assets‐171

TOTAL ASSETS $                           

587,176 $ 575,434

LIABILITIES AND EQUITY Current Liabilities

Accounts payable and accrued liabilities  $                              26,738 $ 23,590

Deposits received7,2557,268
Dividends payable4,3394,271
Income tax payable3,1415,082

41,473 40,211

Non‐current Liabilities

Deferred income tax liabilities22,50919,991
Environmental rehabilitation4,4674,400
Total Liabilities68,44964,602

Equity

Share capital232,843232,678
Contributed surplus7,1085,552
Reserves24,71724,717
Accumulated other comprehensive income24,19825,285
Retained earnings152,715145,580
Total equity attributable to the equity holders of the Company441,581433,812
Non‐controlling interests77,14677,020
Total Equity518,727510,832

TOTAL LIABILITIES AND EQUITY $                           

587,176 $ 575,434

Unaudited Consolidated Statements of Income 

(Expressed in thousands of U.S. dollars, except for per share figures)

2012201120122011
Sales$45,209 $62,055$89,758 $131,774
Cost of sales16,44614,43535,44028,494
Gross profit28,76347,62054,318103,280
General and administrative6,1917,45613,03712,401
General exploration and property investigation8871,2091,8533,001
Other taxes8421,0391,6482,177
Foreign exchange loss (gain)1,142(1,284)365(760)
Loss on disposal of plant and equipment517125253
Income from operations19,69639,02937,39086,208
Share of gain (loss) in an associate(182)116(189)92
Write down of inventories(348)‐(348)‐
Gain (loss) on investments693(670)(593)(1,829)
Other income93126168301
Income before finance items and income taxes19,95238,60136,42884,772
Finance income8511,1101,8421,780
Finance costs(23)(23)(45)(46)
Income before income taxes20,78039,68838,22586,506
Income tax expense7,27713,78615,20426,360
Net income$13,503 $25,902$23,021 $60,146

Attributable to:

Equity holders of the Company $                      9,500 $              18,471 $               15,614 $               44,113 Non‐controlling interests 4,003 7,431 7,407 16,033 $                  13,503 $              25,902 $               23,021 $               60,146

Earnings per share attributable to the equity holders of the Company

Basic earnings per share $                       0.06 $ 0.11 $                    0.09 $                    0.25 Diluted earnings per share $                       0.06 $ 0.11 $                    0.09 $                    0.25 Weighted Average Number of Shares Outstanding ‐ Basic 170,719,933 173,664,959 170,706,702 174,343,192 Weighted Average Number of Shares Outstanding ‐ Diluted 171,062,715 174,282,790 171,072,838 175,122,557

Unaudited Consolidated Statements of Cash Flow

2012 2011 2012 2011

Cash provided by Operating activities

Net income $                13,503 $                25,902 $              23,021 $              60,146 Add (deduct) items not affecting cash:

Accretion of environmental rehabilitation23234546
Depreciation, amortization and depletion3,1143,2947,1905,881
Share of loss (gain) in an associate182(116)189(92)
Write down of inventories348‐348‐
Deferred income tax expense1294,3793,1135,507
Loss (gain) on investments(693)6705931,829
Loss on disposal of plant and equipment517125253
Stock‐based compensation8728411,6081,619
Changes in non‐cash operating working capital6,434157,037(6,075)
Net cash provided by operating activities23,91735,17943,16969,114

Investing activities

Mineral rights and properties Capital expenditures (14,097) (7,326) (26,413) (13,701) Plant and equipment Additions (5,328) (6,018) (13,485) (10,150) Investments

Acquisition(80)‐(595)(1,020)
Net purchases of short‐term investments12,45712,813(2,355)7,820
Acquisition of Zhongxing/Chuanxin (net of cash acquired, $20)‐(3,403)‐(3,403)
Prepayments to acquire mineral property, plant and equipment(2,629)(19,989)(4,100)(21,095)
Net cash used in investing activities(9,677)(23,923)(46,948)(41,549)

Financing activities

Net repayment from (advance to) related parties 253 (11,113) 310 (12,290) Non‐controlling interests

Contribution‐578‐5,158
Distribution(7,388)‐(7,388)‐
Cash dividends distributed(4,220)(3,705)(8,525)(7,305)

Share capital

Proceeds from issuance of common shares1961113951
Normal course issuer bid‐(35,380)‐(35,380)
Net cash used in financing activities(11,336)(49,559)(15,490)(48,866)
Effect of exchange rate changes on cash and cash equivalents2,775(3,330)(1,357)(1,880)
Increase (decrease) in cash and cash equivalents5,679(41,633)(20,626)(23,181)
Cash and cash equivalents, beginning of the period83,655165,676109,960147,224

Cash and cash equivalents, end of the period $                89,334 $ 124,043 $              89,334 $            124,043