Silvercorp Reports Financial and Operating Results for the First Quarter of Fiscal Year 2014

Production Results Financials

NEWS RELEASE 

Trading Symbol:  TSX: SVM NYSE: SVM 

SILVERCORP REPORTS FINANCIAL AND OPERATING RESULTS FOR THE FIRST QUARTER OF FISCAL YEAR 2014 

VANCOUVER,  British  Columbia  –  August  8,  2013  –  Silvercorp  Metals  Inc.  (“Silvercorp”  or  the “Company”) (TSX: SVM) (NYSE: SVM) reported its financial and operating results for the first quarter ended June 30, 2013 (“Q1 Fiscal 2014”).

FIRST QUARTER HIGHLIGHTS 

  • Silver production of 1.4 million ounces and gold production of 3,777 ounces;
  • Lead production of 13.5 million pounds and zinc production of 3.7 million pounds;
  • Sales of $39.8 million;
  • Gross margin of 44% despite significant decline in precious metal prices;
  • Net income of $4.6 million or $0.03 per share;
  • Strong cash flow from operations of $17.6 million, or $0.10 per share;
  • Cash cost of $3.23 per ounce of silver at the Ying Mining District;
  • GC  Mine  continued  to  undergo  trial  mining  and  processing  and  is  progressing  towards commercial production; and
  • Return  of  value  to  our  shareholders  by  the  $4.2  million  quarterly  dividend  payment  of CAD$0.025 per share.

FINANCIALS 

In Q1  Fiscal  2014, net income attributable  to  equity  holders of the  Company  was $4.6 million or $0.03 per  share compared to net income  of $6.1  million or $0.04  per share  in the three  months ended June 30, 2012 (“Q1 Fiscal 2013”).

Compared  to  the  same  prior  year  quarter,  the  decrease  in  net  income  was  mainly  due  to  (i) significantly lower silver price; net realized silver price was $17.66 per ounce this quarter, which was $5.31 or 23% lower compared to $22.97 per ounce in Q1 Fiscal 2013; (ii) lower base metal prices; net realized lead and zinc prices were 7% and 5% lower in this quarter as compared to the same prior year quarter; and (iii) higher overall production costs as more ore were processed.

In Q1 Fiscal 2014, the Company realized sales of $39.8 million compared to $44.5 million in Q1 Fiscal 2013.

Cost of sales in Q1 Fiscal 2014 was $22.5 million compared to $19.0 million in Q1 Fiscal 2013 and included cash costs of $18.9 million compared to $15.3 million in Q4 Fiscal 2012.  The increase of cost of sales was due to more ore being mined and processed.

The gross profit margin in Q1 Fiscal 2014 was 44%, compared to 57% in Q1 Fiscal 2013.

Cash flow from operations in Q1 Fiscal 2014 was $17.6 million or $0.10 per share, compared to $19.3 million, or $0.11 per share, in Q1 Fiscal 2013.

OPERATIONS 

In Q1 Fiscal 2014, on a consolidated basis, the Company produced 1.4 million ounces of silver, 3,777 ounces of gold, 13.5 million pounds of lead, and 3.7 million pounds of zinc compared to 1.2 million ounces of silver and 2,653 ounces of gold, 13.7 million pounds of lead, and 3.0 million pounds of zinc in Q1 Fiscal 2013.

1. Ying Mining District, Henan Province, China 

In Q1 Fiscal 2014, the Company mined 233,257 tonnes of ore at the Ying Mining District compared to 181,018  tonnes  in  Q1  Fiscal  2013.    Metal  production  totalled  1.4  million  ounces  of  silver,  1,282 ounces of gold, 13.1 million pounds of lead and 2.9 million pounds of zinc, compared to 1.2 million ounces of silver, 800 ounces of gold, 13.7 million pounds of lead, and 3.0 million pounds of zinc in Q1 Fiscal 2013.

Head grades were 200 grams per tonne (“g/t”) for silver, 2.7% for lead and 0.8% for zinc, compared to 227 g/t for silver, 3.6% for lead and 1.1% for zinc in the same quarter last year.

In  Q1  Fiscal  2014,  total  and  cash  mining  costs  per  tonne  were  $65.09  and  $54.95,  respectively, compared to $69.02 and $55.47 in Q1 Fiscal 2013, respectively.

In Q1 Fiscal 2014, a total of 236,173 tonnes of ore was milled compared to 186,455 tonnes in Q1 Fiscal 2013.  The cash milling cost per tonne was $12.06 in Q1 Fiscal 2014 compared to $14.17 in Q1 Fiscal 2013.

Total and cash costs per ounce of silver in Q1 Fiscal 2014 for the Ying Mining District were $5.33 and $3.23 respectively, compared to $2.49 and $0.16, in Q1 Fiscal 2013, respectively.

The  consolidated  operational  results  for  the  past  five  quarters  at  the  Ying  Mining  District  are summarized in the table below:

Quarterly opertional results ‐ Ying Mining District Q1 2014 Q4 2013 Q3 2013 Q2 2013 Q1 2013 30‐Jun‐13 31‐Mar‐13 31‐Dec‐12 30‐Sep‐12 30‐Jun‐12
Ore Mined (tonne) Direct Smelting Ore (tonne) Stockpiled Ore (tonne)1,309 2,334 2,442 2,250 152,014 234,360 203,369 178,768
963
232,294
233,257153,323 236,694 205,811 181,018
Run of Mine Ore (tonne) Direct Smelting Ore (tonne) Ore Milled (tonne)1,309 2,334 2,442 2,250 156,836 224,430 200,728 184,205
963
235,210
236,173158,145 226,764 203,170 186,455
Metal Sales Silver (in thousands of ounces) Gold (in thousands of ounces) Lead (in thousands of pounds) Zinc (in thousands of pounds)933 1,508 1,277 1,223 0.8 1.3 1.3 0.8 9,462 15,642 13,403 13,713 1,554 3,231 3,412 2,974
1,364
1.3
13,063
2,926
Head Grade of Run of Mine Ore Silver (gram/tonne) Lead (%) Zinc (%)205 222 224 227 2.9 3.2 3.4 3.6 0.7 1.0 1.2 1.1
200
2.7
0.8
Recovery Rate of Run of Mine Ore Silver (%) Lead (%) Zinc (%)93.5 93.3 92.7 91.7 94.5 95.1 94.3 94.0 60.3 70.4 69.6 63.0
92.3
94.6
68.4
Cash Mining Cost ($ per tonne) Total Mining Costs($ per tonne) Cash Milling Cost ($ per tonne) Total Milling Cost ($ per tonne)54.95 65.09 12.06 13.6261.67 54.92 53.27 55.47 72.56 64.47 62.56 69.02 16.05 12.61 12.12 14.17 18.61 14.20 13.84 16.05
Cash Cost per Ounce of Silver ($) Total Production Cost per Ounce of Silver ($)3.23 5.333.65 (0.17) (0.74) 0.16 5.82 1.52 1.05 2.49

2. BYP Mine, Hunan Province, China 

In Q1 Fiscal 2014, the Company mined 29,075 tonnes of ore at the BYP mine with a gold head grade of 2.8 g/t compared to 27,560 tonnes and a gold head grade of 2.2 g/t in Q1 Fiscal 2013.  During the quarter,  2,338  ounces  of  gold  were  produced  and  sold  at  a  cash  cost  per  ounce  of  gold  of  $448 compared to 1,724 ounces of gold produced and sold at cash cost per ounce of gold of $577 in the same period last year.  In Q1 Fiscal 2014, total and cash mining costs per tonne were $51.17 and $21.04 respectively compared to $47.74 and $20.98 in Q1 Fiscal 2013, respectively.

DEVELOPMENT AND EXPLORATION  

1. Ying Mining District, Henan Province, China 

As at the end of Q1 Fiscal 2014, the Company completed approximately 2,250 metres (“m”) of the 5,200m ramp at the SGX mine and approximately 2,000m of the development work for the 4,800m access ramp at the LM Mine West.  During the quarter, the Company also completed approximately 18,000m  of  horizontal  tunnels,  raises  and  declines.    In  addition,  construction  for  20,000  square metres  of  surface  facilities,  consisting  of  offices  and  dormitories  within  the  Ying  Mining  District, continued.

In Q1 Fiscal 2014, exploration and development expenditures for the Ying Mining District were $9.7 million compared to $9.6 million in Q1 Fiscal 2013.

In light of the significant decline in precious metal prices, the Company is reviewing its short term operating  plans  to  better  adapt  to  the  new  price  environment.    As  a  result,  in  July  2013,  the Company has suspended mining operations at the Portal PD820, PD850 and PD730 within the Ying Mining  District  as  production  from  these  locations  was  not  economical.    The  impact  of  the suspension will reduce ore production by 63,000 tonnes for the remainder of the fiscal year, and is expected  to  reduce  approximately  400,000  ounces  from  expected  silver  production  in  the  Ying Mining District.  Accordingly, the Company has revised its fiscal year 2014 production guidance for the  Ying  Mining  District  to  837,000  tonnes  of  ore,  producing  5.5  million  ounces  of  silver,  4,700 ounces of gold and 74.7 million pounds of lead and zinc.

As part of the capital cost savings review, the Company has also identified opportunities to reduce capital expenditures in the current fiscal year at the Ying Ming District.  These measures are expected to reduce fiscal year 2014 budgeted capital expenditures by $8 million to $40 million.

2. GC Project, Guangdong Province, China 

The Company has substantially completed the construction of GC mine and is progressing well with the  preparations  for  safety  and  environmental  regulatory  inspections,  prior  to  commercial production.  The majority of the required surface environmental protection facilities together with water and soil conservation engineering work is completed and has undergone test operation.  The key component required for passing the safety inspection, in accordance to safety requirements in the Mine  Design, is  to  complete a water sump and pumping station  at the  ‐50m  elevation.    This component is expected to be completed by the end of September 2013, and as such the Company expects to pass the inspection and obtain its Safety Production Permit in the third quarter of fiscal year 2014.

During Q1 Fiscal 2014, approximately 3,100m of tunnels, including 425m of development tunnels, 2,225m of exploration tunnels and 450m of mining preparation tunnels, were completed.

The main access ramp totalling 2,210m in length was completed and has accessed the V2 vein at the +40m,  +20m,  and  0m  elevations.    The  exploration  ramp  is  completed  to  a  length  of  1,800m, representing  39%  of  the  total  designed  length  of  4,600m.    To  date,  the  exploration  ramp  has accessed the V9, V9‐1, V9W‐1, and V9W‐2 veins at the 100m, 50m, 0m and ‐50 m elevations through cross‐cuts  and  has  developed  transportation  drifts  and  mining  preparation  drifts.    Once  the exploration ramp is completed, access to all known veins within a horizontal distance of 250m is possible.  The exploration ramp has also been connected to the main ramp at the 100m and 0m elevations,  as  well  as  the  main  shaft  at  the  +100m,  +50m,  0m  and  ‐50m  elevations  to  provide ventilation and a safety exit.  During the course of fiscal year 2014, the Company will use the main ramp and the exploration ramp access points for mining.

As  at  the  end  of  Q1  Fiscal  2014,  the  construction  of  the  628m  main  shaft  was  substantially completed down to its designed depth at elevation ‐370m.  As part of cost savings review for fiscal year 2014, and to coordinate with the planned production schedule, the Company has decided to defer the installation of the hoist system to fiscal year 2015, reducing capital expenditures in the year by $3 million.

In Q1 Fiscal 2014, the Company continued equipment testing and trial processing to fine tune the mill circuit to achieve the desired metallurgical recovery rates for silver, lead, zinc, tin, and sulphur in concentrates.  Testing will be on‐going for the next several months.

In  Q1  Fiscal  2014,  $6.2  million  (Q1  Fiscal  2013  ‐  $3.1  million)  of  exploration  and  development expenditures were incurred at the GC mine.  From the capital cost review for fiscal year 2014, the Company has reduced the budgeted capital expenditures by approximately $8 million to $21 million at the GC mine.

3. BYP Mine, Hunan Province, China 

In  Q1  Fiscal  2014,  the  Company  completed  the  installation  of  shaft  equipment  for  the  newly completed 265m shaft.  The construction of the head frame is expected to commence in the next quarter.  Once completed, this shaft will facilitate mining of the #3 gold mineralization body and the #5 zinc and lead ore body.  In addition, the construction of a 1,500 t/d tailings‐backfill facility has been substantially completed with expected trial runs to commence in the next quarter.

In  Q1  Fiscal  2014,  exploration  and  development  expenditures  at  the  BYP  mine  were  $1.6  million compared to $1.3 million in Q1 Fiscal 2013.

4. X Mines, Henan Province, China 

The X Mines consist of two mining projects: the XBG project and XHP project.

In Q1 Fiscal 2014, the Company entered into a share transfer agreement (“the Agreement”) with an arm’s  length  private  Chinese  company.    Pursuant  to  the  Agreement,  the  Company’s  subsidiary, Henan  Found  Mining  Co.  Ltd.,  will  sell  its  90%  equity  interest  in  Zhongxing  Mining  Co.  Ltd.  (XBG project) for $13.8 million (RMB 84 million).  As of the date of this news release, an initial deposit of $4.9 million (RMB 30 million) has been received.  The transaction is expected to be completed within 12 months.

As at the end of this quarter, the Company has also suspended activities at the XHP project as part of its cost saving measures.

Myles  Gao,  P.Geo.,  President,  is  the  Qualified  Person  for  Silvercorp  under  NI  43‐101  and  has reviewed and given consent to the technical information contained in this News Release.

This earnings release should be read in conjunction with the Company's Management Discussion &
Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which
have been posted on SEDAR atand are also available on the Company's website
atwww.silvercorp.ca.

About Silvercorp  

Silvercorp  is  a  low‐cost  silver‐producing  Canadian  mining  company  with  multiple  mines  in  China which has paid a cash dividend since 2007.  The Company is currently developing the GC project in southern China which it expects will become its next operating mine in 2013.  The Company’s vision is  to  deliver  shareholder  value  by  focusing  on  the  acquisition  of  under  developed  projects  with resource potential and the ability to grow organically.  For more information, please visit our website at www.silvercorp.ca.

For further information

Silvercorp Metals Inc.

Investor Relations Phone: (604) 669‐9397 Toll Free: 1 (888) 224‐1881 Email: [email protected] Website: www.silvercorp.ca

CAUTIONARY DISCLAIMER ‐ FORWARD LOOKING STATEMENTS 

Certain of the statements and information in this press release constitute “forward‐looking statements” within the meaning  of  the  United  States  Private  Securities  Litigation  Reform  Act  of  1995  and  “forward‐looking  information” within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future  events  or  performance  (often,  but  not  always,  using  words  or  phrases  such  as  “expects”,  “is  expected”, “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”,  “strategies”,  “targets”,  “goals”, “forecasts”,  “objectives”,  “budgets”,  “schedules”,  “potential”  or  variations  thereof  or  stating  that  certain  actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward‐looking statements or information.  Forward‐looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company’s material properties; the sufficiency of the Company’s capital to finance the Company’s operations; estimates of the Company’s revenues and capital expenditures; estimated production from the Company’s mines in the Ying Mining District; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company’s operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company’s properties.

Forward‐looking statements or information are subject to a variety of known and unknown risks, uncertainties and other  factors  that  could  cause  actual  events  or  results  to  differ  from  those  reflected  in  the  forward‐looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources,  reserves and mineralization  and precious and base metal  recovery;  interpretations  and  assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licences; title to properties; First Nations title claims and rights; property interests;  joint venture partners;  acquisition  of  commercially  mineable  mineral  rights;  financing;  recent  market  events  and  conditions; economic  factors  affecting  the  Company;  timing,  estimated  amount,  capital  and  operating  expenditures  and economic  returns  of  future  production;  integration  of  future  acquisitions  into  the  Company’s  existing  operations; competition;  operations and political conditions; regulatory environment in China and Canada;  environmental risks; foreign  exchange  rate  fluctuations;  insurance;  risks  and  hazards  of  mining  operations;  key  personnel;  conflicts  of interest;  dependence  on  management;  internal  control  over  financial  reporting  as  per  the  requirements  of  the Sarbanes‐Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward‐looking  statements  or information.  Forward‐looking  statements  or  information  are  statements  about  the  future  and  are  inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward‐looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year ended March 31, 2013 under the heading “Risk Factors”.  Although the Company has attempted to identify important factors that  could  cause  actual  results  to  differ  materially,  there  may  be  other  factors  that  cause  results  not  to  be  as anticipated,  estimated,  described  or  intended.   Accordingly,  readers  should  not  place  undue  reliance  on forward‐ looking statements or information.

The Company’s forward‐looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward‐looking statements and information if circumstances or  management’s  assumptions,  beliefs,  expectations  or  opinions  should  change,  or  changes  in  any  other  events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward‐looking statements and information.

Condensed Consolidated Interim Balance Sheets 

June 30, 2013 March 31, 2013

ASSETS Current Assets

Cash and cash equivalents $                              91,581 $ 72,283

Short‐term investments20,41045,623
Trade and other receivables1,3821,442
Inventories6,2527,522
Due from related parties57123
Prepaids and deposits6,2495,118
Assets held for sale18,718‐

144,649 132,111

Non‐current Assets

Long‐term prepaids and deposits2,4331,877
Investment in an associate6,2896,523
Other investments11,90315,516
Plant and equipment103,694103,517
Mineral rights and properties321,504316,678

TOTAL ASSETS $                           

590,472 $ 576,222

LIABILITIES AND EQUITY Current Liabilities

Accounts payable and accrued liabilities  $                              40,930 $ 29,285

Deposits received11,16111,497
Dividends payable4,0624,204
Income tax payable891,349
Due to related parties‐1,207
Liabilities held for sale3,185‐

59,427 47,542

Non‐current Liabilities

Deferred income tax liabilities24,52324,603
Environmental rehabilitation5,9495,974
Total Liabilities89,89978,119

Equity

Share capital233,082233,082
Share option reserve9,0298,314
Reserves24,71724,717
Accumulated other comprehensive loss(2,969)(1,495)
Retained earnings156,206155,817
Total equity attributable to the equity holders of the Company420,065420,435
Non‐controlling interests80,50877,668
Total Equity500,573498,103

TOTAL LIABILITIES AND EQUITY $                           

590,472 $ 576,222

Condensed Consolidated Interim Statements of Income

(Unaudited) (Expressed in thousands of U.S. dollars, except for per share figures)

Three Months Ended June 30, 2013 2012

Sales $               39,835 $               44,549

Cost of sales22,48218,994
Gross profit17,35325,555
General and administrative7,5016,846
General exploration and property investigation1,048966
Other taxes595806
Foreign exchange gain(1,881)(777)
Loss on disposal of plant and equipment2820
Share of loss in associate147
Loss on investments5741,286
Other income(115)(75)
Income from operations9,58916,476
Finance income928991
Finance costs(33)(22)
Income before income taxes10,48417,445
Income tax expense4,0007,927

Net income $                  

6,484 $ 9,518

Attributable to:

Equity holders of the Company $                   4,562 $ 6,114 Non‐controlling interests 1,922 3,404

$                  

6,484 $ 9,518

Earnings per share attributable to the equity holders of the Company Basic earnings per share $                    

0.03 $ 0.04

Diluted earnings per share $                    

0.03 $ 0.04 Weighted Average Number of Shares Outstanding ‐ Basic 170,781,058 170,693,325 Weighted Average Number of Shares Outstanding ‐ Diluted 170,839,083 171,082,201

Condensed Consolidated Interim Statements of Cash Flow

Three Months Ended June 30, 2013 2012

Cash provided by Operating activities

Net income $                    6,484 $                    9,518 Add (deduct) items not affecting cash:

Unwinding of discount of environmental rehabilitation3322
Depreciation, amortization and depletion3,9324,076
Share of loss in associate147
Income tax expense4,0007,927
Loss on investments5741,286
Loss on disposal of plant and equipment2820
Share‐based compensation715736
Income tax paid(3,349)(8,515)
Changes in non‐cash operating working capital5,1944,175
Net cash provided by operating activities17,62519,252

Investing activities

Mineral rights and properties Capital expenditures (13,643) (12,316) Plant and equipment Additions (5,553) (9,628) Other investments

Acquisition‐(515)
Net redemptions (purchases) of short‐term investments24,991(14,812)
Deposit received for sale of subsidiaries1,630‐
Net cash provided by (used in) investing activities7,425(37,271)

Financing activities

Related parties

Payments made(1,410)(277)
Repayments received270334
Cash dividends distributed(4,160)(4,305)
Proceeds from issuance of common shares‐94
Net cash used in financing activities(5,300)(4,154)
Effect of exchange rate changes on cash and cash equivalents(400)(4,132)
Increase (decrease) in cash and cash equivalents19,350(26,305)
Cash and cash equivalents, beginning of the period72,283109,960
Cash and cash equivalents included in held for sale assets(52)‐

Cash and cash equivalents, end of the period $                  

91,581 $ 83,655

Three months ended June 30, 2013
Ying Mining District1X Mines2BYPTotal
Direct Smelting Ore(tonne)963‐‐963
Stockpiled Ore(tonne)232,294‐29,075261,369
233,257‐29,075262,332
Direct Smelting Ore(tonne)963‐‐963
Ore Milled(tonne)235,2106,929 *29,975272,114
236,1736,92929,975273,077
Mining cost per tonne of ore mined($)65.09‐51.1763.55
Cash mining cost per tonne of ore mined($)54.95‐21.0451.19
Non cash mining cost per tonne of ore mined($)10.14‐30.1312.35
Unit shipping costs($)3.98‐‐3.54
Milling cost per tonne of ore milled($)13.62‐14.0513.67
Cash milling cost per tonne of ore milled($)12.06‐13.0612.17
Non cash milling cost per tonne of ore milled($)1.56‐0.991.50
Silver($ per ounce)9.63‐‐9.96
Gold($ per ounce)546‐926616
Lead($ per pound)0.41‐‐0.42
Zinc($ per pound)0.34‐0.440.34
Total production cost per ounce of Silver($)5.33‐5.33
Total cash cost per ounce of Silver($)3.23‐3.23
Total production cost per ounce of Gold($)913913
Total cash cost per ounce of Gold($)448448
Silver (%)92.3‐92.3
Gold (%)92.592.5
Lead(%)94.6‐94.6
Zinc (%)68.4‐68.4
Silver (gram/tonne)200‐200
Gold (gram/tonne)2.8 2.8
Lead(%)2.7‐2.7
Zinc(%)0.8‐0.8
Silver(in thousands of ounces)1,36410 *‐1,374
Gold(in thousands of ounces)1.30.2 *2.33.8
Lead (in thousands of pounds)13,063405 *‐13,468
Zinc(in thousands of pounds)2,926484 *2823,692
Silver(in thousands of $)24,091‐‐24,091
Gold(in thousands of $)1,283‐2,6693,952
Lead(in thousands of $)9,833‐‐9,833
Zinc (in thousands of $)1,806‐1531,959
37,013‐2,82239,835
Silver($ per ounce)17.66‐17.66
Gold($ per ounce)1,001‐1,1411,092
Lead($ per pound)0.75‐0.75
Zinc($ per pound)0.62‐0.540.61
Three months ended June 30, 2012
Ying Mining District1X Mines2BYPTotal
Direct Smelting Ore(tonne)2,250‐‐2,250
Stockpiled Ore(tonne)178,7682,382 *27,560208,710
181,0182,38227,560210,960
Direct Smelting Ore(tonne)2,250‐‐2,250
Ore Milled(tonne)184,2053,611 *26,599214,415
186,4553,61126,599216,665
Mining cost per tonne of ore mined($)69.028.70 *47.7465.55
Cash mining cost per tonne of ore mined($)55.478.70 *20.9850.43
Non cash mining cost per tonne of ore mined($)13.55‐26.7615.12
Unit shipping costs($)3.858.58 *‐3.40
Milling cost per tonne of ore milled($)16.0544.71 *14.6316.35
Cash milling cost per tonne of ore milled($)14.1733.24 *13.5714.41
Non cash milling cost per tonne of ore milled($)1.8811.47 *1.061.94
Silver($ per ounce)9.3017.60 *9.80
Gold($ per ounce)4521,227 *1,046536
Lead($ per pound)0.330.55 *0.35
Zinc($ per pound)0.26‐0.27
Total production cost per ounce of Silver($)2.49(27.00) *2.47
Total cash cost per ounce of Silver($)0.16(27.00) *0.14
Total production cost per ounce of Gold($)1,0461,046
Total cash cost per ounce of Gold($)577577
Silver (%)91.749.790.9
Gold (%)90.1 90.1
Lead(%)94.049.793.2
Zinc(%)63.041.962.6
Silver (gram/tonne)22726225
Gold (gram/tonne)2.2 2.2
Lead(%)3.61.33.6
Zinc(%)1.11.31.1
Silver(in thousands of ounces)1,2231 *‐1,224
Gold(in thousands of ounces)0.80.1 *1.72.6
Lead (in thousands of pounds)13,71331 *‐13,744
Zinc(in thousands of pounds)2,974‐‐2,974
Silver(in thousands of $)28,10920 *‐28,129
Gold(in thousands of $)925161 *2,2533,339
Lead(in thousands of $)11,16122 *‐11,183
Zinc (in thousands of $)1,898‐‐1,898
42,0932032,25344,549
Silver($ per ounce)22.9722.9822.97
Gold($ per ounce)1,1161,6021,307 1,258
Lead($ per pound)0.810.720.81
Zinc($ per pound)0.64‐0.64