Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SVM.TO ·

Silvercorp Reports Adjusted Net Income of $37.0 Million, $0.21 PER Share, and Cash Flow from Operation of $85.6 Million FOR Fiscal 2023

Financials

NEWS RELEASE

Trading Symbol: TSX: SVM

NYSE AMERICAN: SVM

SILVERCORP REPORTS ADJUSTED NET INCOME OF $37.0 MILLION, $0.21 PER SHARE,

AND CASH FLOW FROM OPERATION OF $85.6 MILLION FOR FISCAL 2023

VANCOUVER, British Columbia – May 2 5, 202 3 – Silvercorp Metals Inc. (“Silvercorp” or the “Company”)

(TSX/NYSE American: SVM) reported its financial and operating results for the three months (“Q4 Fiscal 2023”)

and twelve months ended March 31, 2023 (“Fiscal 2023”). All amounts are expressed in US dollars, and figures

may not add due to rounding.

HIGHLIGHTS FOR FISCAL 2023

• Mined 1,068,983 tonnes of ore, milled 1,072,654 tonnes of ore, and produced approximately 6 .6 million

ounces of silver, 4,400 ounces of gold, or approximately 7.0 million ounces of silver equivalent, plus

68.1 million pounds of lead, and 23.5 million pounds of zinc ;

• Sold approximately 6.6 million ounces of silver, 4,400 ounces of gold, 65.7 million pounds of lead, and 23.4

million pounds of zinc, for revenue of $208.1 million;

• Reported net income attributable to equity shareholders of $20.6 million, or $0.12 per share;

• Realized adjusted earnings attributable to equity shareholders of $37.0 million, or $0.21 per share. The

adjustments were made to remove impacts from non-recurring items, share-based compensation, foreign

exchange gain/loss, impairment adjustments and reversals, gain/loss on equity investments, dilution

gain/loss, and the share of associates’ operating results;

• Generated cash flow from operating activities of $85.6 million;

• Cash cost per ounce of silver, net of by-product credits, of negative $0.42;

• All-in sustaining cost per ounce of silver, net of by-product credits, of $9.73;

• Paid $4.4 million of dividends to the Company’s shareholders;

• Spent $2.1 million to buy back 838,237 common shares of the Company under its Normal Course Issuer

Bid;

• Spent and capitalized $8.3 million on exploration drilling, $34.0 million on underground development and

exploration tunneling, and $15.6 million on equipment and facilities, including $4.8 million on construction

of the new mill and tailings storage facility; and

• Strong balance sheet with $203.3 million in cash and cash equivalents and short -term investments. The

Company holds a further equity investment portfolio in associates and other companies with a total market

value of $141.9 million as at March 31, 2023.

HIGHLIGHTS FOR Q4 FISCAL 2023

• Mined 181,848 tonnes of ore, milled 179,393 tonnes of ore, and produced approximately 1.1 million

ounces of silver, 1,000 ounces of gold, 10.9 million pounds of lead, and 3.6 million pounds of zinc;

• Sold approximately 1.1 million ounces of silver, 1,000 ounces of gold , or 1.2 million ounces of silver

equivalent, 10.0 million pounds of lead, and 3.5 million pounds of zinc, for revenue of $34.1 million;

• Reported net income attributable to equity holders of $0.2 million, or $0.00 per share;

• Realized adjusted earnings attributable to equity holders of $5.0 million, or $0.03 per share;

• Cash costs per ounce of silver, net of by-product credits, of $0.92;

• All-in sustaining costs per ounce of silver, net of by-product credits, of $13.85;

• Generated cash flow from operating activities of $5.7 million; and,

• Spent and capitalized $1.0 million on exploration drilling, $5.9 million on underground development and

exploration tunneling, and $2.5 million on equipment and facilities.

CONSOLIDATED FINANCIAL RESULTS

1. Fiscal 2023 Financial Results

Net income attributable to equity holders of the Company in Fiscal 2023 was $20.6 million or $0.12 per share,

compared to net income of $30.6 million or $0.17 per share for the twelve months ended March 31, 2022

(“Fiscal 2022”).

In Fiscal 2023, the Company’s consolidated financial results were mainly impacted by i) increases of 6%, 29%

and 3%, respectively, in silver, gold, and lead sold, and a decrease of 13% in zinc sold; ii) decreases of 12%, 3%

and 2%, respectively, in the rea lized selling prices for silver, lead and zinc, and increases of 1%, in the realized

selling prices for gold; iii) a foreign exchange gain of $4.8 million mainly arising from the appreciation of the US

dollar against the Canadian dollar; iv) a loss of $2. 3 million on equity investments; v) an impairment charge of

$20.2 million against the Las Yesca Project , and vi) an impairment charge of $2.9 million against a short-term

investment in certain bonds.

Revenue in Fiscal 2023 was $208.1 million, down 4% compared to $217.9 million in Fiscal 2022. The decrease is

mainly due to i) a decrease of $16.6 million arising from the decrease in the net realized selling prices for silver,

lead, and zinc; ii) a decrease of $3.6 million arising from the decrease in zinc sold, offset by iii) an increase of

$9.7 million arising from the increase in silver, gold and lead sold.

Income from mine operations in Fiscal 2023 was $70.8 million, down 16% compared to $84.3 million in Fiscal

2022. Income from mine operations at the Ying Mining District was $62.8 million, compared to $70.0 million in

Fiscal 2022. Income from mine operations at the GC Mine was $8.4 million, compared to $14.8 million in Fiscal

2022.

Cash flow provided by operating activities in Fiscal 2023 was $85.6 million, down $21.7 million, compared to

Three months ended March 31, Year ended March 31,

2023 2022 Changes 2023 2022 Changes

Financial Results

Revenue (in thousands of $) 34,147$ 41,590$ -18% 208,129$ 217,923$ -4%

Mine operating earnings (in thousands of $) 9,776 13,709 -29% 70,783 84,301 -16%

Net income (loss) attributable to equity holders (in thousands of $) 235 3,966 -94% 20,608 30,634 -33%

Earnings (loss) per share - basic ($/share) 0.00 0.02 -95% 0.12 0.17 -29%

Adjusted earnings attributable to equity holders (in thousands of $) 4,971 9,496 -48% 37,027 52,427 -29%

Adjusted earning per share - basic ($/share) 0.03 0.05 -40% 0.21 0.30 -30%

Net cash generated from operating activities (in thousands of $) 5,742 11,406 -50% 85,643 107,378 -20%

Capitalized expenditures (in thousands of $) 9,457 9,960 -5% 57,823 53,991 7%

Metals sold

Silver (in thousands of ounces) 1,073 1,173 -9% 6,637 6,265 6%

Gold (in thousands of ounces) 1.0 0.5 100% 4.4 3.4 29%

Lead (in thousands of pounds) 10,021 12,279 -18% 65,687 63,563 3%

Zinc (in thousands of pounds) 3,451 4,340 -20% 23,438 26,809 -13%

Average Selling Price, Net of Value Added Tax and Smelter Charges

Silver ($/ounce) 18.18 19.38 -6% 17.11 19.36 -12%

Gold ($/ounce) 1,620 1,475 10% 1,511 1,495 1%

Lead ($/pound) 0.87 0.93 -6% 0.87 0.90 -3%

Zinc ($/pound) 0.89 1.22 -27% 1.06 1.08 -2%

Financial Position as at March 31, 2023 December 31, 2022 March 31, 2023 March 31, 2022

Cash and cash equivalents and short-term investments (in thousands of $) 203,323 210,261 -3% 203,323 212,925 -5%

Working capital (in thousands of $) 177,808 176,960 0% 177,808 186,270 -5%

$107.4 million in Fiscal 2022.

The Company ended Fiscal 2023 with $203.3 million in cash, cash equivalents and short-term investments, down

5% or $9.6 million compared to $212.9 million as at March 31, 2022.

Working capital as at March 31, 2023 was $177.8 million, down 5% or $8.5 million compared to $186.3 million

as at March 31, 2022.

2. Q4 Fiscal 2023 Financial Results

Net income attributable to equity holders of the Company in Q4 Fiscal 2023 was $0.2 million or $0.00 per share,

compared to net income of $4.0 million or $0. 02 per share in the three months ended March 31, 2022 (“Q4

Fiscal 2022”).

In Q4 Fiscal 2023, the Company’s consolidated financial results were mainly impacted by i) decreases of 9%, 18%

and 20%, respectively, in silver, lead and zinc sold, and an increase of 100% in gold sold; ii) decreases of 6%, 6%

and 27%, respectively, in the realized selling prices for silver, lead and zinc , and an increase of 10% in the net

realized selling price for gold ; iii) a loss of $1.1 million on equity investments; and iv) an impairment charge of

$1.9 million against a short-term investment in certain bonds.

Revenue in Q4 Fiscal 2023 was $34.1 million, down 18% compared to $41.6 million in Q4 Fiscal 2022. The

decrease is mainly due to a decrease of $3. 6 million arising from the decrease in the net realized selling prices

for silver, lead and zinc, and a decrease of $4.6 million arising from the decrease in silver, lead and zinc sold. The

following table summarizes the metals sold, net realized selling price and revenue achieved for each metal.

Income from mine operations in Q4 Fiscal 2023 was $9.8 million, down 29% compared to $13.7 million in Q4

Fiscal 2022. Income from mine operations at the Ying Mining District was $9.5 million, compared to $11.9 million

in Q4 Fiscal 2022. Income from mine operations at the GC Mine was $0.4 million, compared to $2.0 million in

Q4 Fiscal 2022.

Cash flow provided by operating activities in Q4 Fiscal 2023 was $5.7 million, down $5.7 million, compared to

$11.4 million in Q4 Fiscal 2022.

CONSOLIDATED OPERATIONAL RESULTS

1. Fiscal 2023 Operational Results

In Fiscal 2023, the Company mined 1,068,983 tonnes of ore and milled 1,072,654 tonnes of ore, both up 7%

compared to 996,280 tonnes of ore mined and 1,002,335 tonnes of ore milled in Fiscal 2022.

In Fiscal 2023, the Company produced approximately 6.6 million ounces of silver, 4,400 ounces of gold, 68.1

million pounds of lead, and 23.5 million pounds of zinc, representing increases of 8%, 29% and 6%, respectively,

in silver, gold and lead production, and a decrease of 12% in zinc production over Fiscal 2022.

In Fiscal 2023, the consolidated production costs were $84.03 per tonne, down 1% compared to $84.85 in Fiscal

2022, while the all -in sustaining production costs per tonne of ore processed were $142.0 8, a slight increase

compared to $141.54 in Fiscal 2022.

Three months ended March 31, Year ended March 31,

2023 2022 Changes 2023 2022 Changes

Ore Production (tonne)

Ore mined 181,848 180,505 1% 1,068,983 996,280 7%

Ore milled 179,393 182,670 -2% 1,072,654 1,002,335 7%

Metal Production

Silver (in thousands of ounces) 1,106 1,146 -3% 6,617 6,149 8%

Gold (in thousands of ounces) 1.0 0.5 100% 4.4 3.4 29%

Lead (in thousands of pounds) 10,938 11,962 -9% 68,068 64,431 6%

Zinc (in thousands of pounds) 3,577 4,101 -13% 23,463 26,812 -12%

Cash Costs

Production costs per tonne of ore processed ($) 92.85 92.78 0% 84.03 84.85 -1%

All-in sustaining costs per tonne of ore processed ($) 165.68 171.56 -3% 142.08 141.54 0%

Cash costs per ounce of silver, net of by-product credits ($) 0.92 (0.54) 270% (0.42) (1.29) 67%

All-in sustaining costs per ounce of silver, net of by-product credits ($) 13.85 12.60 10% 9.73 8.77 11%

In Fiscal 2023, the consolidated cash costs per ounce of silver, net of b y-product credits, were negative $0.42,

compared to negative $1.29 in the prior year quarter. The increase was mainly due to a decrease of $2.1 million

in by-product credits and an increase of $3.2 million in expensed production costs.

The consolidated all-in sustaining costs per ounce of silver, net of by -product credits, were $9.73 compared to

$8.77 in Fiscal 2022. The increase was mainly due to i) the increase in the consolidated cash costs per ounce of

silver as discussed above, ii) an increase of $7.7 million in sustaining capital expenditures offset by a decrease

of $2.7 million in administrative expenses and mineral resources tax.

2. Q4 Fiscal 2023 Operational Results

In Q4 Fiscal 2023, the Company mined 181,848 tonnes of ore, up 1% compared to 180,5 05 tonnes in Q4 Fiscal

2022. Ore milled in Q4 Fiscal 2023 was 179,393 tonnes, down 2% compared to 182,670 tonnes in Q4 Fiscal 2022.

In Q4 Fiscal 2023, the Company produced approximately 1.1 million ounces of silver, 1,000 ounces of gold, 10.9

million pounds of lead, and 3.6 million pounds of zinc, representing an increase of 100% in gold production, and

decreases of 3%, 9% and 13%, respectively, in silver, lead and zinc production over Q4 Fiscal 2022.

In Q4 Fiscal 2023, the consolidated production costs were $92. 85 per tonne, relatively the same compared to

$92.78 per tonne in Q4 Fiscal 2022, and the all-in sustaining production costs per tonne of ore processed were

$165.68, down 3% compared to $171.56 in Q4 Fiscal 2022.

In Q4 Fiscal 2023, the consolidated cash costs per ounce of silver, net of by -product credits, were $0.92,

compared to negative $0.54 in the prior year quarter. The increase was mainly due to a decrease of $4.2 million

in by-product credits offset by a decrease of $2.6 million in expensed production costs. The consolidated all -in

sustaining costs per ounce of silver, net of by -product credits, were $13.85 compared to $1 2.60 in Q4 Fiscal

2022. The increase was mainly due to the increase in the consolidated cash costs per ounce of silver in the

current quarter as discussed above.

EXPLORATION AND DEVELOPMENT

In Fiscal 2023, on a consolidated basis, a total of 323,291 metres or $13.0 million worth of diamond drilling were

completed (Fiscal 2022 – 426,128 metres or $20.7 million), of which approximately 168,249 metres or $4. 7

million worth of diamond drilling were expensed as part of mining costs (Fiscal 2022 – 276,450 metres or $7.2

million) and approximately 155,042 metres or $8. 3 million worth of diamond drilling were capitalized (Fiscal

2022– 149,678 metres or $13.5 million). In addition, approximately 39,941 metres or $14.6 million worth of

mining preparation tunnels were completed and expensed as part of mining costs (Fiscal 2022 – 31,301 metres

or $11.6 million), and approximately 81,771 metres or $34.0 million worth of tunnels, raises, ramps and declines

were completed and capitalized (Fiscal 2022 – 74,062 metres or $31.0 million).

Equipment &

Mill and TSF Total

Mining

Preparation

Drilling

(Metres) ($ Thousand) (Metres) ($ Thousand) (Metres) ($ Thousand) ($ Thousand) ($ Thousand) (Metres) (Metres)

Fiscal 2023

Ying Mining District 6,944 5,173$ 62,105 24,782$ 124,533 5,677$ 12,478$ 48,110$ 32,870 124,874

GC Mine - - 12,722 4,023 22,024 816 2,816 7,655 7,071 43,375

Corporate and other - - - - 8,485 1,783 275 2,058 - -

Consolidated 6,944 5,173$ 74,827 28,805$ 155,042 8,276$ 15,569$ 57,823$ 39,941 168,249

Fiscal 2022

Ying Mining District 7,279 4,858$ 53,032 21,851$ 135,390 10,598$ 8,609$ 45,916$ 25,134 216,068

GC Mine 1,012 1,218 12,739 3,049 6,317 240 504 5,011 6,167 60,382

Corporate and other - - - - 7,971 2,612 452 3,064 - -

Consolidated 8,291 6,076$ 65,771 24,900$ 149,678 13,450$ 9,565$ 53,991$ 31,301 276,450

Changes (%)

Ying Mining District -5% 6% 17% 13% -8% -46% 45% 5% 31% -42%

GC Mine -100% -100% 0% 32% 249% 240% 459% 53% 15% -28%

Corporate and other - - - - 6% -32% -39% -33% - -

Consolidated -16% -15% 14% 16% 4% -38% 63% 7% 28% -39%

Capitalized Development and Expenditures

Ramp Development

Exploration and

Development Tunnels Drilling

Expensed

In December 2022, the Company’s Kuanping Silver -Lead-Zinc-Gold Project (“Kuanping Project”) received a

mining license (the “Kuanping Mining License”) from the Department of Natural Resources, Henan Province,

China. The Kuanping Mining License covers 6.97 square kilometres and is good until March 13, 2029.

In Fiscal 2023, a total of 8,485 metres or $0.9 million worth of drilling were completed and capitalized at the

Kuanping Project.

In Fiscal 2023, the Company spent $4.8 million on the construction of the tailing storage facility (“TSF”) and the

new mill, $35.1 million below the budgeted amount of $39.9 million. As of March 31, 2023, a total of 3,233

metres, or 64% of the designed drainage tunnels were completed and the site preparation for the new mill was

also completed. The Company has received all governmental approvals to construct the TSF and the new mill.

The Company still plans to complete the TSF in 2024 and is currently delay ing the construction of the new mill

by one year.

In addition, the Company spent approximately $2.0 million to upgrade most roads to concrete and upgrade

certain environmental protection facilities at the Ying Mining District as part of our continued commi tment to

building green mines. The Company also spent approximately $1.0 million to construct an X -Ray Transmission

Ore Sorting System (“XRT Ore Sorting System”) to optimize the mine plan and improve processing head grades

at the GC Mine. The XRT Ore Sorting System is currently in trial run.

INDIVIDUAL MINE OPERATING PERFORMANCE

Ying Mining District Q4 2023 Q3 2023 Q2 2023 Q1 2023 Q4 2022 Year ended March 31,

March 31, 2023 December 31, 2022 September 30, 2022 June 30, 2022 March 31, 2022 2023 2022

Ore Production (tonne)

Ore mined 132,205 206,854 215,927 214,038 130,612 769,024 681,398

Ore milled 130,910 213,830 216,262 212,055 131,731 773,057 684,293

Head grades

Silver (grams/tonne) 255 262 257 267 271 261 272

Lead (%) 3.6 4.0 3.7 3.9 3.9 3.8 3.9

Zinc (%) 0.6 0.7 0.7 0.7 0.8 0.7 0.8

Recovery rates

Silver (%) 95.2 95.7 95.5 95.7 95.2 95.6 95.1

Lead (%) 95.3 95.4 94.1 95.4 96.1 95.0 95.5

Zinc (%) 68.3 66.4 62.5 58.1 57.4 63.2 59.7

Cash Costs

Cash production cost per tonne of ore processed ($) 102.42 88.66 95.23 93.04 102.49 94.07 97.76

All-in sustaining cost per tonne of ore processed ($) 170.69 141.21 127.89 156.07 172.63 146.59 147.52

Cash cost per ounce of Silver, net of by-product credits ($) 1.37 0.24 1.86 0.28 1.21 0.88 0.96

All-in sustaining cost per ounce of silver, net of by-product credits ($) 11.33 7.66 6.82 8.60 10.76 8.29 7.93

Metal Production

Silver (in thousands of ounces) 997 1,674 1,657 1,696 1,062 6,024 5,509

Gold (in thousands of ounces) 1.0 1.1 1.2 1.1 0.5 4.4 3.4

Lead (in thousands of pounds) 9,688 17,647 16,201 16,718 10,542 60,254 54,883

Zinc (in thousands of pounds) 1,164 2,082 1,976 1,928 1,317 7,150 6,767

GC Mine Q4 2023 Q3 2023 Q2 2023 Q1 2023 Q4 2022 Year ended March 31,

March 31, 2023 December 31, 2022 September 30, 2022 June 30, 2022 March 31, 2022 2023 2022

Ore Production (tonne)

Ore mined 49,643 89,196 75,054 86,066 49,893 299,959 314,882

Ore milled 48,483 89,612 75,381 86,121 50,939 299,597 318,042

Head grades

Silver (grams/tonne) 88 75 72 71 62 75 75

Lead (%) 1.3 1.4 1.2 1.4 1.4 1.3 1.5

Zinc (%) 2.5 2.8 2.7 2.9 2.8 2.8 3.2

Recovery rates

Silver (%) 78.9 83.0 81.0 83.4 82.4 81.9 83.8

Lead (%) 90.9 90.3 88.5 89.8 88.7 89.8 89.2

Zinc (%) 89.3 90.1 89.6 90.4 89.8 89.9 89.6

Cash Costs

Cash production cost per tonne of ore processed ($) 67.34 52.35 59.84 57.92 67.33 58.29 56.90

All-in sustaining cost per tonne of ore processed ($) 84.79 88.26 78.31 81.68 100.13 83.33 79.56

Cash cost per ounce of Silver, net of by-product credits ($) (3.10) (13.72) (12.13) (22.42) (16.59) (13.72) (20.91)

All-in sustaining cost per ounce of silver, net of by-product credits ($) 5.93 5.02 (0.73) (7.48) (0.39) 0.50 (8.07)

Metal Production

Silver (in thousands of ounces) 109 179 141 164 84 593 640

Lead (in thousands of pounds) 1,250 2,412 1,782 2,370 1,420 7,814 9,548

Zinc (in thousands of pounds) 2,413 4,892 4,010 4,998 2,784 16,313 20,045

CONFERENCE CALL DETAILS

A conference call to discuss these results will be held tomorrow, Friday, May 26, at 9:00 am PDT (12:00 pm EDT).

To participate in the conference call, please dial the numbers below.

Canada/USA TF: 888-664-6383

International/Local Toll: 416-764-8650

Conference ID: 50474162

Participants should dial-in 10 – 15 minutes prior to the start time. A replay of the conference call and transcript

will be available on the Company’s website at www.silvercorp.ca.

Mr. Guoliang Ma, P.Geo., Manager of Exploration and Resources of the Company, is the Qualified Person as

defined by National Instrument 43 -101 – Standards of Disclosure for Mineral Projects (“NI 43 -101”) and has

reviewed and given consent to the technical information contained in this news release.

About Silvercorp

Silvercorp is a Canadian mining company producing silver, gold, lead, and zinc with a long history of profitability

and growth potential. The Company’s strategy is to create shareholder value by 1) focusing on generating free

cashflow from long life mines; 2) organic growth through extensive drilling for discovery; 3) ongoing merger and

acquisition efforts to unlock value; and 4) long term commitment to responsible mining and ESG. For more

information, please visit our website at www.silvercorp.ca.

For further information

Silvercorp Metals Inc.

Lon Shaver

Vice President

Phone: (604) 669-9397

Toll Free 1(888) 224-1881

Email: [email protected]

Website: www.silvercorp.ca

ALTERNATIVE PERFORMANCE (NON-IFRS) MEASURES

This news release should be read in conjunction with the Company's Management Discussion & Analysis (“MD&A”), the

audited condensed consolidated financial statements and related notes contains therein for the year ended March 31, 2023,

which have been posted on SEDAR under the Company’s profile at www.sedar.com and on EDGAR at www.sec.gov, and are

also available on the Company's website at www.silvercorp.ca under the Investor section. This news release refers to various

alternative performance (non-IFRS) measures, such as adjusted earnings and adjusted earnings per share, cash costs and all-

in sustaining costs per ounce of silver, net of by-product credits, production costs and all-in sustaining production costs per

tonne of ore processed, silver equivalent, and working capital. These measures are widely used in the mining industry as a

benchmark for performance, but do not have standardized meanings under IFRS as an indicator of performance and may

differ from methods used by other companies with similar description. The detailed description and reconciliation of these

alternative performance (non-IFRS) measures have been incorporated by reference and can be found on page 33, section

13 – Alternative Performance (Non -IFRS) Measures in the MD&A for the year ended March 31, 2023 filled on SEDAR at

www.sedar.com and EDGAR at www.sec.gov and which is incorporated by reference here in.

CAUTIONARY DISCLAIMER - FORWARD-LOOKING STATEMENTS

Certain of the statements and information in this news release constitute “forward-looking statements” within the meaning

of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning

of applicable Canadian and US securities laws (collectively, “forward -looking statements”). Any statements or information

that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives,

assumptions or future events or performance (often, but not always, using words or phrases such as “expects”, “is expected”,

“anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategies”, “targets”, “goals”, “forecasts”,

“objectives”, “ budgets”, “schedules”, “potential” or variations thereof or stating that certain actions, events or results

“may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar

expressions) are not st atements of historical fact and may be forward -looking statements. Forward -looking statements

relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve

estimates at the Company’s material pro perties; the sufficiency of the Company’s capital to finance the Company’s

operations; estimates of the Company’s revenues and capital expenditures; estimated production from the Company’s

mines in the Ying Mining District and the GC Mine; timing of receipt of permits and regulatory approvals; availability of funds

from production to finance the Company’s operations; and access to and availability of funding for future construction, use

of proceeds from any financing and development of the Company’s properties.

Actual results may vary from forward-looking statements. Forward-looking statements are subject to a variety of known and

unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the

forward-looking statements, including, without limitation, risks relating to: global economic and social impact of COVID-19;

fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery;

interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development

programs; feasibility and engineering reports; permits and licences; title to properties; property interests; joint venture

partners; acquisition of commerc ially mineable mineral rights; financing; recent market events and conditions; economic

factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of

future production; integration of future acquisition s into the Company’s existing operations; competition; operations and

political conditions; regulatory environment in China and Canada; environmental risks; foreign exchange rate fluctuations;

insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal

control over financial reporting; and bringing actions and enforcing judgments under U.S. securities laws.

This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Forward-looking

statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other

future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of

risks, uncertainties and other factors, including, without limitation, those referred to in the Company’s Annual Information

Form under the heading “Risk Factors” and in the Company’s Annual Report on Form 40-F, and in the Company’s other filings

with Canadian and U.S. securities regulators. Although the Company has attempted to identify important factors that could

cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, e stimated,

described or intended. Accordingly, readers should not place undue reliance on forward-looking statements.

The Company’s forward -looking statements are based on the assumptions, beliefs, expectations and opinions of

management as of the date of this news release, and other than as required by applicable securities laws, the Company does

not assume any obligation to update forward -looking statements if circumstances or management’s assumptions, beliefs,

expectations or opinions should change, or changes in any other events affecting such statements. Assumptions may prove

to be incorrect and actual results may differ materially from those anticipated. Consequently, guidance cannot be

guaranteed. For the reasons set forth above, investors should not place undue reliance on forward-looking statements.