Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SVM.TO ·

Silvercorp Extends Mineralized Veins BY Drilling and Tunneling at the Tlp and LME Mines

Drill Results

1

NEWS RELEASE

Trading Symbol: TSX: SVM

NYSE AMERICAN: SVM

SILVERCORP EXTENDS MINERALIZED VEINS BY DRILLING AND TUNNELING AT THE TLP AND

LME MINES, YING MINING DISTRICT, CHINA

VANCOUVER, British Columbia – August 24, 2017 – Silvercorp Metals Inc. ("Silvercorp” or the

“Company”) (TSX:SVM / NYSE AMERICAN: SVM) is pleased to report results of the first half of its

2017 exploration programs at the TLP and LME mines, Ying Mining District, Henan Province,

China.

In the first half of 2017, t he Company completed 17,230 meters (“m”) of underground diamond

drilling and 6,196m of exploration tunneling at the TLP and LME mines. Underground drilling

continuously extended the major mineralized vein structures along strike and downdip, and drift

tunneling exposed high-grade mineralized zones at both mines.

Highlights of selected intersections of drill holes:

LME Mine:

 Hole ZKL51A21 intersected a 6.85m interval from 21.32m to 28.17m, 6.74m true width, of

vein LM5E1 grading 419 grams per tonne (“g/t”) silver (“Ag”) , 0.96% lead (“Pb”) and 0.38%

zinc (“Zn”) at the 546m elevation, including a 0.58m interval from 23.46m to 24.04m, 0.57m

true width grading 1,151g/t Ag, 5.81% Pb and 1.99% Zn, and a 2.16m interval from 41.33m

to 43.49m, 2.12m true width, of vein LME grading 1,347 g/t Ag, 1.45% Pb and 0.68% Zn at

the 539m elevation; and

 Hole ZKL5337 intersected a 7.50m interval from 297.36m to 304.86m, 5.38m true width, of

vein LM5 grading 558g/t Ag, 3.31% Pb and 0.56% Zn at the 240m elevation, including a

0.60m interval from 300.94m to 301.54m, 0.43m true width grading 4,229g/t Ag, 19.76% Pb

and 0.96% Zn.

TLP Mine:

 Hole ZKT2541 intersected an 1.17m interval from 86.19m to 87.36m, 0.80m true width, of

vein T39W grading 1,577g/t Ag, 10.40% Pb and 3.10% Zn at the 796m elevation.

Highlights of selected mineralization zones exposed in exploration drift tunnels:

LME Mine:

2

 Drift Tunnel PD900-LM5E2-550-51NSYM exposed mineralization of 75m long and 1.07m

wide (true width) grading 595 g/t Ag, 2.29% Pb and 0.78% Zn within vein structure LM5E on

the 550m level.

TLP Mine:

 Drift Tunnel PD846-T16E-846-4SYM exposed mineralization of 45m long and 0.54 m wide

(true width) grading 1,621g/t Ag, 2.60% Pb and 0.24 % Zn within vein structure T16E on the

846m level; and

 Drift Tunnel PD820-T14-700-2NYM exposed mineralization of 119m long and 0.86 m wide

(true width) grading 406g/t Ag, 5.03% Pb and 0.54% Zn within vein structure T14 on the

700m level.

Diamond drill holes are designed to define and upgrade inferred mineral resource blocks and

test for new mineral resources. Underground drilling is mainly conducted from current

production lev els to delineate the downdip and along-strike extensions of known mineralized

vein structures in the production area and test for new veins in the previous less-explored areas.

The first half of 2017 drilling program at TLP and LME mines is briefly summarized in the

following table:

Major Target

Veins Meters

Drilled

Holes

Completed

Samples

Collected

Holes with

Assay

Received

Holes

Intercepted

Vein

Structures

Holes

Intercepted

Mineralization

TLP Mine

T1W1, T1W2,

T8, T11, T15,

T15W, T16,

T27 ,T28, T38,

and T39

12,609 44 1,089 45 45 31

LME Mine

LM3, LM4,

LM5, LM6,

LM9, and ZG 4,621 17 639 30 30 17

The 2017 e xploration tunneling, comprising drifting, crosscutting and r aising, was driven along

and across major mineralized vein structures to upgrade drill defined mineral resources and test

for new parallel and splay structures.

The first half of 2017 tunneling program at TLP and LME mines is briefly summarized in the

following table:

3

Major Target Veins

Total

Tunneling

(m)

Channel

Samples

Collected

Drift

Tunneling

Included

(m)

Total Mineralization Exposed by Drift Tunneling

Length

(m)

Average

True

Width (m)

Ag (g/t) Pb (%) Zn (%)

TLP Mine

T1, T2, T3, T3E, T4,

T5, T14, T14E,

T15W, T16, T16W,

T16E, T17, T22, T27,

T33E

4,458 2,172 3,288 1,242 0.66 447 3.73 0.55

LME Mine

LM3, LM4, LM5,

LM5E, and ZG1 1,738 766 1,088 442 0.76 442 1.71 0.50

Tables 1 and 2 below list the assay results of some selected mineralized intersections in drill

holes and mineralized zones exposed in drift tunnels in the first half of 2017 exploration

programs.

Table 1: Selected drilling results from the 2017 drilling program at TLP and LME mines

Hole ID From

(m) To (m) Elevation

(m)

Interval

(m)

True

Width

(m)

Ag

(g/t)

Pb

(%)

Zn

(%) Vein Remarks

LME mine

ZKL5031 55.96 56.49 458 0.53 0.45 110 0.57 0.09 LM3_1 Test*

208.75 209.53 338 0.78 0.69 181 0.12 0.63 LM6 Test

212.54 212.98 335 0.44 0.39 122 0.43 2.12 LM6E Test

277.65 278.20 284 0.55 0.48 253 2.83 2.26 LM5E Stepout***

ZKL5746 358.46 358.87 767 0.41 0.41 269 0.34 0.44 ZG2 Test

ZKL51A21 15.22 16.52 548 1.30 1.28 291 0.44 0.17 LM5 Infill**

21.32 28.17 546 6.85 6.74 419 0.96 0.38 LM5E1 Infill

Including 23.46 24.04 545 0.58 0.57 1,151 5.81 1.99

27.27 27.76 544 0.49 0.48 1,447 1.00 0.11

41.33 43.49 539 2.16 2.12 1,347 1.45 0.68 LM5E Infill

Including 41.33 42.26 539 0.93 0.91 1,968 1.70 0.57

51.67 52.63 535 0.96 0.84 239 0.81 0.18 LM5E2 Test

300.75 301.16 450 0.41 0.40 271 0.63 0.33 ZG2 Infill

ZKL5032 237.24 237.73 305 0.49 0.43 100 0.33 0.20 LM6 Test

ZKL5043 21.73 23.78 549 2.05 1.57 1,377 1.25 1.17 LM5 Infill

Including 22.88 23.78 548 0.90 0.69 2,581 1.83 2.23

ZKL5105 45.87 48.55 532 2.68 2.58 582 0.76 0.37 LM5E Infill

ZKL52A21 70.51 72.32 505 1.81 1.60 942 3.98 0.68 LM5 Infill

103.31 104.94 482 1.63 1.43 179 1.68 0.39 LM5E Infill

ZKL5321 57.76 58.17 534 0.41 0.40 109 0.29 0.08 LM5 Test

93.77 95.17 522 1.40 1.38 1,338 2.43 0.46 LM5E Infill

Including 93.77 94.45 521 0.68 0.67 2,244 4.63 0.66

ZKL5337 297.36 304.86 240 7.50 5.38 558 3.31 0.56 LM5 Test

Including 300.94 301.54 236 0.60 0.43 4,229 19.76 0.96 315.93 316.68 223 0.75 0.54 435 4.38 3.33 LM5E Test

ZKL53A21 21.19 22.28 547 1.09 0.99 467 1.33 0.93 LM5W2 Test

100.91 103.23 520 2.32 2.11 693 2.51 0.54 LM5E Infill

ZKL53A22 23.77 24.25 538 0.48 0.42 342 2.53 1.00 LM5W2 Stepout

32.51 32.94 532 0.43 0.38 201 0.72 0.08 LM5W Infill

111.96 112.52 482 0.56 0.49 356 0.75 0.58 LM5E Infill

54.99 55.49 511 0.50 0.42 105 0.53 0.32 LM5 Test

ZKL5422 392.93 393.25 160 0.32 0.22 154 4.08 2.95 LM5E Test

424.88 428.68 133 3.80 2.59 212 5.83 1.17 LM5E2 Test

TLP mine

ZKT2541 19.40 19.91 829 0.51 0.35 283 3.00 1.80 T38 Test

86.19 87.36 796 1.17 0.80 1,577 10.40 3.10 T39W Test

ZKG0531 13.35 14.01 852 0.66 0.61 118 0.20 0.30 T16E Stepout

161.13 161.63 816 0.50 0.46 56 5.10 1.10 T15W Test

4

ZKG0532 211.95 212.97 685 1.02 0.94 85 7.80 5.20 T11 Stepout

ZKT2542 135.69 136.12 745 0.43 0.28 1,033 0.80 1.00 T39 Test

310.63 311.13 630 0.50 0.34 36 8.20 2.40 T16 Stepout

ZKTA1201 96.57 97.23 979 0.66 0.63 549 15.40 2.70 T27E Stepout

155.44 156.46 984 1.02 0.95 147 0.40 0.30 T27 Infill

ZKTA1002 149.64 151.24 903 1.60 0.49 992 6.30 3.20 T1W2 Stepout

163.21 163.75 897 0.54 0.16 416 0.80 0.10 T25 Test

166.83 167.99 895 1.16 0.35 118 0.90 0.20 New vein to be

named Test

ZKG0533 20.73 21.32 836 0.59 0.39 197 0.40 0.50 T16E Infill

ZKTA1001 104.68 105.14 998 0.46 0.42 349 1.30 0.10 T1W2 Test

ZKT2326 93.94 94.44 755 0.50 0.34 399 3.50 0.40 T39W Test

ZKG0933 21.82 22.54 836 0.72 0.38 143 0.40 0.50 T16E Infill

261.00 262.29 629 1.29 0.81 478 4.10 0.30 T11 Test

ZKG0934 27.66 29.01 829 1.35 0.61 277 1.00 0.30 T16E Infill

ZKG1241 50.60 50.95 810 0.35 0.30 283 2.70 0.90 T12 Test

ZKT1005 98.51 99.16 958 0.65 0.49 211 1.70 0.10 T1W2 Stepout

ZKT0821 4.14 4.57 953 0.43 0.21 545 1.10 0.30 T16E1 Test

ZKT0823 1.91 2.83 954 0.92 0.75 134 0.40 0.20 T16Branch Test

ZKT1744 419.08 419.46 695 0.38 0.36 460 0.40 1.30 T15W Test

ZKT06A21 25.67 28.21 944 2.54 1.70 146 0.70 0.30 T16E Test

ZKT0822 60.56 61.50 994 0.94 0.76 179 0.60 0.10 T16E Test

77.82 78.16 1004 0.34 0.27 237 0.80 0.10 T16 Test

ZKG0422 201.22 201.82 523 0.60 0.52 167 3.70 0.70 T11 Stepout

284.94 285.36 468 0.42 0.37 11 4.70 0.50 T11E Stepout

ZKGA1411 154.20 154.49 772 0.29 0.11 108 0.40 0.60 T16W Stepout

166.28 169.23 766 2.95 1.16 92 6.70 0.10 T14E Infill

ZKL2602 80.76 81.58 904 0.82 0.51 199 1.70 0.10 T15W Test

324.64 325.06 857 0.42 0.36 836 2.60 0.60 T22 Test

ZKT1021 60.77 61.67 938 0.90 0.38 105 0.30 0.10 T16E Test

107.34 108.39 925 1.05 0.44 767 5.30 2.80 T16 Test

*Test: intersections in open areas without known mineralization for new resource delineation

**Infill: intersections within known resource blocks for resource upgrade

***Stepout: intersections adjacent to existing resource blocks for resource expansion

Table 2: Selected mineralized zones exposed by drift tunneling at TLP and LME mines

Tunnel ID Target

Vein

Level

(m)

Length

(m)

True

Width

(m)

Ag

(g/t)

Pb

(%)

Zn

(%)

TLP Mine

PD730-T1W2-765-11NYM T1W2 765 25 0.63 140 0.65 0.23

PD1050-T3-1050-1SYM T3 1050 95 1.01 101 1.56 0.12

PD800-T3E-800-35SNYM T3E 800 115 0.85 255 5.75 0.45

PD1070-T4-1070-5NSYM T4 1070 40 0.40 563 5.00 0.23

PD840-T5E1-840-13SYM T5E1 840 35 0.34 263 5.11 10.00

PD820-T14-700-2NYM T14 700 119 0.86 406 5.03 0.54

PD820-T16E-755-8NYM T16 755 29 1.66 915 3.40 0.66

PD820-T16W-700-8SYM T16W 700 38 0.62 1,207 6.36 1.03

PD846-T16E-846-4SYM T16E 846 45 0.54 1,621 2.60 0.24

PD820-T16E-755-8NYM T16E 755 55 0.30 130 1.51 0.25

PD820-T17-755-14NYM T17W 755 60 0.40 263 2.13 0.22

PD930-T22-930-6NYM T22 930 25 0.43 237 4.27 0.20

PD960-T27-960-14NSYM T27 960 40 0.49 159 2.88 0.23

PD930-T33E-940-Sublevel-

3NSYM T33E 940 35 0.57 303 5.19 0.22

PD800-T33E-800-9NYM T33E 800 25 0.39 244 2.68 0.59

5

LME Mine PD838-LM3-700-58SYM LM3 700 30 0.39 525 1.44 0.41

PD900-LM5-600-60NYM LM5 600 50 1.23 375 1.50 0.35

PD900-LM5-500-52SNYM LM5 500 60 0.58 443 1.11 0.19

PD900-LM5E-600-67SYM LM5E 600 50 0.54 193 1.14 0.57

PD900-LM5E2-550-51NSYM LM5E 550 75 1.07 595 2.29 0.78

PD900-LM5E1-560-53NS LM5E1 560 25 0.89 594 1.08 0.30

Quality Control

Drill cores are NQ size. Drill core samples, limited by apparent mineralization contact or

shear/alteration contact, were split into halves by saw cutting. The half cores are stored in the

Company's core shacks for future reference and checking, and the ot her half core samples are

shipped in security sealed bags to the Chengde Huakan 514 Geology and Minerals Test and

Research Institute in Chengde, Hebei Province, China, 226 km northeast of Beijing, a nd the

Zhenzhou Nonferrous Exploration Institute Lab in Zh engzhou, Henan Province, China, and both

labs are ISO9000 certified analytical lab. For analysis the sample is dried and crushed to minus

1mm and then split to a 200 -300g subsample which is further pulverized to minus 200 mesh.

Two subsamples are prepared from the pulverized sample. One is digested with aqua regia for

gold analysis with AAS, and the other is digested with two -acids for analysis of silver, lead, zinc

and copper with AAS.

Channel samples are collected along sample lines perpendicular to the mineralized vein

structure in exploration tunnels. Spacing between sampling lines is typically 5m along strike.

Both the mineralized vein and the altered wall rocks are cut with continuous chisel chipping.

Sample length ranges from 0.2m to more than 1m, depending on the width of the mineralized

vein and the mineralization type. Channel samples are prepared and assayed with AAS at

Silvercorp’s mine laboratory (Ying Lab) located at the mill complex in Luoning County, Henan

Province, China. The Ying lab is officially accredited by the Quality and Technology Monitoring

Bureau of Henan Province and is qualified to provide analytical service. The channel samples are

dried, crushed and pulverized. A 200g sample of minus 160 mesh is prepared for assay. A

duplicate sample of minus 1mm is made and kept at the laboratory archives. Gold is analysed by

fire assay with AAS finish, and silver, lead, zinc and copper are assayed by two-acid digestion

with AAS finish.

A routine quality assurance/quality control (QA/QC) procedure is adopted to monitor the

analytical quality at the lab. Certified reference materials (CRMs), pulp duplicates and blanks are

inserted into each lab batch of samples. QA/QC data at the lab are attached to the assay

certificates for each batch of samples.

The Company maintains its own comprehensive QA/QC program to ensure best practice s in

sample preparation and analysis of the exploration samples. Project geologists regularly insert

CRM, field duplicates and blanks to each batch of core samples to monitor the sample

preparation and analysis procedures at the labs. The analytical quality of the labs is further

evaluated with external checks by sending about 3-5% of the pulp samples to higher level labs to

check for lab bias.

6

Data from both the Company's and the labs' QA/QC programs are reviewed on a timely basis by

project geologists.

Ruijin Jiang, P. Geo , reviewed the exploration data and prepared t he scientific and technical

information regarding explorat ion results contained herein . Alex Zhang, P. Geo, VP exploration

of the Company, is the Qualified Person on the project as defined under National Instrument 43-

101 and he has verified and approved the contents of this news release.

About Silvercorp

Silvercorp is a low-cost silver-producing Canadian mining company with multiple mines in China.

The Company’s vision is to deliver shareholder value by focusing on the acquisition of under

developed projects with resource potential and the ability to grow organically. For more

information, please visit our website at www.silvercorp.ca.

For further information

Gordon Neal

Vice President, Corporate Development

Silvercorp Metals Inc.

Phone: (604) 669-9397

Toll Free: 1(888) 224-1881

Email: [email protected]

Website: www.silvercorpmetals.com

CAUTIONARY DISCLAIMER - FORWARD LOOKING STATEMENTS

Certain of the statements and information in this press release constitute “forward -looking

statements” within the meaning of the United States Private Securities Litigation Reform Act of

1995 and “forward -looking information” within the meaning of applicable Canadian provincial

securities laws. Any statements or information that express or involve discussions with respect

to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events

or performance (often, but not always, using words or phrases such as “expects”, “is expected”,

“anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “inte nds”, “strategies”,

“targets”, “goals”, “forecasts”, “objectives”, “budgets”, “schedules”, “potential” or variations

thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or

“will” be taken, occur or be achieved, or th e negative of any of these terms and similar

expressions) are not statements of historical fact and may be forward -looking statements or

information. Forward -looking statements or information relate to, among other things: the

price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates

at the Company’s material properties; the sufficiency of the Company’s capital to finance the

Company’s operations; estimates of the Company’s revenues and capital expenditures;

estimated production from the Company’s mines in the Ying Mining District; timing of receipt of

permits and regulatory approvals; availability of funds from production to finance the

Company’s operations; and access to and availability of funding for future constru ction, use of

proceeds from any financing and development of the Company’s properties.

7

Forward-looking statements or information are subject to a variety of known and unknown

risks, uncertainties and other factors that could cause actual events or results to differ from

those reflected in the forward -looking statements or information, including, without limitation,

risks relating to: fluctuating commodity prices; calculation of resources, reserves and

mineralization and precious and base metal recovery; int erpretations and assumptions of

mineral resource and mineral reserve estimates; exploration and development programs;

feasibility and engineering reports; permits an d licenses; title to properties; property interests;

joint venture partners; acquisition of commercially mineable mineral rights; financing; recent

market events and conditions; economic factors affecting the Company; timing, estimated

amount, capital and operating expenditures and economic returns of future production;

integration of future a cquisitions into the Company’s existing operations; competition;

operations and political conditions; regulatory environment in China and Canada;

environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining

operations; key personnel; conflicts of interest; dependence on management; internal control

over financial reporting as per the requirements of the Sarbanes -Oxley Act; and bringing actions

and enforcing judgments under U.S. securities laws.

This list is not exhausti ve of the factors that may affect any of the Company’s forward -looking

statements or information. Forward -looking statements or information are statements about

the future and are inherently uncertain, and actual achievements of the Company or other

future events or conditions may differ materially from those reflected in the forward -looking

statements or information due to a variety of risks, uncertainties and other factors, including,

without limitation, those referred to in the Company’s Annual Informati on Form for the year

ended March 31, 2017 under the heading “Risk Factors”. Although the Company has attempted

to identify important factors that could cause actual results to differ materially, there may be

other factors that cause results not to be as a nticipated, estimated, described or intended.

Accordingly, readers should not place undue reliance on forward -looking statements or

information.

The Company’s forward -looking statements and information are based on the assumptions,

beliefs, expectations and opinions of management as of the date of this press release, and other

than as required by applicable securities laws, the Company does not assume any obligation to

update forward -looking statements and information if circumstances or management’s

assumptions, beliefs, expectations or opinions should change, or changes in any other events

affecting such statements or information. For the reasons set forth above, investors should not

place undue reliance on forward-looking statements and information.