Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SVM.TO ·

Silvercorp Drilling Intercepts 1.9 Metres Grading 15 Grams PER Tonne GOLD at the New Dcg MINE

Drill Results

NEWS RELEASE

Trading Symbol: TSX/NYSE AMERICAN: SVM

SILVERCORP DRILLING INTERCEPTS 1.9 METRES GRADING 15 GRAMS PER TONNE GOLD AT

THE NEW DCG MINE, YING MINING DISTRICT, CHINA

VANCOUVER, BRITISH COLUMBIA – July 20, 2020 - Silvercorp Metals Inc. ("Silvercorp" or the

“Company”) is pleased to report that its first underground drill hole at the DCG Mine in the Ying

Mining District, Henan Province, China intercepted a 1.90 metre (“m”) interval grading 15.0 gram s

per tonne (g/t) gold (“Au”).

In 2006, Silvercorp acquired the DCG exploration permit, which is adjacent to the north of the TLP

Mine. It covers an area of 19.77 km2. A series of drill programs between 2006 and 2011 of 25 drill

holes comprised of 9,026 m focused on obvious lead-zinc veins . A maiden resource estimate that

complies with Chinese government requirement s, but not NI 43 -101, was completed in 2014 , and

Silvercorp successfully converted the exploration permit to a mining permit in 2015 . Information

regarding the DCG Mine, including a resource estimate, will be contained in the upcoming NI 43-101

update for the Ying Mining District planned to be released this quarter, currently being prepared by

the Company with assistance from AMC Mining Consultants (Canada) Ltd.

In late 2018, the Company decided to develop the DCG Mine and bring it into production. At present,

1,670 m of a 4.2 m wide by 3.8 m high access ramp has been developed and the remaining 95 m

should be completed by mid-August 2020, which will allow for mining late this year.

In addition, a 1,756 m transportation ramp is also under development from the TLP Mine camp area

to enable ore haulage. So far, 447 m has be en completed, with the remaining 1,309 m expected to

be completed by the end of April 2021.

Despite the mapping of extensive gold soil geochemical anomalies at the DCG Mine area by the

previous owner in 2003, the 2020 underground drill program at the DCG Mine of 8,000 m in 22 holes,

like the p revious drilling, was focused on extending the previously-identified lead-zinc veins. Three

holes have been completed and assay results have been received for one hole.

Previously, only very select intervals with obvious lead -zinc mineralization alteration were sampled

for the drill holes from the Ying Mining District. Recently, as potential gold mineralization was

identified at the nearby LMW, LME and TLP Mines, the C ompany has decided to sample the full

length of the drill core. As a result, h ole ZK03AC702 intercepted a 1.02 m interval from 259.01 to

260.03 m grading 1.5 g/t Au and a 1.9 0 m interval from 406.86 to 408.76 m grading 15.0 g/t Au

(Table 1), with native gold grains observed to be associated with strong silicification, and fine pyrite-

ankerite vein lets occur ring near the foot wall contact of a diabase dyke with the host Archean

gneisses. The gold-bearing diabase contact appears perpendicular to the drill hole orientation, and

therefore the 1.90 m interval is believed to be close to true width. The Company was able to make

this discovery of gold mineralization only by sampling the full length of the drill core. The extension

of this gold discovery will now be the focus of the 2020 drilling program.

2

Table 1: Initial assay results from the DCG Mine 2020 drill program

Year Hole ID From

(m)

To

(m)

Elevation

(m)

Interval

(m)

Ag

(g/t)

Pb

(%)

Zn

(%)

Au

(g/t)

Cu

(%)

2020 ZK03AC702 259.01 260.03 761.21 1.02 1 0.01 0.01 1.50 0.04

406.86 408.76 687.29 1.90 1 0.03 0.04 15.00 0.01

Table 2 below lists the assay results of select mineralized drill hole intercepts obtained between 2006

and 2011.

Table 2: Select drill results at the DCG Mine between 2006 and 2011

Year Hole ID From

(m)

To

(m)

Elevation

(m)

Interval

(m)

True thickness

(m)

Ag

(g/t)

Pb

(%)

Zn

(%)

Au

(g/t)

Cu

(%) Vein

2006 ZK5002 5.48 5.73 852.67 0.25 0.18 135 8.73 4.12 0.73 0.00 C9_1

2007 ZK501 239.50 239.90 750.96 0.40 0.26 10 3.63 0.10 0.16 0.02 C8

2007 ZK901 29.38 30.23 987.39 0.85 0.54 115 0.71 0.00 0.09 0.02 C8-1

2007 ZK002 100.90 101.62 847.02 0.72 0.48 16 7.35 0.00 0.04 0.04 C8-1

2007 ZK002 170.70 170.94 778.26 0.24 0.17 22 10.54 0.00 0.03 0.00 C8

2007 ZK002 245.60 246.20 704.6 0.60 0.35 9 7.25 0.00 0.02 0.02 C8-2

2007 ZK102 246.28 246.83 703.67 0.55 0.31 167 0.74 0.05 0.34 0.02 C8

2010 ZK4001 202.76 202.88 790.29 0.12 0.10 241 33.63 2.48 2.50 0.30 C4E

2010 ZK4002 201.28 201.67 756.55 0.39 0.25 27 5.46 0.10 0.00 0.06 C4

2010 ZK4002 234.69 235.90 725.28 1.21 0.78 12 3.89 0.41 0.05 0.01 C4E

2010 ZK4042 60.82 61.12 838.57 0.30 0.21 163 8.43 5.19 3.00 0.21 C4

2010 ZK4042 214.38 214.74 690.62 0.36 0.29 19 4.89 0.04 0.13 0.00 C4E

2010 ZK4031 234.16 234.75 835.29 0.59 0.53 90 18.02 0.17 0.01 0.03 C4E

2010 ZK4032 225.86 226.66 791.84 0.80 0.55 116 1.29 0.07 0.63 0.05 C4

2011 ZK4071 135.21 135.57 838.44 0.36 0.33 52 10.54 0.14 0.00 0.00 C4E

2011 ZK4051 138.28 139.02 869.23 0.74 0.60 17 4.27 0.09 0.00 0.04 C4E

2011 ZK4052 106.94 107.44 866.65 0.50 0.32 771 0.40 0.08 0.12 0.29 C4

2011 ZK4053 403.88 404.41 610.4 0.53 0.43 80 9.21 0.07 0.85 0.00 C4E

2011 ZK16001 236.34 237.94 767.94 1.60 1.42 132 0.20 0.70 0.02 0.05 W16

Quality Control

Drill cores are NQ size. Drill core samples, limited by apparent mineralization contact or

shear/alteration contact, were split into halves by saw cutting. The half cores are stored in the

Company's core shacks for future reference and checking, and the other half core samples are

shipped in security-sealed bags to the Chengde Huakan 514 Geology and Minerals Test and Research

Institute in Chengde, Hebei Province, China, 226 km northeast of Beijing, a nd the Zhen gzhou

Nonferrous Exploration Institute Lab in Zhengzhou, Henan Province, China . Both labs are ISO9000

certified analytical labs. For analysis the sample is dried and crushed to minus 1mm and then split to

a 200-300 g subsample which is further pulverized to minus 200 mesh. Two subsamples are prepared

from the pulverized sample. One is digested with aqua regia for gold analysis with atomic absorption

spectroscopy (AAS), and the other is digested with two -acids for analysis of silver, lead, zinc and

copper with AAS.

Channel samples are collected along sample lines perpendicular to the mineralized vein structure in

exploration tunnels. Spacing between sampling lines is typically 5 m along strike. Both the

mineralized vein and the altered wall rocks are cut with continuous chi sel chipping. Sample length

ranges from 0.2 m to more than 1 m, depending on the width of the mineralized vein and the

3

mineralization type. Channel samples are prepared and assayed with AAS at Silvercorp’s mine

laboratory (Ying Lab) located at the mill complex in Luoning County, Henan Province, China. The Ying

lab is officially accredited by the Quality and Technology Monitoring Bureau of Henan Province and is

qualified to provide analytical services. The channel samples are dried, crushed and pulverized. A 200

g sample of minus 160 mesh is prepared for assay. A duplicate sample of minus 1 mm is made and

kept in the laboratory archives. Gold is analysed by fire assay with AAS finish, and silver, lead, zinc

and copper are assayed by two-acid digestion with AAS finish.

A routine quality assurance/quality control (QA/QC) procedure is adopted to monitor the analytical

quality at each lab. Certified reference materials (CRMs), pulp duplicates and blanks are inserted into

each lab batch of samples. QA/QC data at the lab are attached to the assay certificates for each

batch of samples.

The Company maintains its own comprehensive QA/QC program to ensure best practice s in sample

preparation and analysis of the exploration samples. Project geologists regularly insert CRM, field

duplicates and blanks to each batch of 30 core samples to monitor the sample preparation and

analysis procedures at the labs. The analytical quality of the labs is further evaluated with external

checks by sending about 3-5% of the pulp samples to higher level labs to check for lab bias.

Data from both the Company's and the labs' QA/QC programs are reviewed on a timely basis by

project geologists.

Guoliang Ma, P. Geo., Manager of Exploration and Resource of the Company, is the Qualified Person

for Silvercorp under NI 43 -101 and has reviewed and given consent to the technical information

contained in this news release.

About Silvercorp

Silvercorp is a profitable Canadian mining company producing silver, lead and zinc metals in

concentrates from mines in China. The Company’s goal is to continuously create healthy returns to

shareholders through efficient management, organic growth and the acquisition of profitable

projects. Silvercorp balances profitability, social and environmental relationships, employees’

wellbeing, and sustainable development. For more information, please visit our website at

www.silvercorp.ca.

For further information

Lon Shaver

Vice President

Silvercorp Metals Inc.

Phone: (604) 669-9397

Toll Free: 1(888) 224-1881

Email: [email protected]

Website: www.silvercorp.ca

4

CAUTIONARY DISCLAIMER - FORWARD LOOKING STATEMENTS

Certain of the statements and information in this press release constitute “forward -looking statements” within the

meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward -looking information”

within the meaning of applica ble Canadian provincial securities laws. Any statements or information that express or

involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or

future events or performance (often, but not alway s, using words or phrases such as “expects”, “is expected”,

“anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategies”, “targets”, “goals”,

“forecasts”, “objectives”, “budgets”, “schedules”, “potential” or variations th ereof or stating that certain actions,

events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of

these terms and similar expressions) are not statements of historical fact and may be forward -looking statements or

information. Forward -looking statements or information relate to, among other things: the price of silver and other

metals; the accuracy of mineral resource and mineral reserve estimates at the Company’s material properties; the

sufficiency of the Company’s capital to finance the Company’s operations; estimates of the Company’s revenues and

capital expenditures; estimated production from the Company’s mines in the Ying Mining District; timing of receipt of

permits and regulatory approvals ; availability of funds from production to finance the Company’s operations; and

access to and availability of funding for future construction, use of proceeds from any financing and development of

the Company’s properties.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and

other factors that could cause actual events or results to differ from those reflected in the forward -looking statements

or information, includ ing, without limitation, risks relating to: social and economic impacts of COVID -19; fluctuating

commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery;

interpretations and assumptions of mineral resour ce and mineral reserve estimates; exploration and development

programs; feasibility and engineering reports; permits an d licens es; title to properties; property interests; joint

venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions;

economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic

returns of future production; integration of future acquisitions into the Company’s existing operati ons; competition;

operations and political conditions; regulatory environment in China and Canada; environmental risks; foreign

exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest;

dependence on management; internal control over financial reporting as per the requirements of the Sarbanes -Oxley

Act; and bringing actions and enforcing judgments under U.S. securities laws.

This list is not exhaustive of the factors that may affect any of the Co mpany’s forward -looking statements or

information. Forward -looking statements or information are statements about the future and are inherently

uncertain, and actual achievements of the Company or other future events or conditions may differ materially fro m

those reflected in the forward -looking statements or information due to a variety of risks, uncertainties and other

factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year ended

March 31, 2020 under the heading “Risk Factors”. Although the Company has attempted to identify important factors

that could cause actual results to differ materially, there may be other factors that cause results not to be as

anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward -

looking statements or information.

The Company’s forward -looking statements and information are based on the assumptions, beliefs, expectations and

opinions of management as of the date of this press release, and other than as required by applicable securities laws,

the Company does not assume any obligation to update forward -looking statements and information if circumstances

or management’s assumptions, beliefs, expectations or opinions sh ould change, or changes in any other events

affecting such statements or information. For the reasons set forth above, investors should not place undue reliance

on forward-looking statements and information.