Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SVM.TO ·

News release

Corporate Updates

NEWS

Tradin

SILVE

VANC

“Com

the  L

tunne

The ex

the  do

areas.

holes 

with 2

Most 

progra

drillin

LM5E

were 

using 

develo

since J

Low A

The  st

along 

by  qu

20  ho

ZKLDB

1.10m

Locall

result

0.09 g

Hole  Z

interc

believ

LM4E

Additi

The  st

LM62

S RELEASE 

ng Symbol: TS

RCORP INTER

L

COUVER,  Briti

pany”) (TSX/N

M E  m i n e ,  Y in

eling are ongoi

xploration pro

ow n  d i p  a n d  

.  So far, 13,5 1

and  six  surfa

21 holes interc

of the infill u

ams where m

g  program  in

1,  LM5E2, LM

discovered i n

existing  acce

opment  costs

July 2020 to c

Angle Gold Str

tep‐out  drillin

a northeast  s

artz‐pyrite  ba

oles  have  de f

B2101, ZKL671

m o f  v e i n  ‐  LM

y, LM4E2 is o

, hole ZKL53 S

g/t Au. Furthe

ZKL6713  disco

cept  (3.11m  t

ve d  t o  b e  a no

2 structure. 

ionally, the Co

tep‐out drilli n

, LM66, LM66

SX / NYSE Ame

RSECTS 0.92 M

LEAD AT THE 

sh  Columbia 

NYSE America

ng  Mining  Di

ing at the LME

ogram from O

along‐strike  e

15 metres (“m

ce  holes,  hav

cepting miner

nderground  d

ining access  t

tersected  ma

M5W,  and  LM6

n this product

ess  and  devel

  at  the  LME m

continue ident

ructures 

ng  also  target

strike of 60 d e

anding  and  K‐

fi n e d  a  m i n e

13, ZKL58T170

M4E2  with  go

ver‐printed by

S04_1 intercep

r drilling is ong

overed  anoth

true  thickness

ot h e r  l o w  a ng

ompany contin

ng  i n  t h e  s o u t

6E, and LM66E

erican: SVM

METRES GRA

LME MINE, Y

–  November

n: SVM) is pl e

strict,  Henan 

E mine, and al

October 1, 201

extensions  of 

m”) from a to t

ve  been  comp

alization. 

drills were fo c

tunnels were  d

any  higher  gra

6.   Some  new

ion area.  M o

opment  tunn

mine  going  fo

tifying these ty

te d  t h e  L M 4 E

egrees.  The  L

feldspar‐silicif

ralized  area 

03 and ZKL530

ld  grades  of 4

y late stage s u

pted 6.08m o f

going to test t

e r  l o w  a n g l e  

s)  grading  4. 5

gle  dipping  go

nues to test fo

heast  part  of 

E3. 

ADING 6,455 G

YING MINING

r  3,  2020 –  S i

eased to repo

Province,  Ch

l other mines 

9 to Septemb

known  mine

tal of 53 diam

pl e t e d .   A s s ay

cused on hig h

developed bu

ade  silver‐lead

w v e i n  s t r u c t u

ost of the hig h

e l s ,  w h i c h  i s  

or w a r d .   E i g ht

ypes of easily 

2  structure w

LM4E2 vein c

fication  altera

of  >1,500m  i

05_1 intersect

4.57  g/t,  4.53

ub‐vertical silv

f LM4E2 grad

the continuity

dipping  gold 

53  g/t  Au  w

old  structure 

or new vein st

the  LME  min

G/T SILVER, 1

G DISTRICT, C

ilvercorp  Met

rt results fro m

hi n a .   E x t e n s

 at the Ying M

ber 30, 2020 a

eralized  vein s

mond drill hole

y r e s u l t s  f o r  3

h grade drill i n

ut the mineral

d o r e  z o n e s ,  

res,  including

her grade  silv

expected  to 

t r i g s  h a v e  be

accessible zon

which  is  dippin

ontains gold 

at i o n .   S p o r ad

in  length  an d

ted intervals o

3  g/t,  4.94  g/t

ver‐lead veins

ing 375 g/t  A

y of vein LM4E

structure  ‐  L

ithout  other 

located  appr

ructures in pr

ne  discovered 

          Silvercorp M

Suite 1750 – 1

            Vancouver, B

            Tel:  604‐669‐

            Fax:  604‐669

10 G/T GOLD

CHINA 

tals  Inc.  ("Silv

m its explorat

ive  exploratio

Mining District.

t the LME min

structures  in t

es, including  4

32  holes  have 

ntercepts from

lization was n

including  vei

 L M 2 E ,  L M 5 E

ver‐lead zone s

substantially 

een  drilling  at 

nes. 

ng  at  a  10‐35

mineralization

dic  drill  interc

d  >800m  do w

of 3.31m, 4.21

t  and  3.31  g/

s such as LM 5

Ag and 1.61% 

E2. 

M66W.  It  ret

metals  prese

roximately  10

reviously less e

 n e w  v e i n s ,  in

Metals Inc. 

1066 West Hastings S

C, Canada  V6E 3X1

‐9397 

9‐9387 

D AND 5.28% 

vercorp”  or  th

ion program  a

on  drilling  a n

. 

ne has targete

the  productio

47 undergroun

been  receive

m previous d r

ot mined.  T h

ns  LM5,  LM5

a  and  LM5Ea

s can be mi ne

reduce  tunn

 t h e  L M E  m in

5  degree  angl

n characterize

epts  from  ove

wn  dip.    Hol e

1m, 0.99m, an

/t,  respectivel

5 and LM6, as 

lead, with on

urned  a  4.51

ent.  LM66W 

00m  below  th

explored area

ncluding  LM6

St. 

he 

at 

nd 

ed 

on 

nd 

ed 

rill 

his 

E, 

1, 

ed 

el 

ne 

e, 

ed 

er 

es 

nd 

y.  

a 

ly 

m 

is 

he 

as.  

1, 

2 

Highlights of selected drill hole intersections: 

 Hole ZKL53S04_4 intersected two major veins: 

o A 2.46m interval (2.02m true width) of vein LM6 grading 1,328 g rams per tonne (“g/t”) 

silver  (“Ag”),  0.76%  lead  (“Pb”),  0.64%  zinc  (“Zn”),  0.12  g/t  gold  (“Au”),  and  0.11% 

copper  (“Cu”),  which  includes  a  0.45m  interval  (0.37m  true  width)  grading  7,131 g/t 

Ag, 3.35% Pb, 3.23% Zn, 0.42 g/t Au, and 0.55% Cu; and 

o A 0.75m interval (0.71m true width) of vein LM5E1 grading 495 g /t Ag, 3.88% Pb, 0.48% 

Zn, 0.19 g/t Au and 0.10% Cu. 

 Hole ZKL5202SC intersected a 0.92m interval (0.91m true width) of vein LM5 gr ading 6,455 

g/t Ag, 5.28% Pb, 1.19% Zn, 10.00 g/t Au and 0.29% Cu.  

 Hole  ZKL51A21_1 inters ect ed a 2.3 0m in terval (2.04 m  true width)  o f  vein LM5E 1  grading 

535 g/t Ag, 2.76% Pb, 0.55% Zn and 0.32% Cu, which includes a 1 .05m interval (0.93m true 

width) grading 1,004 g/t Ag, 5.75% Pb, 1.08% Zn and 0.65% Cu. 

 Hole ZKL53S04_1 intersected two major intersections: 

o A 0.56m interval (0.53m true width) of vein LM6E grading 692 g/ t  Ag,  0.11%  Pb  and 

0.09% Zn; and 

o A 6.08m interval (5.72m true width) of vein LM4E2 grading 375 g /t Ag, 1.61% Pb, 0.55% 

Zn and 0.09 g/t Au, which includes a 1.22m interval (1.15m true  width) grading 1,019 

g/t Ag, 1.01% Pb, 0.82% Zn, and 0.26 g/t Au. 

 Hole  ZKL53S04_2  intersected  a  0.87m  interval  (0.85m  true  width)  of  vein  LM4E  grading 

1,643 g/t Ag, 3,19% Pb, 0.25% Zn, and 0.52% Cu.  

In addition to drilling, a total of 4,180m of exploration tunne ls have been developed at the LME mine 

during  the  period.    This  exploration  tunnelling  (comprising  drifting,  cross‐cutting  and  raising)  was 

driven  along  and  across  major  mineralized  vein  structures  to  up grade  the  drill‐defined  mineral 

resources and test for new parallel and splay structures, and are summarized in the following table: 

Major Target Veins

Total

Tunneling

(m)

Channel

Samples

Collected

Drift

Included

(m)

Total Mineralization [1] Exposed by Drifts

Length

(m)

Average True

Width (m)

Ag

(g/t)

Pb

(%)

Zn

(%)

Au

(g/t)

Cu

(%)

LM2, LM4, LM4W, LM5, LM5E,

LM5E1, LM5W, LM6, LM6W,

LM18, LM18E1, LM60

4,180 2,020 1,923 844 0.68 392 1.85 0.50 0.12 0.04

[1] Mineralization is defined by silver equivalent value (AgEq) greater than or equal to 120 g/t at the LME mine. 

 (Formula used for AgEq calculation: AgEq = Ag g/t + 34.17 * (Pb% + Cu%) + 11.92 * Zn% + 79.31 * Au g/t) 

Highlights of selected mineralized zones exposed in the drift tunnels: 

 Drift  Tunnel  PD900‐LM5E‐500‐2_Stope_Ext exposed  mineralization  30m  long  and  0.98m 

w i d e  ( t r u e  w i d t h )  g r a d i n g  8 6 7  g / t  A g ,  2 . 6 9 %  P b ,  1 . 0 7 %  Z n  a n d  0 .2 6 %  C u  w i t h i n  v e i n  

structure LM5E; 

3 

 Drift Tunnel PD900‐LM6E2‐500‐56NYM  exposed mineralization 40m long and 0.45m wide 

(true width) grading 949 g/t Ag, 1.74% Pb, 0.82% Zn, 0.18 g/t A u and 0.18% Cu within vein 

structure LM6E; 

 Drift  Tunnel  PD900‐LM5‐510‐54Nlink  exposed  mineralization  23m  long  and  0.83m  wide 

(true width) grading 761 g/t Ag, 3.72% Pb, and 0.83% Zn within vein structure LM5; 

 Drift  Tunnel  PD900‐LM5‐450‐51SYM  exposed  mineralization  25m  long  and  0.77m  wide 

(true width) grading 700 g/t Ag, 1.89% Pb, and 0.81% Zn within vein structure LM5. 

Table 1:  Selected results from the drill programs at the LME mine 

Hole ID From

(m)

To

(m)

Width

(m)

True

Width

(m)

Ag

(g/t)

Pb

(%)

Zn

(%)

Au

(g/t)

Cu

(%) Veins

ZKL5001SC 14.39 15.03 0.64 0.62 616 2.26 0.39 0.05 0.16 LM5W

ZKL5001SC 22.27 23.18 0.91 0.88 801 3.41 0.38 0.28 0.18 LM5

ZKL5001SC 76.96 78.31 1.35 1.30 150 0.30 0.09 0.10 0.04 LM5E2

including 76.96 77.39 0.43 0.42 396 0.84 0.15 0.20 0.08 LM5E2

ZKL5103_8 16.33 18.21 1.88 1.14 157 0.36 0.13 0.06 0.03 LM5

including 17.89 18.21 0.32 0.19 770 1.28 0.17 0.03 0.09 LM5

ZKL5103_8 77.88 82.28 4.40 2.65 248 0.39 0.40 0.07 0.06 LM5E

including 80.30 82.28 1.98 1.19 527 0.43 0.45 0.09 0.11 LM5E

ZKL5103_9 56.78 58.13 1.35 1.16 225 7.96 0.99 0.32 0.01 LM5E1

including 57.79 58.13 0.34 0.29 808 31.16 3.39 1.11 0.03 LM5E1

ZKL5103_9 65.18 65.63 0.45 0.39 336 2.32 0.18 0.14 0.02 LM5Ea [1]

ZKL5103_10 55.63 56.44 0.81 0.70 264 0.47 0.41 0.02 0.02 LM5E1

ZKL5103_10 63.71 64.20 0.49 0.42 129 1.66 0.67 0.24 0.03 LM5Ea1 [1]

ZKL51A21_1 20.08 22.54 2.46 2.19 279 0.43 0.29 0.12 0.08 LM5

including 20.08 21.35 1.27 1.13 423 0.50 0.38 0.16 0.13 LM5

ZKL51A21_1 39.90 42.20 2.30 2.04 535 2.76 0.55 0.05 0.32 LM5E1

including 41.15 42.20 1.05 0.93 1,004 5.75 1.08 0.05 0.65 LM5E1

ZKL5202SC 21.50 22.42 0.92 0.91 6,455 5.28 1.19 10.00 0.29 LM5

ZKL5202SC 52.83 55.55 2.72 2.68 216 0.45 0.05 0.02 0.05 LM5E

ZKL5202SC 63.30 64.24 0.94 0.92 345 1.30 0.10 0.05 0.04 LM5Ea

ZKL5305_1 139.11 140.30 1.19 0.84 239 1.26 0.42 0.03 0.03 LM6

ZKL5305_1 147.73 148.83 1.10 0.78 84 1.83 0.84 3.31 0.02 LM4E2

ZKL5305_1 205.23 207.57 2.34 1.52 362 4.67 1.08 0.08 0.04 LM5

including 205.23 206.14 0.91 0.59 884 11.83 2.70 0.18 0.11 LM5

ZKL53S04_1 104.44 105.00 0.56 0.53 692 0.11 0.09 0.05 0.02 LM6E

ZKL53S04_1 167.23 173.31 6.08 5.72 375 1.61 0.55 0.09 0.02 LM4E2

including 172.09 173.31 1.22 1.15 1,019 1.01 0.82 0.26 0.03 LM4E2

ZKL53S04_2 75.22 76.09 0.87 0.85 1,643 3.19 0.25 0.03 0.52 LM4E

ZKL53S04_4 111.00 113.46 2.46 2.02 1,328 0.76 0.64 0.12 0.11 LM6

including 111.00 111.45 0.45 0.37 7,131 3.35 3.23 0.42 0.55 LM6

ZKL53S04_4 235.92 236.67 0.75 0.71 495 3.88 0.48 0.19 0.10 LM5E1

ZKL58T1703 231.09 232.32 0.81 0.79 198 4.90 0.85 0.19 0.02 T17E

ZKL58T1703 363.71 364.70 0.99 0.64 43 0.50 0.71 4.94 0.01 LM4E2

ZKL6713 347.95 352.16 4.21 3.11 1 0.01 0.01 4.53 0.07 LM66W [1]

including 349.33 350.78 1.45 1.07 1 0.01 0.01 9.80 0.09 LM66W

ZKL7114 612.06 615.28 3.22 2.71 84 1.27 0.52 0.05 0.01 LM66E [1]

including 614.87 615.28 0.41 0.35 416 2.91 1.49 0.05 0.02 LM66E

ZKLDB2101 158.70 162.01 3.31 2.99 30 1.15 0.02 4.57 0.01 LM4E2

including 160.32 162.01 1.69 1.53 14 0.03 0.02 8.40 0.01 LM4E2

[1] Veins discovered between October 1, 2019 and September 30, 2020

4 

Table 2:  Selected mineralized zones exposed by drift tunnelling at the LME mine 

Tunnel ID Target

Veins

Ore Length

(m)

True Width

(m)

Ag

(g/t)

Pb

(%)

Zn

(%)

Au

(g/t)

Cu

(%)

PD838-LM2-730-3NYM LM2 30.00 0.35 237 3.47 0.63 0.00 0.00

PD838-LM2-730-3SYM LM2 10.00 0.47 237 4.07 0.76 0.00 0.00

PD900-LM4-500-61SYM LM4 30.00 0.36 81 0.97 0.23 0.02 0.02

PD900-LM5-450-51SYM LM5 25.00 0.77 700 1.89 0.81 0.00 0.00

PD900-LM5-450-51NYM LM5 100.00 0.63 511 1.17 0.40 1.33 0.03

PD900-LM5-510-54Slink LM5 12.00 0.51 88 1.09 0.19 0.00 0.00

PD900-LM5-510-54Nlink LM5 23.00 0.83 761 3.72 0.83 0.00 0.02

PD900-LM5-650-70NYM LM5 20.00 0.72 139 2.03 0.95 0.00 0.00

PD900-LM5E-450-51NYM LM5E 45.00 0.78 234 3.11 0.95 0.00 0.00

PD900-LM5E-500-2_Stope_Ext LM5E 30.00 0.98 867 2.69 1.07 0.06 0.26

PD900-LM5E-600-68_Stope_Ext LM5E 10.00 0.74 458 1.90 1.21 0.02 0.10

PD900-LM5E1-450-51NYM LM5E1 25.00 0.49 168 3.01 0.20 0.00 0.00

PD900-LM5E1-450-51SYM LM5E1 30.00 0.35 108 3.79 0.39 0.00 0.00

PD900-LM5W-550-68NYM LM5W 35.00 0.37 266 1.22 0.35 0.00 0.00

PD900-LM5W-650-67SYM LM5W 90.00 0. 66 454 1.04 0.29 0.00 0.00

PD900-LM6-600-69NYM LM6 10.00 0.99 164 0.47 0.29 1.15 0.05

PD900-LM6-650-69NYM LM6 20.00 1.21 460 1.41 0.32 0.02 0.07

PD900-LM6-650-69SYM LM6 50.00 1.03 325 0.98 0.22 0.02 0.04

PD900-LM6-700-68NYM LM6 40.00 1.09 352 1.04 0.17 0.00 0.00

PD900-LM6W-600-70NYM LM6 10.00 0.98 405 1.61 0.27 0.02 0.05

PD900-LM6E2-500-56NYM LM6E 40.00 0.45 949 1.74 0.82 0.18 0.18

PD900-LM18-930-56NYM LM18 10.00 0.58 707 2.29 0.23 0.02 0.10

PD900-LM18-930-56SYM LM18 25.00 0.58 264 3.87 0.60 0.02 0.04

PD900-LM18E1-915-52NYM LM18E1 65.00 0.40 366 1.46 0.90 0.00 0.00

PD900-LM18E1-915-56SYM LM18E1 25.00 1.14 240 0.42 0.06 0.00 0.00

PD838-LM18E1-845-54SYM LM18E1 15.00 0.33 64 2.05 0.16 0.00 0.00

PD838-LM18E1-845-54NYM LM18E1 19.00 0.47 377 1.34 0.42 0.01 0.04

Quality Control  

Drill  cores  are  NQ  size.    Drill  core  samples,  limited  by  appare nt  mineralization  contacts  or 

shear/alteration  contacts,  were  split  into  halves  by  saw  cutting .   T h e  h a l f  c o r e s  a r e  s t o r e d  i n  t h e  

Company's core shacks for future reference and checks, and the  other half core samples are shipped 

in  securely  sealed  bags  to  the  Chengde  Huakan  514  Geology  and  M inerals  Test  and  Research 

Institute in Chengde, Hebei Province, China, 226km northeast of  Beijing, the Zhengzhou Nonferrous 

Exploration  Institute  Lab  in  Zhengzhou,  Henan  Province,  China, and  SGS‐CSTC  Standards  Technical 

Services (Tianjin) Co., Ltd., Tianjin, China.  All the three la bs are ISO9000 certified analytical labs.  For 

analysis,  the  sample  is  dried  and  crushed  to  minus  1mm  and  then  split  to  a  200‐300g  subsample 

which is further pulverized to minus 200 mesh.  Two subsamples  are prepared from the pulverized 

sample.  One is digested with aqua regia for gold analysis with  atomic absorption spectroscopy (AAS), 

and the other is digested with two‐acids for analysis of silver, lead, zinc and copper with AAS. 

Channel samples are collected along sample lines perpendicular  to the mineralized vein structure in 

exploration  tunnels.    Spacing  between  sampling  lines  is  typical l y  5 m  a l o n g  s t r i k e .   B o t h  t h e  

mineralized  vein  and  the  altered  wall  rocks  are  cut  by  continuous  chisel  chipping.    Sample  length 

ranges  from  0.2m  to  more  than  1.0m,  depending  on  the  width  of  the  mineralized  vein  and  the 

mineralization  type.    Channel  samples  are  prepared  and  assayed  w i t h  A A S  a t  S i l v e r c o r p ’ s  m i n e  

laboratory (Ying Lab) located at the mill complex in Luoning County, Henan Province, China.  The Ying 

lab is officially accredited by the Quality and Technology Monitoring Bureau of Henan Province and is 

qualified to provide analytical services.  The channel samples  are dried, crushed and pulverized.  A 

200g sample of minus 160 mesh is prepared for assay.  A duplica te sample of minus 1mm is made 

5 

and kept in the laboratory archives.  Gold is analysed by fire  assay with AAS finish, and silver, lead, 

zinc and copper are assayed by two‐acid digestion with AAS finish. 

A routine quality assurance/qualit y control (QA/QC) procedure i s adopted to monitor the analytical 

quality  at  each  lab.    Certified  reference  materials  (CRMs),  pulp  duplicates  and  blanks  are  inserted 

into each batch of lab samples.  QA/QC data at the lab are atta ched to the assay certificates for each 

batch of samples. 

The Company maintains its own comprehensive QA/QC program to en sure best practices in sample 

preparation  and  analysis  of  the  exploration  samples.    Project  geologists  regularly  insert  CRM,  field 

duplicates  and  blanks  to  each  batch  of  30  core  samples  to  monitor  the  sample  preparation  and 

analysis procedures at the labs.  The analytical quality of the  labs is further evaluated with external 

checks by sending approximately 3‐5% of the pulp samples to hig her level labs to check for lab bias.  

Data  from  both  the  Company's  and  the  labs'  QA/QC  programs  are  re v i e w e d  o n  a  t i m e l y  b a s i s  b y  

project geologists. 

Guoliang Ma, P. Geo., Manager of Exploration and Resource of th e Company, is the Qualified Person 

for  Silvercorp  under  NI  43‐101  and  has  reviewed  and  given  consent  to  the  technical  information 

contained in this news release. 

About Silvercorp  

Silvercorp  is  a  profitable  Canadian  mining  company  producing  si lver,  lead  and  zinc  metals  in 

concentrates from mines in China.  The Company’s goal is to con tinuously create healthy returns to 

shareholders  through  efficient  management,  organic  growth  and  t he  acquisition  of  profitable 

projects.    Silvercorp  balances  profitability,  social  and  enviro nmental  relationships,  employees’ 

wellbeing,  and  sustainable  development.    For  more  information,  p l e a s e  v i s i t  o u r  w e b s i t e  a t  

www.silvercorp.ca.

For further information 

Lon Shaver 

Vice President 

Silvercorp Metals Inc. 

Phone:  (604) 669‐9397 

Toll Free:  1 (888) 224‐1881 

Email:  [email protected]  

Website:  www.silvercorp.ca 

CAUTIONARY DISCLAIMER ‐ FORWARD LOOKING STATEMENTS 

Certain  of  the  statements  and  information  in  this  news  release constitute  “forward‐looking  statements”  within  the 

meaning  of  the  United  States  Private  Securities  Litigation  Reform  Act  of  1995  and  “forward‐looking  information” 

within the meaning of applicable Canadian provincial securities  laws. Any statements or information that express or 

involve  discussions  with  respect  to  predictions,  expectations, beliefs,  plans,  projections,  objectives,  assumptions  or 

future  events  or  performance  (often,  but  not  always,  using  word s  or  phrases  such  as  “expects”,  “is  expected”, 

“anticipates”,  “believes”,  “plans ”,  “projects”,  “estimates”,  “a ssumes”,  “intends”,  “strategies”,  “targets”,  “goals”, 

“forecasts”,  “objectives”,  “budgets”,  “schedules”,  “potential”  or  variations  thereof  or  stating  that  certain  actions, 

events or results “may”, “could”, “would”, “might” or “will” be  taken, occur or be achieved, or the negative of any of 

6 

these terms and similar expression s) are not statements of hist orical fact and may be forward‐looking statements or 

information.  Forward‐looking statements or information relate  to, among other things: the price of silver and other 

metals;  the  accuracy  of  mineral resource  and  mineral  reserve  estimates  at  the  Company’s  material  properties;  the 

sufficiency of the Company’s capital to finance the Company’s o perations; estimates of the Company’s revenues and 

capital expenditures; estimated production from the Company’s m ines in the Ying Mining District; timing of receipt of 

permits  and  regulatory  approvals;  availability  of  funds  from  production  to  finance  the  Company’s  operations;  and 

access to and availability of fund ing for future construction,  use of proceeds from any financing and development of 

the Company’s properties. 

Forward‐looking  statements  or  information  are  subject  to  a  variety  of  known  and  unknown  risks,  uncertainties  and 

other factors that could cause actual events or results to diff er from those reflected in the forward‐looking statements 

or  information,  including,  without  limitation,  social  and  economic impacts of COVID‐19; risks relating to: fluctuating 

commodity  prices;  calculation  of  resources,  reserves  and  minera lization  and  precious  and  base  metal  recovery; 

interpretations  and  assumptions of  mineral  resource  and  mineral  reserve  estimates;  exploration  and  development 

programs; feasibility and engineering reports; permits and licenses; title to properties; property interests; joint venture 

partners;  acquisition  of  commercially  mineable  mineral  rights;  financing;  recent  market  events  and  conditions; 

economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic 

returns  of  future  production;  integration  of  future  acquisitions  into  the  Company’s  existing  operations;  competition; 

operations  and  political  conditi ons;  regulatory  environment  in  China  and  Canada;    environmental  risks;  foreign 

exchange  rate  fluctuations;  insurance;  risks  and  hazards  of  mining  operations;  key  personnel;  conflicts  of  interest; 

dependence on management; internal  control over financial repor ting as per the requireme nts of the Sarbanes‐Oxley 

Act; and bringing actions and enforcing judgments under U.S. securities laws. 

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward‐looking  statements  or 

information. Forward‐looking statements or information are stat ements about the future and are inherently uncertain, 

and  actual  achievements  of  the  Company  or  other  future  events  or  conditions  may  differ  materially  from  those 

reflected in the  forward‐looking statements or information due  to a variety of risks, uncertainties and other factors, 

including,  without  limitation,  those  referred  to  in  the  Company’s  Annual  Information  Form  under  the  heading  “Risk 

Factors”.  Although the Company has attempted to identify impor tant factors that could cause actual results to differ 

materially, there may be other factors that cause results not t o be as anticipated, estimated, described or intended.  

Accordingly, readers should not place undue reliance on forward‐looking statements or information.    

The Company’s forward‐looking statements and information are ba sed on the assumptions, be liefs, expectations and 

opinions of management as of the date of this news release, and  other than as required by applicable securities laws, 

the Company does not assume any obligation to update forward‐lo oking statements and information if circumstances 

or  management’s  assumptions,  beliefs,  expectations  or  opinions  should  change,  or  changes  in  any  other  events 

affecting such statements or information.  For the reasons set  forth above, investors should not place undue reliance 

on forward‐looking statements and information. 

CAUTIONARY NOTE TO US INVESTORS  

This news release has been prepar ed in accordance with the requ irements of NI 43‐101 and the Canadian Institute of  

Mining, Metallurgy and Petroleum Definition Standards, which differ from the requirements of U.S. Securities laws.  NI 

43‐101  is  a  rule  developed  by  t he  Canadian  Securities  Administr ators  that  establishes  standards  for  all  public 

disclosure an issuer makes of scientific and technical information concerning mineral projects.