Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SVM.TO ·

News release

Corporate Updates

NEWS

Tradin

VANC

“Com

explo

Explo

Distric

From 

progr

with s

betwe

major

high  g

veins 

T39E,

drillin

miner

Highli

 D

(

z

 D

(

1

 D

(

9

 D

w

le

S RELEASE 

ng Symbol: T

SILV

T

COUVER, Brit

pany”)  (TSX /

ration  progra

ration drilling

ct. 

April  1,  201

ams  at  the T

six undergrou

een  elevation

r mineralized

grade  minera

were discove

 T39E2 and T

ng  results  fr o

ralized zones 

ights of select

Drift Tunnel  P

true width) g

zinc (“Zn”) wit

Drift  Tunnel P

true  width) g

1050m level a

Drift  Tunnel 

true width)  g

930m level at 

Drift Tunnel  P

width) gradin

evel at the TL

TSX/NYSE Am

VERCORP REP

THE TLP AND 

ish Columbia

/NYSE  Amer i

ams  at  the  T

g is ongoing  a

18  to  Septem

TLP  and  LME 

und rigs from

n  levels  500m

vein structu

alized  zones w

ered in the TL

T17E indicate 

om  veins  LM

to at least th

ted mineraliz

PD890‐T5E1_

grading 1,784

thin vein stru

PD1050‐T26‐1

grading 716  g

at the TLP min

PD930‐T14E‐

grading 430  g

the TLP mine

PD820‐T16‐60

g 719 g/t Ag ,

LP mine; and 

erican: SVM

PORTS POSITI

LME MINES A

a – November

ican:  SVM)  i

LP  and  LME

at the TLP an

mber  30,  201

mines  and c

 current prod

m  and  1,070m

res along stri

within  major 

LP mine durin

the increasin

5,  LM5E  and

e 260m level

ed zones exp

1‐890‐31NYM

 grams per t o

cture T31W3

1050‐A4NYM

g/t  Ag , 9. 05%

ne; 

930‐A0SYM 

g/t Ag, 5.05 %

e; 

00‐1SYM exp

, 5.19% Pb a

IVE EXPLORA

AT THE YING 

r 4, 2019 – Si

s  pleased  t o

mines,  Ying M

d LME mines

19,  Silvercorp

completed  37

duction levels

m.    Results  fr

ke and dow n

production  v

ng this period

ng importance

d L M 4  a t  t h

.  

posed in the d

M exposed m

onne (“g/t”) s

3 on the 890m

M e x p o s e d  m i

% Pb and 0.1 3

exposed  min

 Pb and 0.3 9

osed mineral

nd 0.92% Zn 

ATION RESULT

MINING DIST

lvercorp Met

o  report  th e

Mining  Distri

s, and all oth e

p c o n t i n u e d  

7,212  metres

s, and 33,004

rom  the  drill

ndip, and ex p

vein  structur

.  Among the

e of the NNW

e  LME  min e

drift tunnels:

ineralization

silver (“Ag”), 

m level at the 

neralization

3% Zn withi n

neralization  6

9% Zn within 

lization 80m 

within vein  s

          Silvercorp M

希尔威金属

            Suite 1750 – 1

            Vancouver, B

            Tel:  604‐669‐

            Fax:  604‐669

TS FROM  

TRICT 

tals Inc. ("Silv

e r e s u l t s  o f  

ict,  Henan  Pr

er mines at t h

the  extensiv

s  (“m”)  of  dia

4m of explora

ling  program 

ploration tunn

re s .   E i g h t  ne

em, veins T31

W and NS strik

e e x t e n d e d  t

15m long a n

9.55% lead (“

TLP mine; 

25m  long  an

n ve i n st r uc tu

60m  long  an

vein structur

long and 1.0

structure T16

Metals Inc. 

矿业有限公司

1066 West Hastings 

C, Canada  V6E 3X1

‐9397 

9‐9387 

vercorp” or th

its  2018‐20 1

rovince,  Chin

he Ying Minin

ve  exploratio

amond  drillin

ation tunnelin

extended  th

neling expose

ew  mineralize

W3, T26, T26

king veins.  Th

he  high‐grad

nd 0.44m wi d

“Pb”) and 0.8

nd  1.11m  wid

ur e  T 26 on th

d  1.66m  wid

re T14E on t h

4m wide (tr u

6 on the 600 m

St.

he 

19 

a.  

ng 

on 

ng 

ng 

he 

ed 

ed 

6E, 

he 

de 

de 

81% 

de 

he 

de 

he 

ue 

m 

2 

 Drift Tunnel PD900‐LM18E1‐915‐52NYM  exposed mineralization 60m  long and 0.47m wide 

(true width) grading 1,469 g/t Ag, 2.38% Pb and 0.28% Zn within  vein structure LM18E1 on 

the 915m level at the LME mine.  

The exploration tunneling from April 1, 2018 to September 30, 2 019 at the TLP and LME mines, 

comprising drifting, crosscutting and raising, was driven along  and across major mineralized vein 

structures  to  upgrade  the  drill  defined  mineral  resources  and  test  for  new  parallel  and  splay 

structures, and is summarized in the following table: 

Mine Major Target Veins

Target

Levels

(m)

Total

Tunneling

(m)

Channel

Samples

Collected

Drift

Included

(m)

Total Mineralization Exposed by Drift [1]

Length

(m)

Average True

Width (m)

Ag

(g/t)

Pb

(%)

Zn

(%)

TLP

T1W, T1W1, T5, T11,

T14E, T15W, T16,

T16W, T17, T17E,

T17W, T26, T26E,

T31W3, T33E, T35E,

T39E

510-1070 28,648 10,982 14,404 6,903 0.65 241 3.64 0.41

LME LM4E2, LM5, LM5E,

LM6, LM6W, LM18E1 500-1070 4,356 1,402 2,092 754 0.61 282 2.11 0.38

[1] Mineralization is defined by silver equivalent value (AgEq)  greater than or equal to 120 g/t at the TLP mine and 125 g/t a t the 

LME mine. (Formulae used for AgEq calculation: TLP=36.75*Pb%+Ag g/t; LME=39.019*Pb%+Ag g/t) 

Highlights of selected drill hole intersections: 

 Hole ZKT0641 intersected a 2.73m  interval from 2.12m to 4.85m,  2.00m true width, of vein 

T3E grading 841 g/t Ag, 0.67% Pb and 0.20% Zn at the 1079m elevation at the TLP mine; 

 Hole ZKL7602 intersected a 3.82m interval from 263.75m to 267.5 7m, 2.71m true width, of 

vein  LM6W  grading  491  g/t  Ag,  0.78%  Pb  and  0.16%  Zn  at  the  601m elevation at  the TLP 

mine;  

 Hole ZKX11071 intersected a 1.01m interval from 296.36m to 297. 37m, 0.82m true width, 

of vein T2 grading 471 g/t Ag, 2.84% Pb and 0.33% Zn at the 560 m elevation, and a 1.19m 

interval from 317.55m to 318.74m, 0.97m true width, of vein T3  grading 931 g/t Ag, 0.47% 

Pb and 0.06% Zn at the 546m elevation at the TLP mine; and 

 Hole ZKL6105 intersected a 0.79m interval from 113.98m to 114.7 7m, 0.53m true width, of 

vein LM4 grading 2,174 g/t Ag, 0.95% Pb and 0.25% Zn at the 497 m elevation, and a 0.45m 

interval  from  289.80m  to  290.25m,  0.32m  true  width,  of  vein  LM5  grading  2,217  g/t  Ag, 

2.90% Pb and 0.91% Zn at the 333m elevation at the LME mine. 

The  underground  drilling  program  is  conducted  mainly  from  the  current  production  levels  to 

delineate the downdip and along‐strike extensions of known mine ralized vein structures in the 

production area and test for new vein structures in the previously less explored areas.  

The drilling programs from April 1, 2018 to September 30, 2019  at the TLP and LME mines are 

summarized in the following table: 

3 

Mine Major Target Veins

Target

Elevation

(m)

Metres

Drilled

(m)

Holes

Completed

Samples

Collected

Holes

Intercepted

Vein Structures

Holes

Intercepted

ore

TLP

T2, T2W, T3, T3E, T5,

T5E, T5E2, T11, T14E,

T15W, T16E, T22, LM5,

LM6, LM6W

214-1,111 25,170 92 1,676 86 39

LME

LM4, LM5, LM5E,

LM5E1, LM6E, LM6E1,

T11, T17, T17E, T17E1,

T17W1

270-1,000 12,041 34 852 32 17

Tables 1 and 2 below list the assay results of certain minerali zed zones exposed in drift tunnels 

and selected mineralized drill hole intersections from the exploration programs. 

Table 1: Selected mineralized zones exposed by drift tunneling at the TLP and LME mines 

Mine Tunnel ID

Target Level Length True

Width

(m)

Ag Pb Zn

Vein (m) (m) (g/t) (%) (%)

TLP PD820-T11-700-4NYM T11 700 120.0 0.78 317 5.09 0.57

TLP PD820-T11-600-1SYM T11 600 90.0 1.21 236 7.70 0.76

TLP PD930-T14E-930-A0SYM T14E 930 60.0 1.66 430 5.05 0.39

TLP PD890-T14E-890-21SYM T14E 890 125.0 0.83 444 3.31 0.40

TLP PD820-T14E-755-3SYM T14E 755 20.0 0.67 103 8.99 0.16

TLP PD820-T15W-650-4SYM T15W 650 35.0 0.57 191 6.77 0.44

TLP PD820-T15W-650-4NYM T15W 650 80.0 1.01 175 10.18 0.33

TLP PD846-T16E-846-7NYM T16 846 35.0 1.10 695 1.23 0.37

TLP PD820XPD-T16W-755-23SYM T16 755 35.0 0.39 669 1.81 2.31

TLP PD820-T16-700-12SYM T16 700 45.0 0.57 679 3.84 1.03

TLP PD820XPD-T16-700-15NYM T16 700 60.0 0.41 785 2.12 2.61

TLP PD820-T16-600-1SYM T16 600 80.0 1.04 719 5.19 0.92

TLP PD846-T16W-846-12SYM T16W 846 105.0 0.42 972 1.25 0.72

TLP PD820-T17W-700-14SYM T16W 700 41.0 0.77 279 4.12 0.37

TLP PD846-T17-846-16NYM T17 846 125.0 0.49 353 3.17 0.47

TLP PD846-T17-846-16SYM T17 846 117.5 0.80 321 3.40 0.83

TLP PD820-T17-700-14NYM T17 700 35.0 1.03 375 4.29 0.39

TLP PD820-T17-700-14SYM T17 700 24.0 0.51 288 5.06 0.10

TLP PD846-T17E-846-16NYM T17E [1] 846 55.0 0.52 412 5.19 0.46

TLP PD820-T17-650-4SYM T17W 650 70.0 0.68 608 1.90 0.93

TLP PD820-T17W-600-1NYM T17W 600 15.0 0.46 976 4.49 0.37

TLP PD960-T1W-990-4NYM T1W 990 35.0 0.71 837 2.62 0.48

TLP PD1070-T1W1-1070-4SYM T1W1 1070 25.0 1.19 304 2.91 0.11

TLP PD1070-T22W-1070-6SYM T22W 1070 30.0 0.49 501 2.31 0.07

TLP PD1050-T26-1050-A4NYM T26 [1] 1050 25.0 1.11 716 9.05 0.13

TLP PD960-T26-990-A6NYM T26 [1] 990 35.0 1.25 312 2.97 0.05

TLP PD840-T26E-840-1SYM T26E [1] 840 20.3 0.52 302 5.50 0.09

TLP PD890-T5E1支-890-31NYM T31W3 [1] 890 15.0 0.44 1,784 9.55 0.81

TLP PD730-T31W-730-A25NYM T31W3 [1] 730 45.0 0.45 209 8.61 0.34

4 

TLP PD730-T33E-560-23NYM T33E 560 90.0 0.52 361 2.18 0.59

TLP PD960-T35E-960-5NYM T35E 960 40.0 0.40 712 2.64 0.79

TLP PD820XPD-T39E-700-15SYM T39E [1] 700 29.0 0.56 478 4.12 0.68

TLP PD820XPD-T39E2-755-27SYM T39E2 [1] 755 110.0 0.52 340 5.09 2.02

TLP PD960-T5-990-11NYM T5 990 32.0 1.10 145 8.03 0.10

TLP PD840-T5E1-840-29NYM T5E1 840 60.0 0.52 395 2.45 0.55

TLP PD840-T5E1-840-29SYM T5E1 840 25.0 0.77 481 2.80 0.51

TLP PD1050-T5W-1050-5SYM T5W 1050 35.0 0.60 274 4.84 0.08

TLP PD1050-T5W1-1050-5NYM T5W1 [1] 1050 35.0 0.44 410 2.85 0.17

LME PD900-LM18E1-915-52NYM LM18E1 [1] 915 60.0 0.47 1,469 2.38 0.28

LME PD900-LM18E1-915-52SYM LM18E1 [1] 915 35.0 0.80 428 3.65 0.32

LME PD900-LM5-600-64NYM LM5 600 25.0 0.39 258 1.81 0.56

LME PD900-LM5-600-69SYM LM5 600 40.0 1.13 235 1.38 0.27

LME PD900-LM6W-650-70SYM LM6W 650 40.0 0.48 335 1.12 0.36

[1] Veins discovered between April 30, 2018 and September 30, 2019

Table 2: Selected results from the drill programs at the TLP and LME mines 

Mine Hole ID From

(m)

To

(m)

Elevation

(m)

Width

(m)

True

Width (m)

Ag

(g/t)

Pb

(%)

Zn

(%) Vein

TLP ZKT1331 321.18 321.98 723.19 0.80 0.69 437 2.16 0.17 T15W

359.98 360.31 708.65 0.33 0.28 449 1.85 0.59 T11

TLP ZKX11674 387.97 388.40 458.67 0.43 0.34 18 5.52 0.49 T2

TLP ZKGA3201 206.00 206.40 766.52 0.40 0.36 593 0.16 0.36 T22

TLP ZKT1332 333.31 333.72 641.11 0.41 0.36 56 2.39 0.10 T15W

360.77 361.99 626.24 1.22 1.06 99 10.89 0.28 T11

TLP ZKGA2801 267.80 268.93 757.27 1.13 1.09 414 1.61 0.35 T22

TLP ZKGA2401 155.08 155.48 735.18 0.40 0.39 112 5.32 0.14 T22-1

TLP ZKX11071 296.36 297.37 559.68 1.01 0.82 471 2.84 0.33 T2

317.55 318.74 545.71 1.19 0.97 931 0.47 0.06 T3

TLP ZKTA4011 140.81 143.32 921.34 2.51 1.46 230 6.99 1.51 T14E

TLP ZKTA4012 95.11 98.29 772.65 3.18 1.84 115 13.04 0.33 T14E

TLP ZKT0641 2.12 4.85 1,079.32 2.73 2.00 841 0.67 0.20 T3E

161.21 161.82 1,054.43 0.61 0.42 291 1.58 0.28 T22E

TLP ZKT1136 423.98 424.27 509.53 0.29 0.27 454 0.21 0.18 T11

TLP ZKT1042 6.20 8.16 1,074.50 1.96 1.71 142 0.68 0.05 T3E

TLP ZKT0441 6.14 6.48 1,077.38 0.34 0.16 1,451 1.14 0.76 T3E

152.27 152.96 1,034.66 0.69 0.33 360 0.59 0.10 T5

TLP ZKT0842 104.48 107.05 1,111.22 2.57 1.48 86 4.36 0.31 T5

TLP ZKT0940 90.61 92.15 780.69 1.54 1.30 124 0.42 0.10 T14E

303.01 303.47 638.21 0.46 0.40 254 0.39 0.23 T14

TLP ZKL7602 263.75 267.57 601.25 3.82 2.71 491 0.78 0.16 LM6W

269.42 272.65 596.47 3.23 2.29 180 0.45 0.11 LM6

517.68 519.11 389.15 1.43 1.02 119 1.38 0.33 LM5

572.14 572.84 343.87 0.70 0.50 251 2.28 0.70 LM5E1

576.89 577.23 339.92 0.34 0.24 601 0.92 0.52 LM5E2

TLP ZKT1043 88.79 90.49 1,057.12 1.70 1.15 59 6.16 0.46 T2W

TLP ZKL7604 251.93 252.37 735.17 0.44 0.36 317 0.16 0.39 LM6

5 

TLP ZKT2527 122.44 124.14 734.90 1.70 0.94 31 6.21 0.09 T33W3 [1]

TLP ZKT0135 86.52 86.87 936.71 0.35 0.28 1,286 0.79 2.73 T16E

TLP ZKT0135 118.13 118.84 929.60 0.71 0.58 541 1.19 0.28 T16E1

TLP ZKT0333 91.82 92.18 914.10 0.36 0.14 1,237 1.36 0.27 T16E

TLP ZKT1633 63.12 63.96 929.89 0.84 0.83 133 5.54 0.74 T15W

TLP ZKT1633 89.17 89.50 918.06 0.33 0.33 244 4.08 7.92 T15

TLP ZKT1632 223.96 224.31 987.46 0.35 0.33 290 1.70 4.00 T17

TLP ZKT1432 220.81 222.55 1,006.17 1.74 1.61 108 1.66 0.84 T17

TLP ZKG0123 85.25 85.57 617.24 0.32 0.30 229 8.41 0.26 T15W4

181.33 181.64 579.70 0.31 0.28 34 5.61 1.86 T16

263.97 264.60 547.41 0.63 0.58 73 25.13 0.48 T15W

286.28 287.08 538.69 0.80 0.74 76 29.71 0.30 T11

TLP ZKT3724 308.40 308.85 533.74 0.45 0.34 32 13.66 0.14 T39

TLP ZKG0525 215.64 216.12 549.08 0.48 0.34 119 2.56 2.34 T16E

273.20 273.89 522.05 0.69 0.54 11 6.93 0.21 T15W

318.84 319.34 500.63 0.50 0.38 12 3.60 0.13 T14E

LME ZKL3201 276.43 276.78 679.68 0.35 0.25 56 16.02 0.05 T11

LME ZKL6105 113.98 114.37 496.69 0.79 0.53 2,174 0.95 0.25 LM4

289.80 290.25 332.89 0.45 0.32 2,217 2.90 0.91 LM5

318.78 319.74 306.10 0.96 0.68 244 0.47 0.09 LM5E1

322.53 323.39 302.63 0.86 1.66 528 3.67 1.94 LM5E

LME ZKL6502 94.94 95.98 536.89 1.04 1.25 217 1.95 0.26 LM4

197.35 197.72 467.63 0.37 1.09 452 0.77 0.73 LM5

234.74 235.44 442.66 0.70 0.62 721 1.12 1.28 LM5E

LME ZKL6503 207.25 207.92 426.60 0.67 0.49 204 0.70 0.27 LM6E

281.70 282.10 363.79 0.40 0.29 292 17.63 0.10 LM5E

LME ZKL6302 96.87 97.19 520.94 0.32 0.26 506 2.93 0.16 LM4

LME ZKL5903 231.67 232.15 408.56 0.48 0.38 464 1.24 0.25 LM5

280.38 280.76 367.89 0.38 1.03 602 0.63 0.40 LM5E1

283.07 283.48 365.65 0.41 2.91 590 0.70 0.12 LM5E

LME ZKL54S302 102.43 103.50 773.89 1.07 0.83 509 2.57 2.04 LM3_1

149.88 150.32 739.44 0.44 0.34 179 1.10 0.68 T17E1

158.85 159.70 732.90 0.85 0.65 2,019 1.74 0.58 T17E

355.76 357.17 588.57 1.41 1.09 126 4.95 0.26 T17

369.28 369.58 578.68 0.30 0.23 374 3.88 0.97 T17W1

LME ZKL58T1701 292.69 293.61 636.37 0.92 0.67 2,246 6.59 2.70 LM3_1

302.55 303.00 629.14 0.45 0.33 22 5.46 0.60 LM4

LME ZKL58T1702 138.55 139.88 770.01 1.33 1.07 647 0.47 0.23 T17E

314.73 315.88 661.05 1.15 0.90 120 3.05 0.36 T17

[1] Veins discovered between April 30, 2018 and September 30, 2019

Quality Control  

Drill  cores  are  NQ  size.  Drill  core  samples,  limited  by  apparen t  mineralization  contacts  or 

shear/alteration contacts, were split into halves by saw cuttin g.  The half cores are stored in the 

Company's  core  shacks  for  future  reference  and  checks,  and  the other  half  core  samples  are 

shipped  in  securely‐sealed  bags  to  the  Chengde  Huakan  514  Geology  and  Minerals  Test  and 

Research  Institute  in  Chengde,  Hebei  Province,  China,  226  km  no rtheast  of  Beijing,  the 

6 

Zhengzhou Nonferrous Exploration Institute Lab in Zhengzhou, He nan Province, China, and the 

Analytical Lab of the Inner Mongolia Geological Exploration Bur eau in Hohhot, Inner Mongolia, 

China.  All the three labs are  ISO9000 certified analytical lab s.  For analysis, the  sample is dried 

and crushed to minus 1mm and then split to a 200‐300g subsample  which is further pulverized 

to minus 200 mesh.  Two subsamples  are prepared from the pulver ized sample.  One is digested 

w i t h  a q u a  r e g i a  f o r  g o l d  a n a l y s i s  w i t h  a t o m i c  a b s o r p t i o n  s p e c t roscopy  (AAS),  and  the  other  is 

digested with two‐acids for analysis of silver, lead, zinc and copper with AAS. 

Channel  samples  are  collected  along  sample  lines  perpendicular  to  the  mineralized  vein 

structure  in  exploration  tunnels.    Spacing  between  sampling  lines  is  typically  5m  along  strike.  

Both  the  mineralized  vein  and  the  altered  wall  rocks  are  cut  by  continuous  chisel  chipping.  

Sample length ranges from 0.2m to more than 1m, depending on th e width of the mineralized 

vein  and  the  mineralization  type.    Channel  samples  are  prepared  a n d  a s s a y e d  w i t h  A A S  a t  

Silvercorp’s  mine  laboratory  (Ying  Lab)  located  at  the  mill  complex  in  Luoning  County,  Henan 

Province, China.  The Ying Lab is officially accredited by the  Quality and Technology Monitoring 

Bureau of Henan Province and is qualified to provide analytical  services.  The channel samples 

are dried, crushed and pulverized.  A 200g sample of minus 160  mesh is prepared for assay.  A 

duplicate sample of minus 1mm is made and kept in the laboratory archives.  Gold is analysed by 

f i r e  a s s a y  w i t h  A A S  f i n i s h ,  a n d  s i l v e r ,  l e a d ,  z i n c  a n d  c o p p e r  are  assayed  by  two‐acid  digestion 

with AAS finish. 

A  routine  quality  assurance/quality  control  (QA/QC)  procedure  i s  adopted  to  monitor  the 

analytical quality at each lab.  C ertified reference materials  (CRMs), pulp duplicates and blanks 

are inserted into each batch of  lab samples.  QA/QC data at the  lab are attached to the assay 

certificates for each batch of samples. 

The  Company  maintains  its  own  comprehensive  QA/QC  program  to  ensure  best  practices  in 

sample preparation and analysis of the exploration samples.  Pr oject geologists regularly insert 

CRM,  field  duplicates  and  blanks  to  each  batch  of  30  core  sampl es  to  monitor  the  sample 

preparation  and  analysis  procedure s  a t  t h e  l a b s .   T h e  a n a l y t i c al  quality  of  the  labs  is  further 

evaluated  with  external  checks  by  sending  approximately  3‐5%  of  the  pulp  samples  to  higher 

level labs to check for lab bias. 

Data from both the Company's and the labs' QA/QC programs are r eviewed on a timely basis by 

project geologists. 

Guoliang  Ma,  P.  Geo.,  Manager  of  Exploration  and  Resource  of  the  Company,  is  the  Qualified 

Person  for  Silvercorp  under  NI  43‐101  and  has  reviewed  and  given  consent  to  the  technical 

information contained in this news release. 

About Silvercorp  

Silvercorp  is  a  profitable  Canadian  mining  company  producing  silver,  lead  and  zinc  metals  in 

concentrates from mines in China.  The Company’s goal is to continuously create healthy returns 

to shareholders through efficient management, organic growth an d the acquisition of profitable 

projects.    Silvercorp  balances  profitability,  social  and  environmental  relationships,  employees’ 

wellbeing,  and  sustainable  development.    For  more  information,  p l e a s e  v i s i t  o u r  w e b s i t e  a t  

www.silvercorp.ca.

7 

For further information 

Lon Shaver   

Vice President 

Silvercorp Metals Inc. 

Phone: (604) 669‐9397 

Toll Free: 1(888) 224‐1881 

Email: [email protected]  

Website: www.silvercorpmetals.com  

CAUTIONARY DISCLAIMER ‐ FORWARD LOOKING STATEMENTS 

Certain  of  the  statements  and  information  in  this  news  release constitute  “forward‐looking  statements” 

within  the  meaning  of  the  United  States  Private  Securities  Litig a t i o n  R e f o r m  A c t  o f  1 9 9 5  a n d  “ f o r w a r d ‐

looking information” within the meaning of applicable Canadian provincial securities laws. Any statements 

or information that express or involve discussions with respect  to predictions, expectations, beliefs, plans, 

projections, objectives, assumptions or future events or perfor mance (often, but not always, using words 

or  phrases  such  as  “expects”,  “is  expected”,  “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”, 

“assumes”,  “intends”,  “strategies”,  “targets”,  “goals”,  “forecasts”,  “objectives”,  “budgets”,  “schedules”, 

“potential” or variations thereof or stating that certain actio ns, events or results “may”, “could”, “would”, 

“might”  or  “will”  be  taken,  occur  or  be  achieved,  or  the  negative  of  any  of  these  terms  and  similar 

expressions) are not statements of historical fact and may be f orward‐looking statements or information.  

Forward‐looking  statements  or  information  relate  to,  among  other  things:  the  price  of  silver  and  other 

metals;  the  accuracy  of  mineral  resource  and  mineral  reserve  es timates  at  the  Company’s  material 

properties; the sufficiency of the Company’s capital to finance  the Company’s operations; estimates of the 

Company’s  revenues  and  capital  expenditures;  estimated  production  from  the  Company’s  mines  in  the 

Ying  Mining  District;  timing  of  receipt  of  permits  and  regulatory  approvals;  availability  of  funds  from 

production  to  finance  the  Company’s  operations;  and  access  to  and  availability  of  funding  for  future 

construction, use of proceeds from any financing and development of the Company’s properties. 

Forward‐looking  statements  or  information  are  subject  to  a  vari ety  of  known  and  unknown  risks, 

uncertainties and other factors that could cause actual events  or results to differ from those reflected in 

the forward‐looking statements o r information, including, witho ut limitation, risks relating to: fluctuating 

c o m m o d i t y  p r i c e s ;  c a l c u l a t i o n  o f  r e s o u r c e s ,  r e s e r v e s  a n d  m i n e r alization  and  precious  and  base  metal 

recovery; interpretations and assumptions of mineral resource a nd mineral reserve estimates; exploration 

and  development  programs;  feasibility and  engineering  reports; permits  and  licenses;  title  to properties; 

property interests;  joint venture partners; acquisition of com mercially mineable mineral rights; financing; 

recent market events and conditions; economic factors affecting  the Company; timing, estimated amount, 

capital  and  operating  expenditures  and  economic  returns  of  futu re  production;  integration  of  future 

acquisitions  into  the  Company’s  existing  operations;    competition;    operations  and  political  conditions; 

regulatory  environment  in  China  and  Canada;    environmental  risks;  foreign  exchange  rate  fluctuations; 

insurance;  risks  and  hazards  of mining  operations;  key  personnel;  conflicts  of  interest;  dependence  on 

management; internal control over financial reporting as per th e requirements of the Sarbanes‐Oxley Act; 

and bringing actions and enforcing judgments under U.S. securities laws. 

This list is not exhaustive of the factors that may affect any  of the Company’s forward‐looking statements 

or  information.  Forward‐looking  statements  or  information  are  s tatements  about  the  future  and  are 

inherently uncertain, and actual achievements of the Company or  other future events or conditions may 

differ materially from those refl ected in the forward‐looking s tatements or information due to a variety of 

risks,  uncertainties  and  other  factors,  including,  without  limitation,  those  referred  to  in  the  Company’s 

Annual Information Form for the year ended March 31, 2017 under  the heading “Risk Factors”.  Although 

8 

the  Company  has  attempted  to  identify  important  factors  that  co uld  cause  actual  results  to  differ 

materially, there may be other factors that cause results not t o be as anticipated, estimated, described or 

intended.    Accordingly,  readers  s hould  not  place  undue  reliance   on  forward‐looking  statements  or 

information.    

The  Company’s  forward‐looking  statements  and  information  are  ba sed  on  the  assumptions,  beliefs, 

expectations and opinions of management as of the date of this  news release, and other than as required 

by  applicable  securities  laws,  the  Company  does  not  assume  any obligation  to  update  forward‐looking 

statements  and  information  if  circumstances  or  management’s  ass umptions,  beliefs,  expectations  or 

opinions should change, or changes in any other events affectin g such statements or information. For the 

reasons  set  forth  above,  investors  should  not  place  undue  reliance  on  forward‐looking  statements  and 

information.