Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SVM.TO ·

ISCAL YEAR 20 Sales of $48.1 Sold approxim up by 17%, 25 16.9 million p compared to concentrate w

Financials

NEW

Trad

VANC

“Com

quart

Q2 F

FINA

Net  i

$0.05

2017

1 Non

WS RELEASE 

ing Symbol: 

SILV

COUVER,  Brit

mpany”) (TSX: 

ter ended Sep

ISCAL YEAR 20

Sales of $48.1

Sold approxim

up by 17%, 25

16.9 million p

compared  to

concentrate w

pounds of lea

as at June 30,

Gross profit m

to lower met

Net income a

income  attrib

quarter;  

Cash  flow  fro

quarter;   

Cash  cost  pe

$5.16 in the 

of $2.54, com

Paid $1.1 mil

compared to 

Ended the qu

increase of $9

ANCIALS 

income  attrib

5 per share, co

7 (“Q2 Fiscal 20

n IFRS measure, 

TSX: SVM 

NYSE AMER

ERCORP REPO

AND CA

tish  Columbia

SVM) (NYSE A

ptember 30, 20

019 HIGHLIGH

1 million, up 1

mately 1.9 mil

5%, and 15%, 

pounds of lead

o  5.6  million 

were 3,732 to

ad), a decreas

, 2018;  

margin of 47%

al prices;  

attributable to

butable  to  eq

om  operation

r  ounce  of  sil

prior year qua

mpared to $2.2

lion withhold

$nil in the pri

uarter with $1

9.1 million or 

butable  to  eq

ompared to $

018”).   

 please refer to

ICAN: SVM

ORTS Q2 NET

ASH FLOW FRO

a  –  Novembe

American: SVM

018 (“Q2 Fis

HTS   

1% compared t

llion ounces o

respectively, 

d in the prior y

pounds  in  th

onnes (contain

e of 34%, com

% compared to

o equity share

quity  sharehol

ns  of  $21.0  m

lver1,  net  of  b

arter; All‐in su

26 in the prior

ing tax at 10%

ior year quarte

123.9 million i

8% compared

uity  sharehol

11.1 million, o

 section 10 of th

1

T INCOME OF

OM OPERATI

er  7,  2018  –

M) reported it

cal 2019”).  A

to $47.5 millio

f silver, 1,000 

compared to 

year quarter w

e  prior  year 

ning approxim

mpared to 5,65

o 54% in the p

eholders of $8

lders  of  $11.1

million,  up  1%

by‐product  cre

ustaining cost 

r year quarter;

% rate for divi

er; and,

in cash and ca

d to $114.8 mi

ders  of  the  C

or $0.07 per s

he correspondin

$8.0 MILLION

ONS OF $21.0

–  Silvercorp 

ts financial an

ll amounts are

on in the prior

ounces of go

1.6 million ou

while zinc sold

quarter.  The 

ately 0.4 milli

50 tonnes of s

prior year quar

8.0 million, or 

1  million,  or  $

%  compared  t

edits,  of  nega

per ounce of

; 

idend distribu

ash equivalent

llion as at Jun

Company in Q

share in the th

ng MD&A for re

N, $0.05 PER S

0 MILLION  

Metals  Inc. 

d operating re

e expressed in

r year quarter

ld, and 19.4 m

unces of silver

d was 4.9 milli

ending  inven

on ounces of 

silver‐lead con

rter, with the 

$0.05 per sha

$0.07  per  sha

o  $20.7  millio

ative  $3.37,  co

f silver1, net o

uted out of Ch

ts and short‐t

e 30, 2018. 

Q2 Fiscal 2019 

hree months e

econciliation 

SHARE,  

(“Silvercorp” 

esults for the 

n US Dollars. 

;  

million pounds

r, 800 ounces 

ion pounds, d

ntories  of  silv

silver and 4.3

ncentrate inve

decrease mai

are, compared

are  in  the  pri

on  in  the  pri

ompared  to  n

of by‐product 

hina to the Co

term investme

 was $8.0 mil

ended Septem

or  the 

second 

 of lead, 

of gold, 

own 12% 

ver‐lead 

 million 

entories 

nly due 

d to net 

or  year 

or  year 

negative 

credits, 

mpany, 

ents, an 

llion, or 

mber 30, 

2

Sales in Q2 Fiscal 2019 were $48.1 million, up 1% compared to $47.5 million in Q2 Fiscal 2018. Silver and 

gold sales represented $23.4 million and $1.0 million, respectively, while base metals represented $23.6 

million  of  total  sales,  compared  to  silver,  gold  and  base  metals  sales  of  $22.6  million,  $0.9  million,  and 

$24.1 million, respectively, in Q2 Fiscal 2018.  

The Company’s financial results in Q2 Fiscal 2019 were mainly impacted by i) a decrease of 11%, 4%, 8%, 

and  18%  in  the  realized  selling  prices  for  silver,  gold,  lead  and  zinc,  respectively  compared  to  Q2  Fiscal 

2018, and ii) an increase of 17% and 15% of silver and lead sold.       

Cost of sales in Q2 Fiscal 2019 was $25.4 million compared to $21.9 million in Q2 Fiscal 2018.  The cost of 

sales  included  $18.2  million  (Q2  Fiscal  2018 ‐  $16.2  million)  cash  production  costs,  $1.4  million  mineral 

resources tax (Q2 Fiscal 2018 ‐  $1.3 million), and $5.8 million (Q2 Fiscal 2018 ‐  $4.4 million) depreciation 

and  amortization  charges.  The  increase  in  cash  production  costs  and  depreciation  and  amortization 

charges  was  mainly  due  to  more  metals  sold  in  the  current  quarter  while  the  increase  in  mineral 

resources tax was due to higher sales achieved in Q2 Fiscal 2019. The cash production costs expensed in 

cost of sales represent approximately 275,000 tonnes of ore processed and expensed at costs of $66.33 

per tonne (Q2 Fiscal 2018 – approximately 246,600 tonnes at $65.61 per tonne) 

Gross  profit  margin  in  Q2 Fiscal  2019  was  47%,  compared  to  54%  in  Q2  Fiscal  2018,  with  the  decrease 

mainly  due  to  the  decrease  in  metal  selling  prices.  Ying  Mining  District’s  gross  profit  margin  was  50% 

compared to 56% in Q2 Fiscal 2018. GC Mine’s gross profit margin was 29% compared to 40% in Q2 Fiscal 

2018.  

General and administrative expenses in Q2 Fiscal 2019 were $4.6 million, a slight increase compared to 

$4.5 million in Q2 Fiscal 2018. Excluding non‐cash share‐based compensation and amortization expense, 

general and administrative expenses in Q2 Fiscal 2019 were $3.9 million, comparable to $3.9 million in Q2 

Fiscal 2018. 

Income tax expenses in Q2 Fiscal 2019 were $5.8 million compared to $5.3 million in Q2 Fiscal 2018.  The 

income tax expense recorded in Q2 Fiscal 2019 included current income tax expense of $5.1 million (Q2 

Fiscal 2018 – $4.5 million) and deferred income tax expense of $0.7 million (Q2 Fiscal 2018 – $1.0 million). 

The current income tax expenses include $1.1 million withholding tax (Q2 Fiscal 2018 –$nil), being 10% of 

the dividends distributed out of China to the Company by the Company’s Chinese subsidiaries. 

Cash  flows  provided  by  operating  activities  in  Q2  Fiscal  2019  were  $21.0  million,  a  slight  increase 

compared to $20.7 million in Q2 Fiscal 2018.   

For  the  six  months  ended  September  30,  2018,  net  income  attributable  to  equity  shareholders  of  the 

Company was $19.0 million or $0.11 per share, an effective  increase of $1.2 million or 7% over the same 

prior year period, which was $17.8 million or $0.10 per share after excluding a one‐time gain on the sale 

of a Net Smelter Royalty, which increased the actual net income to shareholders to $22.1 million or $0.13 

per share in the same prior year period; sales were $93.2 million, up 7% from $87.2 million in the same 

prior year period; and cash flows from operating activities were $42.2 million, up 12% from $37.6 million 

in the same prior year period.  

The  Company  ended  the  period  with  $123.9  million  in  cash  and  short‐term  investments,  an  increase  of 

$9.1 million or 8% compared to $114.8 million as at June 30, 2018. 

Working capital as at September 30, 2018 was $98.7 million, an increase of $4.5 million or 5%, compared 

to $94.2 million working capital as at June 30, 2018. 

OPERATIONS AND DEVELOPMENT  

(i) Q2 Fiscal 2019 vs. Q2 Fiscal 2018 

In Q1 Fiscal 2019, on a consolidated basis, the Company mined 248,419 tonnes of ore, an increase of 4% 

or 9,313 tonnes,  compared  to 239,106  tonnes in Q2 Fiscal  2018.   Ore mined  at  the Ying  Mining District 

increased by 4% or 7,368 tonnes, and ore mined at the GC Mine increased by 3% or 1,945 tonnes.   Ore 

milled were 239,728 tonnes, up 1% compared to 237,594 tonnes of ore milled in Q2 Fiscal 2018. Ending 

3

stockpiled  ore  inventory  as  at  September  30,  2018  was  21,362  tonnes,  up  75%  compared  to  12,234 

tonnes as at March 31, 2018. 

In Q2 Fiscal 2019, the Company sold approximately 1.9 million ounces of silver, 1,000 ounces of gold, and 

19.4 million pounds  of lead,  up  by  17%, 25%,  and 15%,  respectively,  compared to  1.6 million ounces  of 

silver,  800  ounces  of  gold,  16.9  million  pounds  of  lead  in  Q2  Fiscal  2018  while  zinc  sold  was  4.9  million 

pounds,  down  12%  compared  to  5.6  million  pounds  in  Q2  Fiscal  2018.  As  at  September  30,  2018, 

inventories  of  silver‐lead  concentrate  were  3,732  tonnes  and  zinc  concentrate  inventories  were  598 

tonnes,  compared  to  inventories  of  4,070  tonnes  of  silver‐lead  concentrate  and  370  tonnes  of  zinc 

concentrate as at March 31, 2018. 

In Q2 Fiscal 2019, the consolidated total mining costs and cash mining costs were $72.71 and $53.90 per 

tonne, compared to $70.58 and $52.77 per tonne, respectively, in Q2 Fiscal 2018.  The 2% increase in the 

cash mining costs per tonne comparing to Q2 Fiscal 2018 was mainly due to more tunnelling expensed at 

the GC Mine in the current quarter.  The consolidated total milling costs and cash milling costs in Q2 Fiscal 

2019  were  $11.60  and  $9.36  per  tonne,  down  7%  and  8%  compared  to  $12.44  and  $10.14  per  tonne, 

respectively, in Q2 Fiscal 2018.  

Correspondingly, the consolidated total and cash production costs per tonne of ore processed in Q2 Fiscal 

2019 increased slightly by 2% and 1% to $87.38 and $66.33, respectively, from $85.72 and $65.61 in Q2 

Fiscal 2018, but the consolidated cash production costs per tonne is 6% lower than the annual guidance of 

$70.20.  

In Q2  Fiscal 2019, the consolidated total production costs and cash costs per ounce of silver, net  of  by‐

product credits, were negative $0.34 and negative $3.37 compared to negative $2.43 and negative $5.16 

respectively in Q2 Fiscal 2018.  The increase in the cash cost per ounce of silver, net of by‐product credits, 

is mainly due to a 14% decrease in by‐product credits per ounce of silver, mainly arising from 8% and 18% 

decrease  in  the  realized  lead  and  zinc  selling  price.   Sales  from  lead  and  zinc  accounted  for  48%  of  the 

total sales and amounted to $23.2 million, a decrease of $0.7 million, compared to $23.9 million in the Q2 

Fiscal 2018.    

The consolidated all‐in sustaining cost per ounce of silver, net of by‐product credits is $2.54 compared to 

$2.26 in Q2 Fiscal 2018.   

(ii) Six months ended September 30, 2018 vs. Six months ended September 30, 2017 

For  the  six  months  ended  September  30,  2018,  on  a  consolidated  basis,  the  Company  mined  485,117 

tonnes of ore, an increase of 4% or 20,739 tonnes, compared to 464,378 tonnes mined in the same prior 

year  period.  In  the  same  comparative  period,  ore  milled  increased  2%  to  477,468  tonnes  compared  to 

468,496 tonnes. 

For  the  six  months  ended  September  30,  2018,  the  Company  sold  approximately  3.4  million  ounces  of 

silver, 1,700 ounces of gold, 34.3 million pounds of lead, and 11.3 million pounds of zinc, compared to 3.1 

million ounces of silver, 1,700 ounces of gold, 32.8 million of lead, and 10.6 million pounds of zinc sold in 

the same prior year period. 

The consolidated total mining and cash mining costs were $74.40 and $55.05 per tonne, an increase of 7% 

and 7%, compared to $69.39 and $51.57 per tonne in the same prior year period while the consolidated 

total milling cost and cash milling cost were $12.87 and $10.54, an increase of 3% and 4%, respectively, 

compared to $12.45 and $10.13 per tonne in the same prior year period.  

The consolidated total production costs and cash production costs per tonne of ore processed for the six 

months  ended  September  30,  2018  were  $90.23  and  $68.55,  an  increase  of  7%  and  6%,  respectively, 

compared to $84.62 and $64.48 in the same prior year period, but the consolidated cash production costs 

per tonne is 2% lower than the annual guidance of $70.20. 

The consolidated cash production costs and all‐in sustaining costs per ounce of silver, net of by‐product 

credits, were negative $5.18 and $1.61 compared to negative $4.51 and $3.44, respectively, in the same 

prior year period.  

4

1. Ying Mining District, Henan Province, China  

Q2 Fiscal 2019 vs. Q2 Fiscal 2018 

In Q2 Fiscal 2019, the total ore mined at the Ying Mining District was 180,662 tonnes, an increase of 4% or 

7,368 tonnes, compared to 173,294 tonnes mined in Q2 Fiscal 2018.   Ore milled was 172,200 tonnes, a 

decrease of 1% or 1,746 tonnes compared to 173, 946 tonnes in Q2 Fiscal 2018. As at September 30, 2018, 

stockpile  ore  at  the  Ying  Mining  District  was  19,269  tonnes,  an  increase  of  10,742  tonnes  compared  to 

8,257 tonnes as at March 31, 2018.  

Head grades of ore milled at the Ying Mining District in Q2 Fiscal 2019 were 308 grams per tonne (“g/t”) 

for silver, 4.6% for lead, and 0.9% for zinc, compared to 294 g/t for silver, 4.3% for lead and 0.8% for zinc 

in Q2 Fiscal 2018. The Company continues to achieve good dilution control using its “Enterprise Blog” to 

assist and manage daily operations.     

In  Q2  Fiscal  2019,  the  Ying  Mining  District  sold  approximately  1.8  million  ounces  silver,  17.4  million 

pounds lead, and 1.6 million pounds zinc, compared to 1.5 million ounces silver, 15.3 million pounds lead, 

and  2.3  million  pounds  of  zinc  in  Q2  Fiscal  2018.  As  at  September  30,  2018,  inventories  of  silver‐lead 

concentrate  at  the  Ying  Mining  District  were  3,452  tonnes  and  zinc  concentrate  inventories  were  230 

tonnes,  compared  to  inventories  of  4,050  tonnes  of  silver‐lead  concentrate  and  350  tonnes  of  zinc 

concentrate as at March 31, 2018. 

Total  and  cash  mining  costs  per  tonne  at  the  Ying  Mining  District  in  Q2  Fiscal  2019  were  $81.50  and 

$58.65 per tonne, respectively, comparable to $81.20 and $59.67 per tonne in Q2 Fiscal 2018.  Total and 

cash  milling  costs  per  tonne  at  the  Ying  Mining  District  in  Q2  Fiscal  2019  were  $10.47  and  $8.54,  also 

comparable to $10.45 and $8.50 in Q2 Fiscal 2018.  

Correspondingly, the total production costs and cash production costs per tonne of ore processed in Q2 

Fiscal  2019  at  the  Ying  Mining  District  were  $96.23  and  $71.45,  compared  to  $95.33  and  $71.85  in  Q2 

Fiscal 2018, and the cash production costs of $71.45 per tonne is 5% lower than the annual guidance of 

$75.40.   

Cash cost per ounce of silver, net of by‐product credits, in Q2 Fiscal 2019 at the Ying Mining District, was 

negative  $2.80  compared  to  negative  $4.27  in  the  prior  year  quarter.  The  increase  in  the  cash  cost  per 

ounce of silver, net of by‐product credits, is mainly due to a 15% decrease in by‐product credits per once 

of silver, mainly arising from 8% and 20% decreases in lead and zinc realized selling price. All in sustaining 

costs per ounce of silver, net of by‐product credits, in Q2 Fiscal 2019 at the Ying Mining District was $1.52 

compared to $1.08 in the prior year quarter. The increase was mainly due to the cash cost per ounce of 

silver, net of by‐product credits as discussed above.  

In  Q2  Fiscal  2019,  approximately  22,672  metres  or  $0.5  million  worth  of  underground  diamond  drilling 

Operational results ‐ Ying Mining District

Q2 2019 Q1  2019 Q4  2018 Q3  2018 Q2  2018

September 30, 2018 June  30, 2018 March  31, 2018 December  31, 2017 September  30, 2017 2018 2017

Ore Mined (tonne)  180,662                    156,730                    113,820                    166,619                    173,294                         337,393                333,701               

Ore Milled (tonne)  172,200                    155,929                    112,285                    167,543                    173,946                         328,129                338,904               

Head Grades 

Silver (gram/tonne) 308                             323                            309                            315                            294                                 315                        299                       

Lead  (%) 4.6                              4.5                             4.3                             4.5                             4.3                                  4.6                         4.4                        

Zinc (%) 0.9                              1.1                             1.0                             1.0                             0.8                                  1.0                         0.8                        

Recoveries

Silver  (%)  96.1                           96.0                           95.9                           95.8                           95.6                                96.1                       95.7                      

Lead  (%) 95.6                            96.3                           96.5                           96.4                           96.2                                95.8                       96.3                      

Zinc (%) 51.2                            54.5                           54.5                           57.3                           50.7                                52.9                       48.4                      

Metal Sales 

Silver (in thousands of ounce) 1,765                          1,313                         1,319                         1,322                         1,472                              3,078                    2,796                   

Gold (in thousands of ounce) 1.0                              0.7                             0.7                             0.7                             0.8                                  1.7                         1.7                        

Lead (in thousands of pound) 17,359                       13,313                      12,649                      13,487                      15,279                           30,672                  29,044                 

Zinc (in thousands of pound) 1,648                          2,133                         1,106                         2,006                         2,269                              3,781                    3,024                   

Cash mining costs ($ per tonne)  58.65                         63.49                         65.88                         66.71                         59.67                              62.15                    57.32                   

Total mining costs ($ per tonne)  81.50                         89.57                         92.81                         90.12                         81.20                              86.50                    79.03                   

Cash milling costs ($ per tonne)  8.54                           10.30                         12.59                         9.84                           8.50                                9.37                       8.29                      

Total milling costs ($ per tonne)  10.47                         12.60                         15.80                         11.87                         10.45                              11.48                    10.28                   

Cash production costs ($ per tonne) 71.45                         78.10                         82.84                         80.60                         71.85                              75.80                    69.47                   

Cash costs per ounce of silver ($) (2.80)                          (6.25)                          (3.41)                          (4.53)                          (4.27)                               (4.27)                     (3.79)                    

 All‐in sustaining costs per ounce of 

silver ($)  1.52                           (0.28)                          1.39                           2.13                           1.08                                0.75                       2.30                      

Six Months ended September 30,

5

(Q2  Fiscal 2018 – 29,834 metres or $0.6 million) and 5,376 metres or  $1.7 million worth of  preparation 

tunnelling  (Q2  Fiscal  2018  –  6,390  metres  or  $1.9  million)  were  completed  and  expensed  as  mining 

preparation  costs  at  the  Ying  Mining  District.  In  addition,  approximately  18,634  metres  or  $6.0  million 

worth of horizontal tunnels, raises, ramps and declines (Q2 Fiscal 2018 – 16,958 metres or $5.2 million) 

were completed and capitalized.    

i) Six months ended September 30, 2018 vs. Six months ended September 30, 2017 

For the six months ended September 30, 2018, a total of 337,393 tonnes of ore were mined at the Ying 

Mining District, an increase of 1% or 3,692 tonnes compared to 333,701 tonnes mined in the same prior 

year period. Ore milled was 328,129 tonnes, down 3% or 10,775 tonnes compared to 338,904 tonnes in 

the same prior year period. Average head grades of ore processed were 315 g/t for silver, 4.6% for lead, 

and 1.0% for zinc compared to 299 g/t for silver, 4.4% for lead, and 0.8% for zinc, respectively, in the same 

prior year period. 

During  the same time periods, the Ying Mining District sold approximately 3.1 million ounces of silver, 1,700 

ounces of gold, 30.7 million pounds of lead, and 3.8 million pounds of zinc, compared to 2.8 million ounces of 

silver, 1,700 ounces of gold, 29.0 million pounds of lead, and 3.0 million pounds of zinc in prior year period. 

For the six months ended September 30, 2018, the cash mining costs and cash milling costs at the Ying Mining 

District  were  $62.15  per  tonne  and  $9.37  per  tonne,  an  increase  of  8%  and  13%,  respectively,  compared  to 

$57.32  and  $8.29  in  the  same  prior  year  period.  The  cash  production  costs  were  $75.80  per  tonne,  slightly 

higher than the annual guidance of $75.40.  

Cash cost per ounce of silver and all in sustaining costs per ounce of silver, net of by‐product credits, at 

the  Ying  Mining  District,  for  the  six  months  ended  September  30,  2018,  were  negative  $4.27  and  $0.75 

respectively, compared to negative $3.79 and $2.30 in the same prior year period. 

For  the  six  months  ended  September  30,  2018,  approximately  49,521  metres  or  $1.1  million  worth  of 

underground diamond drilling (same prior year period – 60,898 metres or $1.3 million) and 10,917 metres 

or $3.0 million worth of preparation tunnelling (same prior year period – 11,727 metres or $3.3 million) 

were  completed  and  expensed  as  mining  preparation  costs  at  the  Ying  Mining  District.  In  addition, 

approximately 35,562 metres or $12.5 million worth of horizontal tunnels, raises, and declines (same prior 

year period – 35,848 metres or $10.2 million) were completed and capitalized.  

2.  GC Mine, Guangdong Province, China 

i) Q2 Fiscal 2019 vs. Q2 Fiscal 2018 

In  Q2  Fiscal  2019,  the  total  ore  mined  at  the  GC  Mine  was  67,757  tonnes,  an  increase  of  3%  or  1,945 

tonnes,  compared  to  65,812  tonnes  mined  in  Q2  Fiscal  2018,  while  ore  milled  was  67,528  tonnes,  an 

increase of 6% or 3,880 tonnes compared to 63,648 tonnes in Q2 Fiscal 2018.  Average head grades of ore 

processed at the GC Mine were 78 g/t for silver, 1.4% for lead, and 2.8% for zinc compared to 102 g/t for 

Operational results ‐ GC Mine Q2 2019 Q1  2019 Q4  2018 Q3  2018 Q2  2018

September  30, 2018 June  30, 2018 Ma rch  31, 2018 December  31, 2017 Se ptember  30, 2017 2018 2017

Ore Mined (tonne)  67,757                     79,967                     29,442                     85,665                        65,812                      147,724              130,677           

Ore Milled (tonne)  67,528                     81,811                     26,252                     88,494                        63,648                      149,339              129,592           

Head Grades 

     Silver (gram/tonne) 78                              87                             96                             97                                102                            83                        100                   

     Lead  (%) 1.4                             1.3                            1.3                            1.4                               1.4                             1.3                       1.5                    

     Zinc (%) 2.8                             2.9                            2.9                            2.8                               2.8                             2.8                       2.7                    

Recovery Rates

     Silver  (%)  76.7                         75.3                         76.3                         73.6                             74.4                           75.9                     77.8                  

     Lead  (%) 91.2                          87.1                         87.5                         83.9                             82.8                           89.1                     86.0                  

     Zinc (%) 83.3                          84.8                         85.7                         81.3                             81.6                           84.1                     81.2                  

Metal Sales 

Silver (in thousands of ounce) 136                           150                          63                             196                              155                            286                      344                   

Lead (in thousands of pound) 2,063                        1,583                       688                          2,263                           1,656                         3,646                   3,803                

Zinc (in thousands of pound) 3,240                        4,244                       1,479                       4,399                           3,311                         7,484                   7,555                

Cash mining cost ($ per tonne)  41.25                       36.78                       45.92                       35.48                           34.60                         38.83                   36.88                

Total mining cost ($ per tonne)  49.29                       44.62                       57.47                       43.10                           42.62                         46.76                   44.78                

Cash milling cost ($ per tonne)  11.45                       14.46                       25.07                       14.09                           14.63                         13.10                   14.95                

Total milling cost ($ per tonne)  14.47                       17.14                       33.41                       16.45                           17.90                         15.93                   18.14                

Cash production cost ($ per tonne) 52.70                        51.24                       70.99                       49.57                           49.23                         51.93                   51.83                

Cash cost per ounce of silver ($) (10.81)                       (18.81)                      (13.95)                      (15.34)                         (13.56)                       (15.01)                 (10.39)              

 All‐in sustaining cost per ounce of silver ($)  (2.03)                        (11.36)                      (4.57)                        (4.52)                            (3.77)                          (6.92)                    (3.06)                 

Six  Months  Ended  September  30

6

silver, 1.4% for lead, and 2.8% for zinc in the prior year quarter.   

In  Q2  Fiscal  2019,  the  GC  Mine  sold  136  thousand  ounces  of  silver,  2.1  million  pounds  of  lead,  and  3.2 

million  pounds  of  zinc,  compared  to  155  thousand  ounces  of  silver,  1.7  million  pounds  of  lead,  and  3.3 

million  pounds of  zinc sold  in the prior  year quarter.    The decrease in metals sold  at  the GC Mine  was 

mainly  due to  the increase in ending  concentrate  inventories. As at September  30,  2018, inventories  of 

silver‐lead concentrates were 280 tonnes and zinc concentrates were 368, compared to inventories of 20 

tonnes of silver‐lead concentrate and 20 tonnes of zinc concentrate as at March 31, 2018.  

Total and cash mining costs per tonne at the GC Mine in Q2 Fiscal 2019 were $49.29 and $41.25 per tonne, 

compared to $42.62 and $34.60 per tonne in Q2 Fiscal 2018. The increase in cash mining costs was mainly 

due to a $0.3 million increase in mining preparation costs resulting from more underground drilling and 

tunnelling expensed in the current quarter. Total and cash milling costs per tonne at the GC Mine in Q2 

Fiscal 2019 were $14.47 and $11.45, a decrease of 19% and 22%, respectively, compared to $17.90 and 

$14.63, respectively, in Q2 Fiscal 2018.  

Correspondingly, the total production costs and cash production costs per tonne of ore processed in Q2 

Fiscal 2019 at the GC Mine were $63.76 and $52.70, an increase of 5% and 7%, respectively, compared to 

$60.52  and $49.23  in  the  prior  year  quarter, and  cash  production  costs  per tonne  is  8% lower than  the 

annual guidance of $57.20.    

Cash costs per ounce of silver, net of by‐product credits, at the GC Mine, was negative $10.81 compared 

to  negative  $13.56  in  the  prior  year  quarter.  The  increase  was  mainly  due  to  a  $0.3  million  or  11% 

increase cash production costs expensed into cost of sales and a $0.3 million or 5% decrease in by‐product 

credits mainly resulting from an 11% and 17% decrease in net realized lead and zinc selling prices at the 

GC Mine.  

All in sustaining costs per ounce of silver, net of by‐product credits, in Q2 Fiscal 2019 at the GC Mine was 

negative $2.03 compared to negative $3.77 in the prior year quarter, and the increase was mainly due to 

the higher cash costs per ounce of silver, net of by‐product credits as discussed above.  

In Q2 Fiscal 2019, approximately 7,355 metres or $0.3 million worth of underground diamond drilling (Q2 

Fiscal 2018 – 5,511 metres or $0.2 million) and 5,243 metres or $1.4 million worth of tunnelling (Q2 Fiscal 

2018 – 3,940 metres or $1.1 million) were completed and expensed as mining preparation costs at the GC 

Mine. In addition, approximately 241 metres or $0.2 million of horizontal tunnels raises and declines (Q2 

Fiscal 2018 – 105 metres or $0.1 million) were completed and capitalized.    

ii) Six months ended September 30, 2018 vs. Six months ended September 30, 2017 

For the six months ended September 30, 2018, a total of 147,724 tonnes of ore were mined and 149,339 

tonnes were milled at the GC Mine, compared to 130,677 tonnes mined and 129,592 tonnes milled in the 

same prior year period. Average head grades of ore milled were 83 g/t for silver, 1.3% for lead, and 2.8% 

for zinc, compared to 100 g/t for silver, 1.5% for lead, and 2.7% for zinc, respectively, in the same prior 

year period.   

During the same time periods, the GC Mine sold approximately 286 thousand ounces of silver, 3.6 million 

pounds  of  lead,  and  7.5  million  pounds  of  zinc,  compared  to  344  thousand  ounces  of  silver,  3.8  million 

pounds of lead, and 7.6 million pounds of zinc in the same prior year period.    

For  the  six  months  ended  September  30,  2018,  the  cash  mining  costs  at  the  GC  Mine  was  $38.83  per 

tonne, an increase of 5% compared to $36.88 per tonne in the same prior year period. The increase in the 

cash mining costs was mainly due to a $0.7 million increase in mining preparation as more underground 

drilling and tunnelling was expensed in the current period. The cash milling costs was $13.10 per tonne, a 

decrease  of  12%  compared  to  $14.95  in  the  same  prior  year  period.    Correspondingly,  the  total 

production  costs  and  cash  production  costs  per  tonne  at  the  GC  Mine  were  $62.69  and  $51.93, 

comparable to $62.92 and $51.83 in the prior year period, but the cash production costs per tonne is 9% 

lower than the annual guidance of $57.20. 

7

Cash costs per ounce of silver and all in sustaining costs per ounce of silver, net of by‐product credits, at 

the  GC  Mine,  for  the  six  months  ended  September  30,  2018,  were  negative  $15.01  and  negative  $6.92 

respectively, compared to negative $10.39 and negative $3.06 in the same prior year period.  

For  the  six  months  ended  September  30,  2018,  approximately  14,774  metres  or  $0.7  million  worth  of 

underground diamond drilling (same prior year period – 10,483 metres or $0.5 million) and 10,484 metres 

or $3.0 million of tunnelling (same prior year period – 9,232 metres or $2.4 million) were completed and 

expensed  as  mining  preparation  costs  at  the  GC  Mine.  In  addition,  approximately  779  metres  or  $0.7 

million  of  horizontal  tunnels,  raise,  and  declines  (same  prior  year  period  –  263  metres  or  $0.2  million) 

were completed and capitalized.  

Mr. Guoliang Ma, P.Geo., Manager of Exploration and Resources of the Company, is the Qualified Person 

for Silvercorp under NI 43‐101 and has reviewed and given consent to the technical information contained 

in this news release. 

This  earnings  release  should  be  read  in  conjunction  with  the  Company's  Management  Discussion  & 

Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have 

been  posted  on  SEDAR  under  the  Company’s  profile  at  www.sedar.com and  are  also  available  on  the 

Company's website at www.silvercorp.ca.   All figures are in United States dollars unless otherwise stated. 

About Silvercorp  

Silvercorp  is  a  low‐cost  silver‐producing  Canadian  mining  company  with  multiple  mines  in  China.  The 

Company's  vision  is  to  deliver  shareholder  value  by  focusing  on  the  acquisition  of  underdeveloped 

projects with resource potential and the ability to grow organically. For more information, please visit our 

website at www.silvercorp.ca. 

For further information 

Silvercorp Metals Inc. 

Lon Shaver   

Vice President 

Phone: (604) 669‐9397 

Toll Free 1(888) 224‐1881 

Email: [email protected]  

Website: www.silvercorp.ca 

CAUTIONARY DISCLAIMER ‐ FORWARD‐LOOKING STATEMENTS 

Certain  of  the  statements  and  information in  this  news  release  constitute  “forward‐looking statements”  within  the 

meaning  of  the  United  States  Private  Securities  Litigation  Reform  Act  of  1995  and  “forward‐looking  information” 

within the meaning of applicable Canadian provincial securities laws (collectively, “forward‐looking statements”). Any 

statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, 

projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases 

such  as  “expects”,  “is  expected”,  “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”, 

“strategies”, “targets”, “goals”, “forecasts”, “objectives”, “budgets”, “schedules”, “potential” or variations thereof or 

stating  that  certain  actions,  events  or  results  “may”,  “could”,  “would”,  “might”  or  “will”  be  taken,  occur  or  be 

achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may 

be  forward‐looking  statements.   Forward‐looking  statements  relate  to,  among  other  things:  the  price  of  silver  and 

other metals; the accuracy of mineral resource and mineral reserve estimates at the Company’s material properties; 

the sufficiency of the Company’s capital to finance the Company’s operations; estimates of the Company’s revenues 

and  capital  expenditures;  estimated  production  from  the  Company’s  mines  in  the  Ying  Mining  District;  timing  of 

receipt  of  permits  and  regulatory  approvals;  availability  of  funds  from  production  to  finance  the  Company’s 

operations; and access to and availability of funding for future construction, use of proceeds from any financing and 

development of the Company’s properties. 

Forward‐looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that 

could  cause  actual  events  or  results  to  differ  from  those  reflected  in  the  forward‐looking  statements,  including, 

without  limitation,  risks  relating  to:  fluctuating  commodity  prices;  calculation  of  resources,  reserves  and 

mineralization  and  precious  and  base  metal  recovery;  interpretations  and  assumptions  of  mineral  resource  and 

8

mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and 

licences; title to properties; property interests; joint venture partners; acquisition of commercially mineable mineral 

rights;  financing;  recent  market  events  and  conditions;  economic  factors  affecting  the  Company;  timing,  estimated 

amount,  capital  and  operating  expenditures  and  economic  returns  of  future  production;  integration  of  future 

acquisitions  into  the  Company’s  existing  operations;  competition;  operations  and  political  conditions;  regulatory 

environment  in  China  and  Canada;  environmental  risks;  foreign  exchange  rate  fluctuations;  insurance;  risks  and 

hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over 

financial reporting; and bringing actions and enforcing judgments under U.S. securities laws. 

This list is not exhaustive of the factors that may affect any of the Company’s forward‐looking statements. Forward‐

looking  statements  are  statements  about  the  future  and  are  inherently  uncertain,  and  actual  achievements  of  the 

Company  or  other  future  events  or  conditions  may  differ  materially  from  those  reflected  in  the  forward‐looking 

statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in 

the  Company’s  Annual  Information  Form  for  the  year  ended  March  31,  2018  under  the  heading  “Risk  Factors”.  

Although the Company has attempted to identify important factors that could cause actual results to differ materially, 

there may be other factors that cause results not to be as anticipated, estimated, described or intended.  Accordingly, 

readers should not place undue reliance on forward‐looking statements.    

The  Company’s  forward‐looking  statements  are  based  on  the  assumptions,  beliefs,  expectations  and  opinions  of 

management  as  of  the  date  of  this  news  release,  and  other  than  as  required  by  applicable  securities  laws,  the 

Company does not assume any obligation to update forward‐looking statements if circumstances or management’s 

assumptions,  beliefs,  expectations  or  opinions  should  change,  or  changes  in  any  other  events  affecting  such 

statements.  For  the  reasons  set  forth  above,  investors  should  not  place  undue  reliance  on  forward‐looking 

statements.