Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SURG.V ·

Surge Copper Announces a $200,000 Non-Brokered Private Placement

Financings

S U R G E

C O P P E R C O R P

PO Box 10351 888 - 700 West Georgia Street Vancouver, BC V7Y 1G5 P: 604-718-5454 F:604-646-2054

SURGE COPPER ANNOUNCES A $200,000 NON-BROKERED PRIVATE PLACEMENT

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE

UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A

VIOLATION OF U.S. SECURITIES LAW.

May 7, 2020 , Vancouver, British Columbia – Surge Copper Corp. (the “Company” or “Surge

Copper”) (TSX-V:SURG), announces a non-brokered private placement offering of up to 3,333,333

units (“Units”) at a price of $0.0 6 per Unit to raise gross proceeds of $ 200,000. Each Unit is

comprised of one common share and one share purchase warrant. Each warrant will entitle the

holder to acquire an additional common share of the Company at an exercise price of $0. 09 per

share for a period of three years from the closing date of the private placement.

In conjunction with this financing, the Company may pay a finder’s fee to eligible persons in

compliance with applicable securities laws and exchange policies. This financing is subject to TSX

Venture Exchange approval. The proceeds of the private placement will be used for general

working capital.

The Company is currently evaluating opportunities to continue to explore and advance the highly

prospective Ootsa Property located adjacent to the Huckleberry Mine in west central British

Columbia. The last exploration program at Ootsa in 2018 achieved the fol lowing successes

(previously released):

• A 50 metre step out on the East Seel deposit returned 138 metres grading 0.31% copper

and 0.37 g/t gold, including 52 metres grading 0.42% copper and 0.47 g/t gold (hole S18-

211).

• A new discovery outside of the current resource area intersected 22 metres grading 1%

copper, 0.19 g/t gold, and 35.3 g/t silver within a larger interval grading 0.5% copper, 0.1

g/t gold, and 17.6 g/t silver over 50 metres (hole S18-214).

• Hole S18-217 intersected 9.4 g/t gold over 2 metres at 130 depth in a new discovery along

an extensional fault zone which has an inferred strike length exceeding 3 kilometres.

The Ootsa Property is fully permitted , has an exploration camp on site, and contains excellent

road access in addition to a network of secondary roads providing access to large portions of the

property. This infrastructure allows for low cost all-weather exploration.

About Surge Copper Corp.

The Company owns a 100% interest in the Ootsa Property, an advanced stage exploration project

containing the East Seel, West Seel and Ox porphyry deposits located adjacent to the open pit

Huckleberry Copper Mine. The property contains NI 43 -101 compliant resources of 224 million

tonnes in the Measured and Indicated categories with contained metals of 1.1 billion pounds of

copper, 1 million ounces of gold, and 20 million ounces of silver as summarized in the table below.

On February 9, 2016, the Company announced a positive Preliminary Economic Assessment (PEA)

for the Ootsa Property with potential for low capital cost, low risk and rapid pay back utilizing

existing infrastructure in the district with a contract mining and toll milling scenario. The

Company currently has no agreement in place to access the existing mining and milling

infrastructure in the district.

Ootsa Project Pit Constrained Mineral Resource Estimate at $8.50/t NSR Cut-off Value

Category Tonnes

(‘000’s)

CuEq

%

Cu

%

Au

g/t

Mo

%

Ag

g/t

CuEq

M lbs

Cu

M lbs

Au

K oz

Mo

M lbs

Ag

K oz

Measured 187,148 0.38 0.23 0.15 0.021 2.8 1,568 934 916 85 17,089

Indicated 37,041 0.35 0.21 0.12 0.023 2.8 286 175 146 19 3,368

M&I 224,189 0.37 0.22 0.15 0.021 2.8 1,854 1,109 1,062 104 20,457

The current technical report supporting the resource statement and PEA is available on SEDAR or the Company’s website at

www.surgecopper.com and has an effective date of January 2016. The resource estimate uses $8.50 per tonne NSR cut-off value.

Mineral resources are not mineral reserves and by definition do not demonstrate economic viability. There is no certainty that all

or any part of the mineral resource will be converted into mineral reserves. A ‘Measured Mineral Resource’ is that part of a mineral

resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that the y can

be estimated with confidence sufficient to allow the appropriate application of t echnical and economic parameters, to support

production planning and evaluation of the economic viability of the deposit. An ‘Indicated Mineral Resource’ is that part of a

Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level

of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and

evaluation of the economic viability of the deposit. Copper Equivalent (CuEq) calculations are based on base case metal price

(US$3/lb Cu, US$1260/oz Au, US$10.30/lb Mo, and US$17/oz Ag) and process recovery assumptions, and take into account

smelter payable rates and refining costs. M&I = measured and indicated. The resource update and Preliminary Economic

Assessment was completed by P&E Mining Consultants Inc. in accordance with National Instrument 43 -101 Standards of

Disclosure for Mineral Projects.

Dr. Shane Ebert P.Geo. , is the Qualified Person for the Ootsa project as defined by National

Instrument 43-101 and has approved the technical disclosure contained in this news release.

ON BEHALF OF THE BOARD OF DIRECTORS

“Shane Ebert”

President and Chief Executive Officer

For Further information, please contact:

Telephone: 250-964-2699

[email protected]

http://www.surgecopper.com

Or

Don Mosher

Corporate Development

Telephone: 604-685-6465

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release .

This News Release contains forward-looking statements, which relate to future events. In some cases, you can identify

forward-looking statements by terminology such as "will", "may", "should", "expects", "plans", or "anticipates" or

the negative of these terms or ot her comparable terminology. These statements are only predictions and involve

known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of

activity, performance or achievements to be materially different fr om any future results, levels of activity,

performance, or achievements expressed or implied by these forward -looking-statements. Such uncertainties and

risks may include, among others, actual results of the Company's exploration activities being different than those

expected by management, delays in obtaining or failure to obtain required government or other regulatory approvals

or financing, inability to procure equipment and supplies in sufficient quantities and on a timely basis, equipment

breakdown and bad weather. While these forward -looking statements, and any assumptions upon which they are

based, are made in good faith and reflect the Company's current judgment regarding the direction of its business,

actual results will almost always vary, sometime s materially, from any estimates, predictions, projections,

assumptions or other future performance suggests herein. Except as required by applicable law, the Company does

not intend to update any forward-looking statements to conform these statements to actual results.