Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

STUD.V ·

Stallion Uranium Receives Exploration Permit for Coffer Uranium Project in the Athabasca Basin

Permits & Approvals

32583566v1

700-838 WEST HASTINGS ST

VANCOUVER, BRITISH COLUMBIA

V6C 0A6

Stallion Uranium Receives Exploration Permit for Coffer

Uranium Project in the Athabasca Basin

Vancouver, British Columbia, December 06, 2023 – Stallion Uranium Corp. (the "Company" or "Stallion")

(TSX-V: STUD; OTCQB: STLNF; FSE: HM40) is pleased to announce it has received the necessary permits from

the Saskatchewan Government to conduct ground -based geophysic al surveys and diamond drilling

exploration work on its 100% owned Coffer ("Coffer” or the " Project") Uranium Project in the Athabasca

Basin, Saskatchewan.

Highlights

• The company is planning for a targeted ground geophysics survey to commence in the coming weeks

that will further inform the planned maiden diamond drill program in Q1/2024.

• Permitted activities include access trail construction, temporary camp establishment, geophysical

surveying, and diamond drilling.

• Permits are valid until Nov 1, 2026, allowing for multiple seasons of geophysical surveying and drill

testing.

"We are thrilled to share the news that Stallion has secured an exploration permit for our Coffer project in

the Athabasca Basin," stated Drew Zimmerman, CEO of Stallion Uranium. "This permit represents a key step

in our ability to continue to advance our high-potential uranium targets. The Southwestern Athabasca Basin

is an underexplored corner of the globally recognized Athabasca Basin and we are eager to advance our

exploration activities in this burgeoning region that holds the potential to host the next significant uranium

discovery."

Next Steps

Stallion will initiate a targeted geophysical survey in the coming weeks over the Appaloosa Target on the

Coffer Project. Further information on the survey and target area will be released in the coming weeks.

About Coffer Project

The Coffer Project comprises 8 mineral claims and covering 35,875 hectares of highly prospective ground in

the Western Athabasca Basin. The project has never been drill tested and contains several kilometer-scale

prospective zones within the key target areas identified as Appaloosa, Clydesdale and Mustang. The

Appaloosa target will be the focus of the up -coming exploration programs as the Company has identified

gravity and magnetic lows on a conductive corridor known to correlate to alteration that hosts uranium

mineralization. The highly prospective target area shares geological analogue s to the nearby Shea Creek

deposit, home to over 95M lbs. of uranium.

32583566v1

About Stallion Uranium

Stallion Uranium is working to Fuel the Future with Uranium through the exploration of over 3,000 sq/km in

the Athabasca Basin, home to the largest high-grade uranium deposits in the world. The company holds the

largest contiguous project in the Western Athabasca Basin adjacent to multiple high-grade discovery zones.

Our leadership and advisory teams are comprised of uranium and precious metals exploration experts with

the capital markets experience and the technical talent for acquiring and exploring early-stage properties.

Stallion offers optionality with two gold projects in Idaho and Nevada that neighbour world class gold

deposits offering exposure to upside potential from district advancement with limited capital expenditures.

For more information visit stallionuranium.com or contact:

Drew Zimmerman

Chief Executive Officer

778-686-0973

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward- looking statements and forward- looking information within the meaning of Canadian securities

legislation (collectively, “forward-looking statements”) that relate to the Company’s current expectations and views of future events.

Any statements that express, or involve discussions as to, expectations, beliefs, plans, objectives, assumptions or future ev ents or

performance (often, but not always, through the use of words or phrases such as “will likely result”, “are expected to”, “expects”, “will

continue”, “is anticipated”, “anticipates”, “believes”, “estimated”, “intends”, “plans”, “forecast”, “projection”, “strategy”, “objective”

and “outlook”) are not historical facts and may be forward- looking statements and may involve e stimates, assumptions and

uncertainties which could cause actual results or outcomes to differ materially from those expressed in such forward- looking

statements. No assurance can be given that these expectations will prove to be correct and such forward-looking statements included

in this material change report should not be unduly relied upon. These statements speak only as of the date they are made.

Forward-looking statements are based on a number of assumptions and are subject to a number of risks and uncertainties, many of

which are beyond the Company’s control, which could cause actual results and events to differ materially from those that are disclosed

in or implied by such forward- looking statements. The Company undertakes no obligation to update or revise any forward- looking

statements, whether as a result of new information, future events or otherwise, except as may be required by law. New factors emerge

from time to time, and it is not possible for the Company to predict all of them, or assess the impact of each such factor or the extent

to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward- looking

statement. Any forward-looking statements contained in this presentation are expressly qualified in their entirety by this cautionary

statement.

Forward-looking statements are based on a number of assumptions and are subject to a number of risks and uncertainties, many of

which are beyond the Company’s control, which could cause actual results and events to differ materially from those that are

disclosed in or implied by such forward-looking statements. The Company undertakes no obligation to update or revise any forward-

looking statements, whether as a result of new information, future events or otherwise, except as may be required by law. New

factors emerge from time to time, and it is not possible for the Company to predict all of them, or assess the impact of each such

factor or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in

any forward-looking statement. Any forward-looking statements contained in this presentation are expressly qualified in their

entirety by this cautionary statement.