Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

STS.V ·

South Star Battery Metals Announces Approval of the Environmental Permits for the Santa Cruz Graphite Mine Phases 2 & 3 in Bahia, Brazil

Permits & Approvals

South Star Battery Metals Announces Approval of the Environmental

Permits for the Santa Cruz Graphite Mine Phases 2 & 3 in Bahia, Brazil

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES FOR DISSEMINATION IN THE UNITED STATES

VANCOUVER, CANADA, February 06, 2024 – South Star Battery Metals Corp. (“South Star” or the “Company”)

(TSXV: STS) (OTCQB: STSBF), is pleased to announce that the environmental permits for Santa Cruz Graphite

Mine Phases 2 and 3 have been approved for up to 50,000 tonne per annum (“tpa”) of concentrate for eight

mining claims. Following approval of the environmental permits, f ive of the principal claims were approved by

the regional office of the National Mining Agency (“ANM”) and forwarded to the Ministry of Mines and Energy

(“MME”) in Brasilia for final review of the life-of-mine permit applications. The Phases 2 and 3 environmental

permits were approved with conditions generally in line with the Phase 1 permit and are consistent with the

current environmental and community engagement programs already underway.

South Star President , Richard Pearce, commented, “This important approval is another big achievement for

Santa Cruz and is a key step forward in derisking our future operations and scaling our production at a critical

time for battery metals. Once the full mining concessions incorporating Phase s 2 and 3 are approved by the

MME, we will be able to increase our Phase 1 production to name plate capacity of 13,000 tpa from 5,000 tpa

and deliver more high-quality Brazilian flake graphite to our clients. Our goal is to have all permits/licenses in

hand shortly for 50,000 tpa of production and advancing the Santa Cruz feasibility study so we are ready to

make an investment decision shortly after delivery of the report in December 2024. Up to US$18M is available

through our agreement with Sprott Streaming for Phase 2 production expansion upon delivery of the FS. I

would like to sincerely thank our team, the Municipality of Itabela and all stakeholders for their continuing

support of Santa Cruz as we responsibly scale our operations in one of the most proven graphite districts in the

world. Santa Cruz will be the first new graphite production in the Americas since 1996, and we look forward to

scaling operations soon as our clients request additional production from us.”

Upcoming catalysts in 2024 include advancing the Santa Cruz NI 43-101 Feasibility Study (“FS”), which will build

on the Prefeasibility Study previously released in 2021. The FS will advance Santa Cruz operations with a

phased, modular design plant facility and will include the following milestones:

• Approximately 4,000m of diamond and reverse circulation drilling

• Updated Resource/Reserve estimate

• Updated mine plans

• Flow sheet optimizations

• Natural flake graphite concentrate production expansion

o Phase 1: 5,000 scaling to 13,000 tpa

o Phase 2: +25,000 tpa module

o Phase 3: +25,000 tpa module

• Infrastructure and access

• Project CAPEX/OPEX

• Project Economics

ABOUT SOUTH STAR BATTERY METALS CORP

South Star Battery Metals Corp. is a Canadian battery metals project developer focused on the selective

acquisition and development of near -term production projects in the Americas. South Star’s Santa Cruz

Graphite Project, located in Southern Bahia, Brazil is the first of a series of industrial and battery metals projects

that will be put into production. Brazil is the second -largest graphite-producing region in the world with more

than 80 years of continuous mining. Santa Cruz has at-surface mineralization in friable materials, and successful

large-scale pilot-plant testing (> 30t) has been completed. The results of the testing show that approximately

65% of Cg concentrate is +80 mesh with good recoveries and 95% -99% Cg. With excellent infrastructure and

logistics, South Star is fully funded for Phase 1, and the construction and commissioning are underway . Santa

Cruz will be the first new graphite production in the Americas since 1996 with Phase 1 commercial production

projected in Q1 2024. Phase 2 production (25,000 tpa) is partially funded and planned for 2026, while Phase 3

(50,000 tpa) is scheduled for 2028.

South Star’s second project in the development pipeline is strategically located in Alabama in the center of a

developing electric vehicle, aerospace, and defen se hub in the southeastern United States . The BamaStar

Project is a historic mine active during World Wars I & II . A NI43-101 technical report with the maiden resource

estimate has been filed on SEDAR. Trenching, phase 1 drilling, sampling, analysis, and preliminary metallurgical

testing have been completed. The testing indicates a traditional crush/grind/flotation concentration circuit that

achieved grades of approximately 94-97% Cg with approximately 86% recoveries. South Star is executing on its

plan to create a multi -asset, diversified battery metals company with near -term operations in strategic

jurisdictions. South Star trades on the TSX Venture Exchange under the symbol STS, and on the OTCQB under

the symbol STSBF.

South Star is committed to a corporate culture, project execution plan and safe operations that embrace the

highest standards of ESG principles based on transparency, stakeholder engagement, ongoing education , and

stewardship. To learn more, please visit the Company website at http://www.southstarbatterymetals.com.

This news release has been reviewed and approved by Richard Pearce, P.E., a “Qualified Person” under National

Instrument 43-101 and President and CEO of South Star Battery Metals Corp.

On behalf of the Board,

MR. RICHARD PEARCE

Chief Executive Officer

For additional information, please contact:

South Star Investor Relations

Email: [email protected]

+1 (604) 706-0212

Twitter: https://twitter.com/southstarbm

Facebook: https://www.facebook.com/southstarbatterymetals

LinkedIn: https://www.linkedin.com/company/southstarbatterymetals/

YouTube: South Star Battery Metals – YouTube

CAUTIONARY STATEMENT

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

FORWARD-LOOKING INFORMATION

This press release contains “forward-looking statements” within the meaning of applicable securities legislation.

Forward-looking statements relate to information that is based on assumptions of management, forecasts of

future results, and estimates of amounts not yet determinable. Any statements that express predictions,

expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not

statements of historical fact and may be “forward-looking statements ”. Forward -looking statements in this

press release include, but are not limited to, statements relating to the successful closing of the Private

Placement and anticipated timing thereof and the intended use of proceeds and statements regarding moving

Santa Cruz into production and scaling operations as well as advancing the Alabama project; and the Company’s

plans and expectations.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events

or results to differ from those reflected in the forward -looking statements, including, without limitation: risks

related to failure to obtain adequate financing on a timely basis and on acceptable terms; risks related to the

outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related

to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the

potential for delays in exploration or development activities or the completion of feasibility studies; the

uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology,

grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost

estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies,

and the possibility that future exploration, development or mining results will not be consistent with the

Company's expectations; risks related to commodity price fluctuations; and other risks and uncertainties related

to the Company's prospects, properties and business detailed elsewhere in the Company's disclosure record.

Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove

incorrect, actual results may vary materially from those described in forward -looking statements. Investors are

cautioned against attributing undue certainty to forward-looking statements. These forward-looking statements

are made as of the date hereof and the Company does not assume any obligation to update or revise them to

reflect new events or circumstances. Actual events or results could differ materially from the Company's

expectations or projections.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in

the United States. The securities have not been and will not be registered under the United States Securities Act

of 1933, as amended (the “U.S. Securities Act”) or any state securities laws and may not be offered or sold

within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state

securities laws or an exemption from such registration is available.