South Star Announces Webinar with an Overview of the BamaStar NI 43-101 PEA for Vertically Integrated Graphite Mine and Value- Add Project in Alabama, U.S.A.
South Star Announces Webinar with an Overview of the BamaStar
NI 43-101 PEA for Vertically Integrated Graphite Mine and Value-
Add Project in Alabama, U.S.A.
VANCOUVER — October 14, 2024 — SOUTH STAR BATTERY METALS CORP. (“South Star” or the “Company”)
(TSXV: STS) (OTCQB: STSBF) is pleased to announce it will be hosting a live, interactive webinar to provide an
overview of the positive results and outstanding economics as presented in the N ational Instrument 43-101
Preliminary Economic Assessment (“PEA”) for the BamaStar Graphite Project (“BamaStar”) in Alabama (“AL”)
USA. South Star is developing a vertically integrated USA battery anode material strategy to supply the expanding
worldwide lithium-ion battery (“LiB”), fuel cell , defense and industrial graphite markets. The PEA study results
were previously announced on October 10,2024.
The event will be held on Friday, October 18, 2024 at 13:00 EST. The webinar will provide an overview of market
conditions and trends, as well as study highlights. Discussion topics will include the following:
• Graphite Supply/Demand Projections 2025-2030
• Graphite Market Dynamics and Pricing Trends 2025-2030
• Opportunities and Threats for Graphite Sector/Producers
• BamaStar PEA Overview & Highlights
• Interactive Q&A
Please register in advance for this webinar:
WEBINAR REGISTRY LINK
When: Friday, October 18, 2024 at 1:00 pm EST
# # #
ABOUT SOUTH STAR BATTERY METALS CORP.
South Star is a Canadian battery-metals project developer focused on the selective acquisition and development
of near-term production projects in the Americas. South Star’s Santa Cruz Graphite Project, located in Southern
Bahia, Brazil is the first of a series of industrial- and battery-metals projects that will be put into production. Brazil
is the second-largest graphite-producing region in the world with more than 80 years of continuous mining. Santa
Cruz has at-surface mineralization in friable materials, and successful large-scale pilot-plant testing (> 30 tonnes)
has been completed. The results of the testing show that approximately 65% of graphite concentrate is +80 mesh
with good recoveries and 95%-99% graphitic carbon (Cg). With excellent infrastructure and logistics, South Star
Phase 1 is ramping up commercial production with first sales expected to be delivered in October 2024. Santa
Cruz Phase 1 commercial production has a nameplate capacity of 12,000 tpy and is the first new graphite
production in the Americas since 1996. Phase 2 production (25,000 tpy) is partially funded and planned for 2026,
while Phase 3 (50,000 tpy) is scheduled for 2028.
South Star’s second project in the development pipeline is strategically located in Alabama , U.S.A. in the center
of a developing electric -vehicle, aerospace, and defense hub in the southeastern United States. The BamaStar
Project includes a historic mine active during the First and Second World Wars. A NI 43-101 Preliminary Economic
Assessment will be filed on SEDAR+ within 45 days of this Press Release . Trenching, Phase 1 drilling, sampling,
analysis, and preliminary metallurgical testing have been completed. The testing included a traditional
crush/grind/flotation concentration circuit that achieved grades of approximately 94-99% Cg with approximately
90% recoveries. The vertically integrated production facilities include a mine and industrial concentrator in Coosa
County, AL and a downstream value -add plant in Mobile, AL , which will be upgrading natural flake graphite
concentrates from both Santa Cruz and BamaStar mines. South Star is executing on its plan to create a multi -
asset, diversified battery-metals company with near-term operations in strategic jurisdictions. South Star trades
on the TSX Venture Exchange under the symbol STS, and on the OTCQB under the symbol STSBF.
South Star is committed to a corporate culture, project execution plan and safe operations that embrace the
highest standards of ESG principles, based on transparency, stakeholder engagement, ongoing education, and
stewardship. To learn more, please visit the Company website at http://www.southstarbatterymetals.com.
This news release has been reviewed and approved for South Star by Richard Pearce, P.E., a “Qualified Person”
under National Instrument 43-101 and President and CEO of South Star Battery Metals Corp.
On behalf of the South Star Board of Directors,
MR. RICHARD L. PEARCE,
President & Chief Executive Officer
For additional information, please contact:
South Star Investor Relations
Email: [email protected]
Phone: +1 (604) 706-0212
Website: www.southstarbatterymetals.com
Twitter: https://twitter.com/southstarbm
Facebook: https://www.facebook.com/southstarbatterymetals
LinkedIn: https://www.linkedin.com/company/southstarbatterymetals/
YouTube: South Star Battery Metals – YouTube
CAUTIONARY STATEMENT
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.
FORWARD-LOOKING INFORMATION
This press release contains “forward-looking statements” within the meaning of applicable securities legislation.
Forward-looking statements relate to information that is based on assumptions of management, forecasts of
future results, and estimates of amounts not yet determinable. Any statements that express p redictions,
expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not
statements of historical fact and may be “forward-looking statements”. Forward-looking statements in this press
release include, but are not limited to statements regarding moving Santa Cruz into production and scaling
operations; the company’s plans for the development and construction of a mine and concentrator plant for the
BamaStar Project; the financial estimates provided in the PEA, including net present value and internal rates of
return; statements relating to the permitting process; the proposed design and operating parameters of the
mining plan for the BamaStar Project provided in the PEA, including projected capital, operating cos ts, annual
production, projected metallurgical recoveries, life of mine and projected timelines; future demand for graphite;
and the Company’s other plans and expectations.
Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or
results to differ from those reflected in the forward-looking statements, including, without limitation risks related
to: failure to obtain adequate financing on a timely basis and on acceptable terms; the outcome of legal
proceedings; political and regulatory risks associated with mining and exploration; the maintenance of stock
exchange listings; environmental regulation and liability; the potential for delays in exploration or development
activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating
to the interpretation of drill results, the geology, grade and continuity of mineral dep osits; inherent uncertainty
of production and cost estimates and the potential for unexpected costs and expenses; the Company may not
obtain all necessary governmental permits; results of prefeasibility and feasibility studies, and the possibility that
future exploration, development or mining results will not be consistent with the Company's expectations; risks
related to commodity price fluctuations; and other risks and uncertainties related to the Company's prospects,
properties and business detailed elsewhere in the Company's disclosure record. Should one or more of these risks
and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary
materially from those described in forward -looking statements. Assumptions used by the Company to develop
forward-looking statements include the assumptions that (i) the BamaStar Project will ultimately obtain all
required environmental and other permits and licenses without undue delay, (ii) any feasibility studies prepared
for the development of the BamaStar Project will be positive, (iii) the Company’s estimates of mineral resources
will not change, and the Company will be successful in converting mineral resources to mineral reserves, (iv) the
Company will be able to establish the commercial feasibility of the BamaStar Project, and (v) the Company will be
able to secure the financing required to develop the BamaStar Project.
Investors are cautioned against attributing undue certainty to forward-looking statements. These forward-looking
statements are made as of the date hereof and the Company does not assume any obligation to update or revise
them to reflect new events or circumstances except as required by applicable laws. Actual events or results could
differ materially from the Company's expectations or projections.