STLLR Files the NI 43-101 Technical Report for the Tower Gold Project Updated Mineral Resource Estimate and Preliminary Economic Assessment
Page 1 of 2
STLLR Files the NI 43-101 Technical Report
for the Tower Gold Project Updated Mineral Resource Estimate
and Preliminary Economic Assessment
TORONTO, ONTARIO, June 30, 2025 – STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D)
(“STLLR” or the “Company”) announced the filing of a Technical Report for the updated Mineral
Resource Estimate (“2025 MRE”) and Preliminary Economic Assessment (“2025 PEA”) for its 100%-
owned Tower Gold Project (“Tower” or the “Project”) located in the prolific Timmins Mining Camp in
Ontario, Canada (the “ Technical Report ”). A copy of the Technical Report is available on
www.sedarplus.ca or on the Company’s website www.stllrgold.com.
The Technical Report, titled “Preliminary Economic Assessment NI 43 -101 Technical Report Tower
Gold Project”, was prepared by Qualified Persons in accordance with the National Instrument 43-101
– Standards of Disclosure for Mineral Projects (“NI 43-101”) from InnovExplo (a member of Norda
Stelo), G Mining Services (“GMS”), and WSP Inc. (“WSP”). These persons have the ability and authority
to verify the authenticity and validity of this data and are independent from the Company.
About STLLR Gold
STLLR Gold Inc. is a Canadian gold development company actively advancing high -potential gold projects in
Canada: The Tower Gold Project and the Hollinger Tailings Project in the Timmins Mining Camp in Ontario and
the Colomac Gold Project located north of Yellowknife, Northwest Territories. Tower and Colomac have the
potential to become large-scale, long-life operations and are surrounded by exploration land with favourable
upside potential. Hollinger has the potential for near -term value creation. STLLR’s experienced management
team, with a track record of successfully advancing projects and operating mines, is working towards rapidly
advancing these projects.
Contact Us
STLLR Gold Investor Relations
+1 (416) 863-2105 | [email protected] | www.STLLRgold.com
Forward-Looking Information
This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation.
Forward-looking information includes, but is not limited to the large-scale, long-life potential advancement of Tower and
Colomac, and the value potential of Hollinger. Generally, forward -looking information can be identified by the use of
forward-looking terminology such as “accelerate”, “add” or “additional”, “advancing”, “anticipates” or “does not anticipate”,
TSX: STLR | OTCQX: STLRF | FSE: O9D
STLLRGOLD.COM
Page 2 of 2
“appears”, “believes”, “can be”, “conceptual”, “confidence”, “continue”, “convert” or “conversion”, “deliver”, “demonstrating”,
“estimates”, “encouraging”, “expand” or “expanding” or “expansion”, “expect” or “expectations”, “fast -track”, “forecasts”,
“forward”, “goal”, “improves”, “increase”, “intends”, “justification”, “leading”, “plans”, “potential” or “potentially”, “pro-forma”,
“promise”, “prospective”, “prioritize”, “reflects”, “re -rating”, “robust”, “scheduled”, “stronger”, “suggesting” or “suggests”,
“support”, “updating”, “upside”, “will be” or “will consider”, “work towards”, or variations of such words and phrases or state
that certain actions, events or results “may”, “could”, “would”, “might”, or “will be taken”, “occur”, or “be achieved”.
Forward-looking information is based on the opinions and estimates of management at the date the information is made,
and is based on a number of assumptions and is subject to known and unknown risks, uncertainties and other factors that
may cause the actual results, level of activity, performance or achievements of STLLR to be materially different from those
expressed or implied by such forward-looking information, including risks associated with required regulatory approvals,
the exploration, development and mining such as economic factors as they effect exploration, future commodity prices,
changes in foreign exchange and interest rates, global inflationary pressures, actual results of current exploration activities,
government regulation, political or ec onomic developments, the ongoing wars and their effect on supply chains, tariffs,
environmental risks, pandemic risks, permitting timelines, capex, operating or technical difficulties in connection with
development activities, employee relations, the specu lative nature of gold exploration and development, including the
risks of diminishing quantities of grades of reserves, contests over title to properties, and changes in project parameters
as plans continue to be refined as well as those risk factors discussed in the Company’s Annual Information Form for the
year ended December 31, 2024, available on www.sedarplus.ca. Although STLLR has attempted to identify important
factors that could cause actual results to differ materially from those contained in forward-looking information, there may
be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such
information will prove to be accurate, as actual results and future events could differ materially from those anticipated in
such information. Accordingly, readers should not place undue reliance on forward -looking information. STLLR does not
undertake to update any forward-looking information, except in accordance with applicable securities laws.