NEWS RELEASE – 10/2022 Symbol: TSX: ME FOR IMMEDIATE RELEASE

MONETA INCREASES RESOURCES TO 4,265,000 OZ GOLD INDICATED AND

7,496,000 OZ GOLD INFERRED AT TOWER GOLD PROJECT

Toronto, Ontario – May 11, 2022 - Moneta Gold Inc. (TSX: ME) (OTCQX: MEAUF) (XETRA: MOP)

(“Moneta” or the “Company”) is pleased to provide an updated mineral resource estimate (“MRE”) for

its 100% owned Tower Gold project (“Project”), located 100 kilometres (“km”) east of Timmins, Ontario .

The consolidated mineral resource now totals 4.27 million (“M”) ounces (“oz”) indicated gold (“Au”) and

7.50 Moz inferred gold, positioning Tower Gold as one of the advanced exploration projects in Canada.

The MRE will form the basis of an updated preliminary economic assessment (“PEA”) scheduled for

completion later this quarter.

Highlights of the Updated Tower Gold Mineral Resource Estimate:

• 70% increase in total contained Au to 7,496,000 oz (combined underground and open pit) in

the inferred category on the Tower Gold project

o Addition of 3,097,000 oz of total inferred gold resources

• 8% increase in total contained Au to 4,265,000 oz (combined underground and open pit) in the

indicated category on the Tower Gold project

o Addition of 298,000 oz of total indicated gold resources

• Increase in grade of the underground resources (22% indicated and 2% inferred) and no

material change in the average grade of the open pit resources

• 25% increase of indicated open pit Au resources to 4,1 53,000 oz and 156% increase in inferred

open pit Au resources to 5,801,000 oz

• Increase in higher grade ounces in the Garrison starter pit to 1,748,000 oz contained Au

indicated resources at a grade of 1.07 g/t Au

• Definition of high -grade open pit at Westaway contai ning 1,067,000 oz at a grade of 2. 14 g/t

Au inferred resources

• Re-establishment of the open pit at South West containing 316,000 oz Au indicated and

1,195,000 oz Au inferred resources

• Infill of the Windjammer open pit to contain 1 ,767,000 oz Au indicated and 2,393,000 oz Au

inferred contained ounces (Windjammer South and Windjammer Central)

The updated mineral resource was independently prepared by A PEX Geoscience Ltd. in accordance with

National Instrument 43-101 (“NI 43-101”), with an effective date of May 11, 2022, and using a database

current as of March 15, 2022. The Tower Gold project has shown a significant improvement in size over

the December 2020 resource estimate and remains open in several directions. The majority of the new

resources are attributed to the addition of over 3.0 Moz of total inferred gold re sources and 0.3 Moz

indicated resources, including the re-establishment of an open pit resource at South West, the discovery

of additional resources at Westaway, the infill of the Windjammer open pit at Windjammer Central, and

the definition of underground resources at Garrcon.

2

Mr. Gary O’Connor, Chief Executive Officer commented “We are extremely pleased with the outcome of

this mineral resource estimate update for the Tower Gold project . The objective of a significant increase

in mineral resources was achieved, while confirming once more the potential of this exceptional Project.

We have seen an increase in the underground grade and an expansion of our open pit resource base

without any material loss in grade, whilst capturing some of the previous underground resources within

the new open pits. This resource update will form the basis of the long-life mine plan, with large scale

open pit and high -grade underground optionality, to be outlined in a preliminary economic assessment

(“PEA”) study, anticipated to be completed in late June 2022. We would also like to acknowledge the

excellent work of our employees and contractors in managing our significant drill program to deliver this

very significant resource and a special thank you to our Wahgoshig First Nation hosts, stakeholders, and

shareholders for their continued support as we advance this Project”.

Table 1: NI 43-101 Mineral Resource Estimate by Deposit – Tower Gold Project

May 2022 Resource Category

Indicated Inferred

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

Total Open Pit 146,294,000 0.88 4,153,000 207,878,000 0.87 5,801,000

Underground 701,000 4.95 112,000 12,269,000 4.30 1,695,000

Total Open Pit + Underground 146,995,000 0.90 4,265,000 220,147,000 1.06 7,496,000

Breakdown by Deposit

South West Open Pit 11,176,000 0.88 316,000 41,178,000 0.90 1,195,000

Underground 168,000 4.54 25,000 6,761,000 4.36 948,000

Windjammer South Open Pit 45,146,000 0.78 1,135,000 26,631,000 0.72 613,000

Underground - - - 918,000 4.57 135,000

Westaway Open Pit 312,000 2.22 22,000 15,530,000 2.14 1,067,000

Underground - - - 3,214,000 3.94 407,000

Windjammer Central Open Pit 31,986,000 0.62 632,000 85,086,000 0.65 1,780,000

Underground - - - - - -

55 Zone Open Pit 4,379,000 1.25 176,000 4,621,000 1.02 151,000

Underground - - - 186,000 4.20 25,000

Discovery Open Pit 2,251,000 1.72 125,000 5,511,000 1.50 266,000

Underground - - - 440,000 4.19 59,000

Garrcon Open Pit 25,614,000 1.02 841,000 707,000 0.67 15,000

Underground 533,000 5.08 87,000 750,000 4.98 120,000

903 Open Pit 18,843,000 1.01 610,000 25,040,000 0.74 600,000

Underground - - - - - -

Jonpol Open Pit 6,587,000 1.40 297,000 3,574,000 0.99 114,000

Underground - - - - - -

Notes:

1. Mineral Resource Estimates are reported at t wo different cut-off grades; 0.3 g/t Au for the surface mining scenario

and 2.6 g/t Au for the underground mining scenario.

2. The cut-off grade was determined at a gold price of US$1, 750 per ounce and an exchange rate of USD$/CDN$ of

0.78.

3. The resource estimate is supported by statistical analysis with different high -grade capping applied to each of the

deposits ranging from 1.6 g/t Au to 80.0 g/t Au applied on assays composited into one (1) metre composites

4. The mineral resources presented here were estimated with a block size of 2.5mx2.5mx2.5m utilizing percent blocks

and constrained within geological wireframes with a minimum width of 1.50m. Gold was estimated by Ordinary

3

Kriging using locally varying anisotropy variogram models. The max range of the variogra m models generally are

between 65mx25mx2.5m and 80m x 45m x5m. The search ellipse was constrained to selecting composites flagged

within each domain.

5. The mineral resources presented here were estimated by APEX Geoscience Ltd. using the Canadian Institute o f

Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Reserves definitions and guidelines.

6. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of

mineral resources may be material ly affected by environmental, permitting, legal, title, market or other relevant

factors.

7. The quantity and grade of reported Inferred Resources are uncertain in nature and there has not been sufficient

work to define these Inferred Resources as Indicated o r Measured Resources. It is reasonably expected that the

majority of the Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued

exploration.

8. The historical underground voids from mining in any of the deposit areas have been removed.

9. Tonnage estimates are based on bulk densities individually measured and calculated for each of the deposit areas.

Resources are presented as undiluted and in situ.

10. This mineral resource estimate is dated May 11, 202 2. The effective date for the drill -hole database used to

produce this updated mineral resource estimate is March 15, 2022. Tonnages and ounces in the tables are rounded

to the nearest thousand and hundred, respectively. Numbers may not total due to rounding.

11. A new NI 43 -101 report will not be produced as the total tonnage or total contained metal have not changed by

more than 100% over the most recent previous resources. A new updated NI 43 -101 technical report will be

produced with updated resources upon completion of the updated PEA.

12. Discovery includes the Windjammer North resource.

13. Mr. Mike Dufresne, P.Geo. of A PEX Geoscience Ltd., who is deemed a qualified persons as defined by N I 43-101 is

responsible for the completion of the updated mineral resource estimation.

Mineral Resource Comparisons; May 2022 versus December 2020

Table 2: NI 43-101 Mineral Resource Estimate Comparison – Total Resources

May 2022 vs December 2020

Open Pit + Underground Indicated Inferred

Category Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

December 2020 121,604,000 1.01 3,967,000 95,083,000 1.44 4,399,000

May 2022 146,995,000 0.90 4,265,000 220,147,000 1.06 7,496,000

Difference 25,391,000 298,000 125,064,000 3,097,000

Percentage Change 21% 8% 132% 70%

Table 3: NI 43-101 Mineral Resource Estimate Comparison – Open Pit Resources

May 2022 vs December 2020

Total Open Pit Indicated Inferred

Category Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

December 2020 116,745,000 0.89 3,335,000 79,372,000 0.89 2,270,000

May 2022 146,294,000 0.88 4,153,000 207,878,000 0.87 5,801,000

Difference 29,549,000 818,000 128,506,000 3,531,000

Percentage Change 25% 25% 162% 156%

4

Table 4: NI 43-101 Mineral Resource Estimate Comparison – Underground Resources

May 2022 vs December 2020

Total Underground Indicated Inferred

Category Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

December 2020 4,859,000 4.05 632,300 15,711,000 4.21 2,128,100

May 2022* 701,000 4.95 112,000 12,268,000 4.30 1,694,000

Difference -4,158,000 -520,300 -3,443,000 -434,100

Percentage Change -86% -82% -22% -20%

Resources reported in the underground category in December 2020 have been reclassified into the open

pit category in May 2022 due to the expansion and deepening of the open pits in the current estimate.

Mineral Resource Sensitivities

Mineral resources at various cut -off grades are presented for the open pit resources and for the

underground resources in Table 5 and Table 6 . Design basis assumptions for the calculation of the cut -

off grades applied to the resource estimates are provided below for the open pit resources and for the

underground resources. The mineral resources are reported at the same cut-off grades as for the

December 2020 open pit resource estimates (0.30 g/t Au) in both the Golden Highway and Garrison

areas, and for the December 2020 underground mineral resource for the South West deposit at Golden

Highway (2.60 g/t Au).

Table 5: Tower Gold, Open Pit Resource Estimate Sensitivity Table

Indicated Inferred

Cut-Off

Grades

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

0.20 179,584,000 0.77 4,421,000 259,798,000 0.74 6,218,000

0.25 162,836,000 0.82 4,299,000 232,794,000 0.80 6,023,000

0.30 146,293,000 0.88 4,153,000 207,879,000 0.87 5,802,000

0.40 117,035,000 1.02 3,826,000 162,690,000 1.01 5,296,000

0.50 94,078,000 1.16 3,495,000 128,435,000 1.16 4,803,000

Table 6: Tower Gold, Underground Resource Estimate Sensitivity Table

Indicated Inferred

Cut-Off

Grades

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

Tonnes

(t)

Grade

(g/t Au)

Ounces

(oz)

1.50 1,584,000 3.30 168,000 28,201,000 2.99 2,711,000

2.00 1,035,000 4.10 136,000 18,983,000 3.59 2,190,000

2.60 701,000 4.95 112,000 12,268,000 4.30 1,695,000

3.00 545,000 5.53 97,000 9,443,000 4.74 1,438,000

5

Mineral Resource Methodology, Assumptions and Cut-Off Grades

Modeling was conducted in the Universal Transverse Mercator (UTM) coordinate space relative to the

North American Datum (NAD) 1983, and UTM zone 17N. The mineral resource block model utilized a

block size of 2.5 m (X) x 2.5 m (Y) x 2.5 m (Z) to honor the mineralization wireframes. The percentage of

the volume of each block below the bare earth surface, below the modeled waste overburden surface

and within each mineralization domain was calculated using the 3D geological models and a 3D surface

model. For the open pit resources, the block model was block -averaged up to a 5 m (X) x 5 m (Y) x 5 m

(Z) SMU block size for pit optimization with the outer blocks on the boundaries of the domains diluted.

The MRE is based on the combination of geological modeling, geostatistics and conventional block

modeling using the Ordinary Kriging method of grade interpolation with locally varying anisotropy

variogram models.

The Golden Highway area drillhole database consists of 748 drill holes that intersected the interpreted

mineralization wireframes. The gold assays were composited to 1 met re composites lengths and the

estimation utilized 75,652 composited samples. A total of 10% of the total drilled met res insid e the

interpreted mineralization wireframes were not sampled, assumed to be waste, and assigned a nominal

waste value of half the detection limit of modern assay methods (0.0025 g/t)

The Garrison area drillhole database consists of 992 drillholes that int ersect the interpreted

mineralization wireframes. The gold assays were composited to 1 met re composites lengths and the

estimation utilized 166,673 composited samples. A total of 13% of the total drilled met res inside the

interpreted mineralization wireframes were not sampled, assumed to be waste, and assigned a nominal

waste value of half the detection limit of modern assay methods (0.0025 g/t).

The Gold estimation was completed using ordinary kriging. The search ellipsoid size used to estimate the

Au gra des was defined by the modelled variograms. Block grade estimation employed locally varying

anisotropy, which uses different rotation angles to define the principal directions of the variogram

model and search ellipsoid on a per -block basis. Blocks within estimation domains are assigned rotation

angles using a modelled 3D mineralization trend surface wireframe, which allows structural complexities

to be reproduced in the estimated block model. The number of variogram structures, contributions of

each structure, and their ranges are set per estimation domain and do not vary within the estimation

domain.

A total of 11,252 bulk density samples are available from the Golden Highway area drillhole database.

APEX personnel performed exploratory data analysis of the bulk density samples available and the

density was assigned for each deposit in the Golden Highway area. The density of the deposits ranged

from 2.7 g/cm 3 to 2.84 g/cm 3. The non -mineralized zones were assigned density based on lithological

unit. The modeled overburden was assigned a density of 1.8 g/cm3.

A total of 4,228 bulk density samples were available from the Garrison area drillhole database. APEX

personnel performed exploratory data analysis of the bulk density samples available and density was

assigned based on lithological unit. The density of the lithological units ranged from 2.77 g/cm 3 to 3.1

g/cm3. The modeled overburden was assigned a density of 1.8 g/cm3.

6

The resource is classified according to the CIM “Estimation of Mineral Resources an d Mineral Reserves

Best Practice Guidelines” dated November 29th, 2019 , and CIM “Definition Standards for Mineral

Resources and Mineral Reserves” dated May 10th, 2014. Mr. Dufresne believes the Tower Gold project

has the potential for future economic extraction. The unconstrained resource block model was

subjected to several open pit optimization scenarios and underground mining parameters. The following

criteria, detailed in Table 7 and Table 8, were considered reasonable and were utilized.

Table 7: Tower Gold, Parameters Used for Open Pit Resource Estimate

Parameters Unit Value

Gold Price US$/oz 1,750

Exchange Rate US$/C$ 0.78

Mill Recovery by Deposit

Discovery, Windjammer-North % 89.40

Windjammer-Central % 92.20

Windjammer-South % 94.10

South West % 93.33

Westaway, Westblock, 55 % 92.54

Bulk Rock Banded Iron Formation % 90

903 Formula

1-(0.0828*Head Grade Au Gpt

^ 0.4854)/Head Grade Au Gpt)

Jonpol – Non-Refractory % 92.54

Jonpol – Refractory % 56.20

Garrcon % 96.11

Mining Parameters

Sell Cost C$/oz 2.40

Royalties* % 0.00/1.50

Mining Cost - Rock C$/t mined 2.75

Mining Cost – Overburden C$/t mined 1.84

G&A Cost C$/t milled 1.00

Processing Cost C$/t milled 10.60

Pit Slope in Rock degrees 50

Pit Slope in Overburden degrees 25

Reporting Cut-Off Grade Au g/t 0.30

*Golden Highway area has no royalties and in the Garrison area royalties average 1.50%

For the open pit optimization, the estimation models were block averaged to a 5m x 5m x 5m SMU block

size and the blocks partially outside of the mineralized wireframes were diluted with a nominal waste

value of 0.0025 g/t based on the volume of block outs ide of the mineralized wireframes. The overall

strip ratio for the Golden Highway area and the Garrison area open pits was 4.8:1 and 5.2:1 respectively,

inclusive of overburden.

The calculated cut -off of 0.30 g/t Au was selected in reporting the open pit mineral resources in the

2022 resource estimates using the 5m x 5m x 5m SMU block size model.

7

Table 8: Tower Gold, Parameters Used for Underground Mineral Resource Estimate

Parameters Unit Value

Gold Price US$/oz 1,750

Exchange Rate US$/C$ 0.78

Mill Recovery % 92.00

Sell Cost C$/oz 2.40

Payable % 99.95

Royalties % 0.00/1.50

Mining Cost C$/t mined 75.00

G&A Cost C$/t milled 1.00

Processing Cost C$/t milled 10.60

Cut-Off Grade Au g/t 2.60

*Golden Highway area has no royalties and Garrison area royalties average 1.50%

The calculated cut-off of 2.60 g/t Au was selected in reporting the underground mineral resource in the

2022 resource estimates. Underground mineral resources below the resource open pit are constrained

by wireframe solids that encapsulate contiguous 2.5m x 2.5m x 2.5m underground blocks that are above

the 2.60 g/t Au cut-off with a volume greater than 1,400 m3.

Figure 1: Tower Gold Project: Mineral Resource Location Map

8

Figure 2: Tower Gold project: Mineral Resources- Isometric View to NW

Figure 3: Golden Highway Area: Mineral Resources- Plan View