Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

STLR.TO ·

Moneta Confirms Extensions of Gold Mineralization at 55

Exploration Programs

Moneta Confirms Extensions of Gold

Mineralization at 55

TORONTO

,

Aug. 6, 2020

/CNW/ -

Moneta Porcupine Mines Inc.

(TSX:ME) (OTC:MPUCF)

(XETRA:MOP)

("Moneta" or the "Company")

is pleased to announce the results from five (5) drill

holes testing the western and eastern extensions of the 55 deposit from the current drill program.

The 55 deposit forms part of the current NI 43-101 mineral resource estimate and the drill holes are

part of the 2019/2020 winter drill program completed on the Company's Golden Highway Project,

110 km east of

Timmins, Ontario

(Figure 1).

Highlights:

Drilling at 55 has confirmed gold mineralization over 4 km continuous strike from

Windjammer South to 55 including the South West deposit:

Confirmed the western extensions of gold mineralization up to

250 m

west and

150 m

to

the east of the current resource at 55:

MGH20-146: Intersected

11.48 m

@ 1.83

grams per tonne gold (g/t Au) including

2.60

m

@ 4.04 g/t Au, including

0.69 m

@ 11.60 g/t Au

MGH20-149A: Intersected

7.30 m

@ 1.24 g/t Au including

4.15 m

@ 2.07 g/t Au

MGH20-149: Intersected

5.63 m

@ 1.68 g/t Au including

1.00 m

@ 5.28 g/t Au

MGH20-157:

5.45 m

@ 1.61 g/t Au including

1.00 m

@ 3.56 g/t Au

MGH20-154: Intersected

5.00 m

@ 1.42 g/t Au including

0.60 m

@ 11.20 g/t Au

Confirmed mineralization over

600 m

at 55

"The drilling at the 55 deposit has intersected gold mineralization in large step-outs at 55 extending

the length of mineralization by over 400 metres," commented CEO and Chief Geologist Gary

O'Connor. "We have confirmed the extensions of flat dipping veins near surface and steeper veins at

depth further extending the overall footprint of mineralization at 55. The recently completed drill

program has now successfully confirmed continuous gold mineralization from 55 in the west to

Windjammer South in the east for over 4.0 km. We look forward to updating the mineral resource

estimate this year and to continuing to drill test the open extensions of mineralization."

The latest assay results are from the five (5) drill holes, plus one re-drill (MGH20-149A), completed

on the 2019/2020 winter drill program at the 55 deposit for a total of

2,259.0 m

(Table 2). The

drilling was testing the western and eastern extensions of shallow dipping gold zones beyond the

current NI 43-101 resource estimate. The 55 deposit currently hosts 35,000 ounces (oz) at a grade

of 5.11 g/t Au in 216,000 t in the indicated category and 45,300 oz of gold at a grade of 4.31 g/t Au

in 327,000 t in the inferred category at a cut-off grade of 3.00 g/t Au. The 2019/2020 winter drill

program consisting of 36 holes for

18,159.0 m

was successfully completed under COVID-19 work

safety protocols. The results of the drill program are now being used to update the mineral resource

estimates for the 55 and Windjammer South deposits and produce a maiden resource for the new

Westaway discovery, including the West Block zone.

Click here for Figure 1: 55 Deposit Location Map- Golden Highway Project

https://www.monetaporcupine.com/uploads/08-06-2020image3.jpg

Click here for Figure 2: 55 Deposit: Drill Plan Map

https://www.monetaporcupine.com/uploads/08-06-2020image2.jpg

Click here for Figure 3: 55 Deposit: Long-section View (looking north)

https://www.monetaporcupine.com/uploads/08-06-2020image4.png

55 Deposit Drill Results

Drill Hole

MGH20-146

and MGH20-was drilled up to

150 m

west of the current resource at 55 to

test the western and down plunge extensions of shallow dipping zones and steeper mineralized

structures beyond the current resource. The hole confirmed the extensions of all shallow dipping

zones and intercepted up to

9.03 m

@ 2.20 g/t Au, including

2.60 m

@ 4.04 g/t Au, including

0.69 m

@ 11.60 g/t Au and

0.65 m

@ 5.85 g/t Au from zone 5,

9.36 m

@ 0.90 g/t Au including

0.60 m

@

2.66 g/t Au from zone 9 and

1.79 m

@ 1.81 g/t Au including

0.88 m

@ 3.66 g/t Au from zone AB.

Drill holes

MGH20-149

and re-drill

MGH20-149A

were drilled from

50 m

to the west of the current

resource estimate at 55 to test for the western and down dip extensions of the shallow flat dipping

veins near surface and the steep veins at depth. Both holes stopped short of target depth. MGH20-

149A intersected up to

4.15 m

@ 2.07 g/t Au including

0.98 m

@ 5.63 g/t Au and MGH20-149

intersected

5.63 m

@ 1.68 g/t Au including

1.00 m

@ 5.28 g/t Au from zone 2.

Drill hole

MGH20-153

and

MGH20-157

were drilled on one section

250 m

to the west of the current

resource estimate at 55 to test for the western and down dip extensions of the shallow flat dipping

veins near surface and the steep veins at depth. MGH20-153 intersected up to

6.00 m

@ 1.24 g/t

Au including

1.00 m

@ 2.78 g/t Au from zone 12,

5.68 m

@ 0.85 g/t Au including

0.64 m

@ 3.23 g/t

Au from zone AB and

5.30 m

@ 0.94 g/t Au including

1.00 m

@ 4.84 g/t Au from a new vein.

MGH20-157 intersected up to

10.67 m

@ 0.76 g/t Au including

1.00 m

@ 3.85 g/t Au from zone 5,

5.70 m

@ 0.89 g/t Au including

1.00 m

@ 2.78 g/t Au from zone 7.

Drill hole

MGH20-154

was drilled up to

150 m

east of the current mineral resource at 55 to test the

up-dip extensions of the shallow dipping zones and steep structures. MGH20-154 intersected up to

5.00 m

@ 1.42 g/t Au including

0.60 m

@ 11.20 g/t Au from zone 8 and

6.70 m

@ 0.74 g/t Au

including

0.90 m

@ 4.29 g/t Au from a new zone extending the zones significantly to the east.

Table 1: 55 Deposit: Selected Significant Drill Results

Hole

From

To

Length

Au

Zone

(#)

(m)

(m)

(m)

(g/t)

(Name)

MGH20-146

160.00

169.03

9.03

2.20

5

includes

160.00

162.60

2.60

4.04

5

includes

161.31

162.00

0.69

11.60

5

and

164.35

166.00

1.65

3.87

5

includes

164.35

165.00

0.65

5.85

5

MGH20-146

259.14

268.50

9.36

0.90

9

includes

259.14

259.74

0.60

2.66

9

MGH20-149A

87.90

92.05

4.15

2.07

2

includes

89.50

90.48

0.98

5.63

2

MGH20-149

86.80

92.43

5.63

1.68

2

includes

90.00

92.00

2.00

3.85

2

includes

90.00

91.00

1.00

5.28

2

MGH20-153

322.50

328.50

6.00

1.24

12

includes

323.50

324.50

1.00

2.78

12

MGH20-153

488.50

493.80

5.30

0.94

New

includes

491.00

492.00

1.00

4.84

New

MGH20-154

252.00

257.00

5.00

1.42

8

includes

253.50

254.10

0.60

11.20

8

MGH20-154

480.90

487.60

6.70

0.74

New

includes

480.90

481.80

0.90

4.29

New

MGH20-157

78.89

83.45

4.56

1.92

4

includes

81.00

82.00

1.00

3.56

5

MGH20-157

98.00

108.67

10.67

0.76

5

includes

102.00

103.00

1.00

3.85

5

MGH20-157

158.50

164.20

5.70

0.89

7

includes

160.00

161.00

1.00

2.78

7

Intercepts are calculated using geological boundaries, a maximum of 3m internal dilution and no top cap applied. All intercepts are reported as drill widths and estimated to be 70%

to 95% of true widths

Table 2: Drill Hole Details

Hole

Easting

Northing

Elevation

Azimuth

Inclination

Depth

(#)

(mE)

(mN)

(masl)

(°)

(°)

(m)

MGH20-146

568968

5368750

323

110

-60

444.0

MGH20-149

568997

5368798

325

110

-62

114.0

MGH20-149A

568997

5368800

326

110

-60

192.0

MGH20-153

568857

5368723

324

110

-60

540.0

MGH20-154

569419

5368981

326

110

-60

615.0

MGH20-157

568942

5368698

324

110

-60

354.0

55 Deposit

The 55 deposit is located within a similar geological setting as the South West deposit (Figure 1).

Gold mineralization is seen to occur as a series of mineralized vein structures which occur adjacent

to the regional Timiskaming age banded iron formation "A" unit ("BIF-A"). The mineralized quartz-

pyrite veins occur as extensional vein structures associated with ankerite-sericite-silica-pyrite

alteration haloes. The zones occur as both stacked steeply west dipping NNW-SSE oriented

mineralized zones and as wider shallowly west dipping zones which potentially are open pit targets

(Figure 2). A total of 18 shallow dipping veins have been identified. A significant amount of historical

drilling has defined the mineralized zones (See Table 3). The 55 deposit currently hosts 35,000 oz at

a grade of 5.11 g/t Au in 216,000 t in the indicated category and 45,300 oz at a grade of 4.31 g/t Au

in 327,000 t in the inferred category at an underground mining cut-off grade of 3.00 g/t Au.

Table 3: 55 Deposit: Selected Significant Historical Drill Results

Hole

From

To

Length

Au

Zone

(#)

(m)

(m)

(m)

(g/t)

(name)

MA04-25

53.00

62.50

9.50

6.71

1

MN96-174

54.00

60.20

6.20

4.52

2

MN96-181

56.50

59.20

2.70

8.59

4

MA05-28

68.30

70.70

2.40

7.96

4

MA-08-43

80.90

83.80

2.90

42.29

5

M55-10-32

100.75

103.20

2.45

7.95

5

MA-08-49

127.00

164.00

37.00

7.78

6

MA-08-49

173.00

179.00

6.00

6.49

7

M55-10-20

217.10

220.20

3.10

7.96

7

MA-02-06

211.00

217.50

6.50

7.74

8

MA05-31

243.50

245.50

2.00

10.90

8

MA-05-30

245.30

250.50

5.20

7.92

9

M55-10-20

272.00

279.00

7.00

3.57

10

MN97-195

261.80

265.30

3.50

13.04

11

MA03-10X

311.80

314.00

2.20

8.42

AA

Intercepts are calculated using geological boundaries and no top cap applied. All intercepts are reported as drill widths and estimated to be 70% to 95% of true width

QA/QC Procedures

All core drilling conducted by Moneta is oriented. Drill core is cut with half sent to AGAT

Laboratories Inc. (AGAT) for drying and crushing to -2 mm, with a 1.00 kg split pulverized to -75 µm

(200#). AGAT is an ISO 17025 accredited laboratory. A 50 g charge is Fire Assayed and analyzed

using an AAS finish for Gold. Samples above 10.00 g/t Au are analyzed by Fire Assay with a

gravimetric finish and selected samples with visible gold or high-grade mineralization are assayed by

Metallic Screen Fire Assay on a 1.00 kg sample. Moneta inserts independent certified reference

material and blanks with the samples and assays routine pulp repeats and coarse reject sample

duplicates, as well as completing routine third-party check assays at Activation Laboratories Ltd.

Kevin Montgomery

, P.Geo. is a qualified person under NI 43-101 and has reviewed and approved

the technical contents of this press release.

About Moneta

The Company holds a 100% interest in 6 core gold projects strategically located along the Destor-

Porcupine Fault Zone in the Timmins Gold Camp with over 85 million ounces of past gold production.

The projects consist of the Golden Highway,

North Tisdale

, Nighthawk Lake,

DeSantis East

,

Kayorum and Denton projects. The Golden Highway Project covers 12 kilometres of prospective

ground along the DPFZ of which 4 km hosts the current 43-101 mineral resource estimate

comprised of an indicated resource of 556,500 ounces gold contained within 3.82 Mt @ 4.53 g/t Au

and a total of 1,174,000 ounces gold contained within 8.47 Mt @ 4.31 g/t Au in the inferred category

at a 3.00 g/t Au cut-off. A preliminary economic assessment on the South West deposit located

within the Golden Highway Project commenced in Q1, 2020. The results of the PEA are due to be

delivered later in 2020. The study will review several development scenarios for the South West

deposit which was the subject of a resource update in

November 2019

.

The Company's public documents may be accessed at

www.sedar.com

. For further information on

the Company, please visit our website at

www.monetaporcupine.com

or email us at

[email protected]

.

This news release includes certain forward-looking information and forward-looking statements,

collectively "forward-looking statements"

within the meaning of applicable Canadian securities

legislation.

Forward-looking statements are frequently identified by such words as "may", "will",

"plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and

results. Forward-looking statements include, but are not limited to information with respect to the

future performance of the business, its operations and financial performance and condition such

as the Company's drilling program and the timing and results thereof; and the ability of the

Company to finance and carry out its anticipated goals and objectives.

Forward-looking statements are based on the current opinions and expectations of management.

All forward-looking information is inherently uncertain and subject to a variety of assumptions,

risks and uncertainties, including the speculative nature of mineral exploration and development,

fluctuating commodity prices, competitive risks and the availability of financing, as described in

more detail in our recent securities filings available at

www.sedar.com

. Actual events or results

may differ materially from those projected in the forward looking-statements and we caution

against placing undue reliance thereon. We assume no obligation to revise or update these

forward-looking statements.

SOURCE

Moneta Porcupine Mines Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/August2020/06/c2979.html

%SEDAR: 00003301E

For further information:

Gary V. O'Connor, CEO and Chief Geologist, 416-357-3319; Ian C.

Peres, President and CFO, 416-579-3040; Linda Armstrong, Investor Relations, 647-456-9223

CO: Moneta Porcupine Mines Inc.

CNW 07:00e 06-AUG-20