Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

STLR.TO ·

Moneta Commences Drill Program at Golden Highway Symbol: TSX: ME

Exploration Programs

Moneta Commences Drill Program at Golden

Highway

Symbol: TSX: ME

TORONTO

,

Oct. 31, 2019

/CNW/ -

Moneta Porcupine Mines Inc. (TSX:ME) (OTC:MPUCF)

(XETRA:MOP) ("Moneta" or the "Company")

is pleased to announce the commencement of

drilling on the Golden Highway Project, located 110 km east of

Timmins, Ontario

(see Figure 1).

Highlights:

Windjammer South Deposit: Drilling is targeting the resource expansion potential

55 Deposit: Drilling is planned to test the newly identified resource expansion potential

Westaway: Drilling is to confirm the occurrence of mineralization historically intersected

West Block: Drilling to test the western extensions of mineralization at West Block

Halfway: Drilling is planned to confirm mineralization intersected in historical drilling

South West: Resource update pending for the +1

Moz South West

deposit

Gary O'Connor

, CEO & Chief Geologist commented, "We are encouraged by our enhanced

understanding of the geology of the Windjammer South and 55 deposits where we have identified

the potential to expand the current resources. The new drill program will test the resource expansion

potential at 55 and Windjammer South which occur adjacent to the South West, where we are

currently updating the resource based on our 2019 (

9,600 m

) drill program. The current drill program

will also test the Westaway and Halfway targets where mineralization was intersected historically

and will target the area between West Block and Westaway which remains open. We look forward

to drilling the expansion potential of our resources and to test new areas of mineralization. In

addition, we will be releasing the updated South West resource estimate by the end of November"

The current planned drill program consists of an initial

10,000 m

to test the new resource potential

and occurrence of mineralization at new targets, with additional drilling planned as warranted.

Windjammer South Deposit:

Currently hosts 0.35MMt @ 4.19 g/t Au containing 34,500 oz in the

indicated category and 0.17MMt @ 4.59 g/t Au containing 25,500 oz in the inferred category. The

current drill program is designed to test newly identified potential both down-dip and up-dip of the

current resource.

"55" Deposit:

Currently hosts 0.22MMt @ 5.11 g/t Au containing 35,400 oz in the indicated

category and 0.33MMt @ 4.31 g/t Au containing 45,300 oz in the inferred category. Drilling is

planned to test the depth and strike extensions of newly defined potential.

West Block Extensions:

Drilling conducted in the 2019 drill program at West Block intersected

new veins which will not be included in the new resource update due to insufficient data. This

includes the WB-10 vein drilled in hole MGH19-121 which intersected

1.05 m

@ 18.25 g/t Au (see

press release ME PR 12-209, dated

August 01, 2019

). Drilling will test the continuity of the new

veins and test for additional mineralization located between West Block and Westaway.

Westaway Target:

Drilling at Westaway is to test the newly interpreted mineralization potential

intersected in historical drilling which returned up to

6.30 m

@ 5.80 g/t Au, including

1.50 m

@ 10.42

g/t Au in hole MN-96-178 (see press release ME PR 18-2018, dated

December 05

, 2018).

Halfway Target:

Drilling at Halfway is designed to test the mineralization potential intersected in

historical hole MWJ11-43 which intersected

3.25 m

@ 8.87 g/t Au, including

2.30 m

@ 11.74 g/t Au

(see press release ME PR 18-2018, dated

December 05, 2018

).

Click here for Figure 1: Golden Highway Project: Geology and Location of Deposits and Targets

https://www.monetaporcupine.com/uploads/2019-10-31-me-fig1.jpg

About Moneta

The Company holds a 100% interest in 6 core gold projects strategically located along the Destor-

Porcupine Fault Zone in the Timmins Gold Camp with over 85 million ounces of past gold production.

The projects consist of the Golden Highway,

North Tisdale

, Nighthawk Lake,

DeSantis East

,

Kayorum and Denton projects. The Golden Highway Project covers 12 kilometres of prospective

ground along the DPFZ of which 4 km hosts the current 43-101 mineral resource estimate

comprised of an indicated resource of 383,400 ounces gold contained within 2.59 Mt @ 4.61 g/t Au

and a total of 873,200 ounces gold contained within 6.46 Mt @ 4.21 g/t Au in the inferred category

at a 3.00 g/t Au cut-off.

Gary O'Connor

, FAusIMM is a qualified person under NI 43-101 and has reviewed and approved the

contents of this press release.

The Company's public documents may be accessed at

www.sedar.com

. For further information on

the Company, please visit our website at

www.monetaporcupine.com

or email us at

[email protected]

.

This news release includes certain forward-looking information and forward-looking statements,

collectively "forward-looking statements"

within the meaning of applicable Canadian securities

legislation.

Forward-looking statements are frequently identified by such words as "may", "will",

"plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and

results. Forward-looking statements include, but are not limited to information with respect to the

future performance of the business, its operations and financial performance and condition such

as the Company's drilling program and the timing and results thereof; and the ability of the

Company to finance and carry out its anticipated goals and objectives.

Forward-looking statements are based on the current opinions and expectations of management.

All forward-looking information is inherently uncertain and subject to a variety of assumptions,

risks and uncertainties, including the speculative nature of mineral exploration and development,

fluctuating commodity prices, competitive risks and the availability of financing, as described in

more detail in our recent securities filings available at

www.sedar.com

. Actual events or results

may differ materially from those projected in the forward looking-statements and we caution

against placing undue reliance thereon. We assume no obligation to revise or update these

forward-looking statements.

SOURCE

Moneta Porcupine Mines Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/October2019/31/c1567.html

%SEDAR: 00003301E

For further information:

Gary V. O'Connor, CEO and Chief Geologist, 416-357-3319; Ian C.

Peres, President and CFO, 416-579-3040

CO: Moneta Porcupine Mines Inc.

CNW 08:00e 31-OCT-19