Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

STGO.TO ·

Steppe Gold Limited (TSX: STGO) – Development & Financing Update 1 rbc TSX Symbol: STGO Total Basic Shares O/S (M): 41.5 MATTHEW WOOD Chairman, President and CEO BATAA TUMUR-OCHIR Director and Executive Vice President Mongolia

Financings

Steppe Gold Limited (TSX: STGO) – Development & Financing Update

1

rbc

TSX Symbol: STGO

Total Basic Shares O/S (M): 41.5

MATTHEW WOOD

Chairman, President and CEO

BATAA TUMUR-OCHIR

Director and Executive Vice President Mongolia

ANEEL WARAICH

Director and Executive Vice President

PATRICK MICHAELS

Director

DR. ZAMBA BATJARGAL

Director

LEWIS MARKS

Director

SHELDON VANDERKOOY

Director

CONTACT INFORMATION

THE COMPANY’S HEAD OFFICE:

Shangri-La office, Suite 1201, Olympic street

19A, Sukhbaatar District 1,

Ulaanbaatar 14241, Mongolia

Tel: +976 7732 1914

TORONTO OFFICE:

90 Adelaide Street. W, Suite 400 Toronto, ON

M5H 3V9,

Canada

Tel: +1 647 697 0577

TRANSFER AGENT:

Lori Winchester

Senior Relationship Manager, Client

Management

Phone: +1 416 607-7898

Cell: +1 416 671-4558

Email: [email protected]

1 US to Canada Exchange rate from XE.com as at April 24, 2019 (US$1 = C$1.34965)

Toronto, ON – Steppe Gold Limited (TSX: STGO) (the “Company” or “Steppe

Gold”) is pleased to provide an update on its progress in Mongolia.

The Company has been mining since November 2018 and has completed Phase I

mining with 230,000 tonnes mined. It is now moving rapidly to completion of the

ADR plant, ahead of first gold in H2 2019.

The majority of the capital expenditure has been incurred and the project remains

under budget. At April 1, 2019, the Company had approximately US$2.7m

(C$3.641) cash on hand. To ensure the Company is properly capitalized through to

production, the Company believes it to be prudent to strengthen the balance

sheet.

Accordingly, the Company announces t oday that it is conducting a non -brokered

private placement of a minimum of US$5.0m (C$6.75m) aggregate principal

amount of unsecured convertible debentures. This financing also allows Steppe

Gold to proceed with a summer exploration program on the ATO -4-Mungu trend

as well as the trenching and drilling program on the four discoveries made on our

highly prospective Uudam Khundii Project in Bayankhongor Province, in the south

west of the country.

The convertible debentures will bear interest from the date of closing at 10% per

annum, calculated and payable semi -annually in arrears and will mature on the

date that is three years from the date of issue. The convertible debentures will be

convertible at the option of the holder into common shares of the Company (the

“Common Shares”) at any time prior to maturity at a conversion price of C$0.90

per Common Share. The offering is subject to TSX approval and is expected to close

on or about May 24, 2019.

The Company can confirm that it has firm commitments for the private placement

from European investors for approximately US$5.0m (C$6.75m). This financing

keeps the Company fully funded into production.

Development Update

Mining and Crushing

The Company has now completed Phase I mining with a total of 230,000 tonnes

of ore and no waste being mined resulting in a zero strip ratio. The lack of waste

has been a considerable bonus to the Company as we have significantly higher

modelled gold grades on the Phase I mining program. Total mined gold grade for

the Phase I mining program was 2.3 g/t gold equating to approximately 17,000oz

of gold stacked on the pad for leaching. The Company is modelling a leach recovery

for gold of 70% which wo uld equate to approximately 12,000 oz of recoverable

gold on the pad and available for leaching.

CAPITALIZATION

BOARD OF DIRECTORS

TSX: STGO

April 29, 2019

Steppe Gold Limited (TSX: STGO) – Development & Financing Update

TSX: STGO

DEVELOPMENT & FINANCING UPDATE

April 29, 2019

2

Leach Pad and Ponds

Cells 1 and 2 lining has now been completed. Initial ore stacking on cell 1 will continue for a further 10 days when Phase I ore

mined will all be crushed and stacked for leaching. Both barren and pregnant ponds have been lined and pumps will be

installed in the coming week. The storm water pond has also been completed and lined. The 800mm solution return pipe

and the 500mm irrigation pipes have been installed. The 300mm water bore pipe to the ponds will be completed in early-

mid May.

ADR Plant

The construction of the ADR facility building continues, with all steel installed and foundation concrete poured. Sandwich

panels and roofing panels are currently being installed. All ADR facility equipment is on site and is being installed with the

assistance of the manufacturer. Carbon columns, chemical mixing tanks and elution circuit platforms are now in place and

connection of facilities is now underway. The Company has now successfully completed and tested two water bores MTB03

and MTB04. MTB04 being 100 meters from the plant with a flow rate of 6.8 l/sec (facility requires 5.5 l/sec). MTB03

will be utilised as a backup bore and has a flow rate of 5.0l/sec.

“We are pleased with the progress the team continue s to make and are highly encouraged by the results of the Phase I

mining program,” said Matthew Wood, President and CEO of the Company . “The updates above as well as the upcoming

milestones bring us significantly closer to first gold production. The funds being raised in the current convertible debenture

are a vote of confidence in the team at Steppe Gold and the quality of our assets.”

A selection of photos has been included demonstrating activities on site:

ADR Plant in foreground, Cell 1 & 2 in background (right), ponds in background (left) – March 18, 2019

Steppe Gold Limited (TSX: STGO) – Development & Financing Update

TSX: STGO

DEVELOPMENT & FINANCING UPDATE

April 29, 2019

3

ADR Plant, storm water, barren and impregnated ponds (back center), cell 1 & 2 (right) – April 25, 2019

… more overleaf …

Steppe Gold Limited (TSX: STGO) – Development & Financing Update

TSX: STGO

DEVELOPMENT & FINANCING UPDATE

April 29, 2019

4

Storm water pond (left), barren and impregnated ponds (center), Cell 1 & 2 (right) – April 25, 2019

… more overleaf …

Steppe Gold Limited (TSX: STGO) – Development & Financing Update

TSX: STGO

DEVELOPMENT & FINANCING UPDATE

April 29, 2019

5

Cell 1 & 2 – April 25, 2019

… more overleaf …

Steppe Gold Limited (TSX: STGO) – Development & Financing Update

TSX: STGO

DEVELOPMENT & FINANCING UPDATE

April 29, 2019

6

ADR plant showing erected and installed carbon columns (background) – April 25, 2019

Qualified Person

Technical information in this press release not contained in the Technical Report has been reviewed and approved by

Enkhtuvshin Khishigsuren, Certified Professional Geologist from AIPG, certification number CPG -11964, Vice President of

Exploration, and a “qualified person” under NI 43-101.

ABOUT STEPPE GOLD LTD.

Steppe Gold is a precious metals development company with an aggressive growth strategy to build Steppe Gold

into the premier precious metals company in Mongolia. The Company owns 100% of the advanced staged Altan

Tsaagan Ovoo Gold Project where a heap leach development is currently being completed. The second

development phase of the ATO Project is the construction of an approximate 150,000oz per annum CIL operation

and this is currently subject to the completion of a feasibility study. The Company is also working on the completion

of a new resource for the ATO project which will include the new high grade Mungu Discovery.

Steppe Gold Limited (TSX: STGO) – Development & Financing Update

TSX: STGO

DEVELOPMENT & FINANCING UPDATE

April 29, 2019

7

Cautionary Note Regarding Forward-Looking Statements:

The above contains forward -looking statements that are subject to a number of known and unknown risks,

uncertainties and other factors that may cause actual results to differ materially from those anticipated in our

forward-looking statements. Factors that could cause such differences include: changes in world commodity

markets, equity markets, costs and supply of materials relevant to the mining industry, change in government and

changes to regulations affecting the mining industry. Forward -looking statements in this release include, among

other things, statements regarding the trading of the Common Shares and business, economic, and political

conditions in Mongolia. Although we believe the expectations reflected in our forward -looking statements are

reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or

achievements. We disclaim any intention or obligati on to update or revise any forward -looking statements

whether as a result of new information, future events or otherwise, except as required by applicable law.