Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SSV.V ·

Southern Silver Confirms New Gold Zone at Cerro Las Minitas with a 28.5 Metre Intercept Averaging 1.41g/t Au and 36g/t Ag, (201g/t AgEq)

Drill Results

Southern Silver Confirms New Gold Zone at

Cerro Las Minitas with a 28.5 Metre Intercept

Averaging 1.41g/t Au and 36g/t Ag, (201g/t

AgEq)

Vancouver, British Columbia--(Newsfile Corp. - December 16, 2020) -

Southern Silver Exploration

Corp. (TSXV: SSV) (OTCQB: SSVFF) ("Southern Silver")

reported today further assay results from

its 10,000 metre 2020-21 core drilling program on the

Cerro Las Minitas project

, Durango State,

Mexico. These early results from the Mina La Bocona target include a near surface interval of strongly

gold-enriched oxidized mineralization and a deeper poly-metallic sulphide zone from hole 20CLM-125

which returned:

a

28.5m down hole interval averaging 1.41g/t Au and 36g/t Ag (201g/t AgEq)

including a

higher grade

2.8m interval averaging 5.1g/t Au and 72g/t Ag (552 AgEq)

starting at 23.8m

down-hole; and

a

6.1m down-hole interval (4.0m est. TT) averaging 421g/t Ag, 0.45g/t Au, 5.5% Pb and

1.9% Zn (704g/t AgEq; 17.9% ZnEq)

including a higher grade

0.9m (0.6m est. TT) grading

1420g/t Ag, 0.64g/t Au, 16.8% Pb and 0.6% Zn (2012g/t AgEq; 51.0% ZnEq)

starting at 221.8

metres down-hole.

The upper gold-enriched oxide zone in hole 20CLM-125 correlates well with a previously reported oxide

gold zone from hole

15CLM-078

with

7.8m (3.9m est. TT)

averaging

13.5g/t Au, 37g/t Ag, 2.2% Pb

and 1.7% Zn

(1093g/t AgEq (see NR-10-15)

and a deeper gold-enriched sulphide zone from hole

15CLM-082

with

10.1m (4.8m est. TT)

averaging

1.4g/t Au and 88g/t Ag, 1.6% Pb and 2.1% Zn

(378g/t AgEq) (see NR14-15)

which together form a new gold-enriched oxide/sulphide target well

outboard of the Central Intrusion and extending 120 metres along strike and up to 168 metres in depth.

Mineralization is open to the southeast and at depth. Additional sampling has been completed both up

hole and down hole of the oxide gold intervals in each of holes 20CLM-125 and 15CLM-078 to

determine the full extent of the gold anomaly in each of these holes. Assays are pending.

The deeper silver-enriched polymetallic zone in hole 20CLM-125 is contained within the upper 19.8

metres of a semi-continuous mineralized zone extending from 216.8 metres to 272.0 metres downhole

and is an approximate 25 metre down-dip step-out of similar mineralization first identified in the 2015

hole

15CLM-078

with

16.5m (8.2m est. TT)

averaging

0.5g/t Au, 150g/t Ag, 3.7% Pb and 0.7% Zn

(325g/t AgEq) (

see NR-10-15; October 1, 2015). Assays for the remaining 35 metres of the 55.2 metres

mineralized interval are pending.

As well, two additional holes have been completed in this part of the Bocona Target and a further four

holes tested the down-dip projection of the La Bocona chimney located approximately 135 metres to the

northwest. Seven holes totaling 2,470 metres have now tested the Mina La Bocona target area with

assays still pending from each hole.

Rob Macdonald, Vice President Exploration stated:

"The confirmation of a shallow and potentially

high-grade gold target continues to highlight the terrific exploration potential on the east side of the

Cerro in the area of the historic Mina La Bocona chimney which was mined and developed by

artisanal miners to more than 200 metres in depth and produced up to an estimated 400,000 tonnes

of ore. Further drilling in the New Year will continue to test and extend this zone as it projects to the

southeast and to depth. This new drilling has also confirmed the extension of high-grade polymetallic

mineralization from hole 15CLM-078 providing yet another target for follow-up in 2021."

Approximately 7,500 metres of drilling have now been completed of the anticipated 10,000 metres of

core drilling for the 2020-21 exploration program. Drilling has paused for the Christmas break and will

continue early in January with one drill focused on the Mina La Bocona target and a second drill

exploring the South Skarn target.

Figure 1: Plan Map of the Area of the Cerro showing the distribution of the CLM deposits and

the location for new drill targeting, at the Mina La Bocona, South Skarn and Las Victorias

targets.

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/5344/70431_dd630291c41c880b_002full.jpg

Drilling on the east side of the Cerro will test an approximate 800 metre strike length of the South Skarn

Target and Mina La Bocona Target mineralized zones to depths of up to 650 metres as well as a high-

grade hanging wall zone in the Mina La Bocona Target area. These drill targets are designed to

increase the current mineral resource estimate of 24 million tonnes

by approximately 30%.

The CLM Project remains one of the larger undeveloped silver-lead-zinc projects in the World and is

wholly owned, unburdened by royalties, fully financed and fully permitted.

Table 1: Select Assay intervals from Drill Hole 20CLM-125

Hole #

From

To

Interval

Est Tr Thck

Ag

Au

Cu

Pb

Zn

AgEq

ZnEq

Notes

(m)

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

(%)

(g/t)

(%)

Mina La Bocona Target

20CLM-125

23.8

52.25

28.5

UNK

36

1.41

0.02

0.7

0.6

201

5.1

0.5g/t Au

Cutoff

inc.

31.35

34.1

2.8

UNK

72

5.09

0.08

1.0

0.5

552

14.0

Open

Ended

and inc.

48.9

52.25

3.4

UNK

57

2.59

0.03

1.2

1.7

377

9.6

20CLM-125

135

138.05

3.1

UNK

17

0.66

0.03

0.8

0.5

122

3.1

20CLM-125

216.75

236.55

19.8

13.0

183

0.25

0.03

2.3

0.8

308

7.8

24.5%

dilution

inc.

221.75

227.8

6.1

4.0

421

0.45

0.01

5.5

1.9

704

17.9

Open at

depth

inc.

223.65

224.55

0.9

0.6

1420

0.64

0.01

16.7

0.6

2012

51.0

Table 2: Previously Reported 2020 Assay Results from the South Skarn and Las Victorias

Target areas

Hole #

From

To

Interval

Est Tr Thck

Ag

Au

Cu

Pb

Zn

AgEq

ZnEq

Notes

(m)

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

(%)

(g/t)

(%)

Previously Reported South Skarn Assay Results

20CLM-118

170.1

177.0

6.9

4.0

109

0.14

0.02

1.8

2.1

259

6.6

27.50%

inc.

174.2

175.4

1.2

0.9

412

0.14

0.06

7.8

9.2

1033

26.2

and

188.8

190.0

1.1

0.8

132

0.12

0.02

2.8

2.0

308

7.8

20CLM-119

95.0

96.5

1.5

1.1

54

2.83

0.01

3.6

0.4

417

10.6

and

206.4

210.7

4.3

3.2

99

0.27

0.01

0.7

0.6

165

4.2

41.9%

dilution

inc.

206.4

207.6

1.2

0.9

216

0.22

0.01

0.8

0.1

265

6.7

and

226.1

235.1

9.0

6.7

625

0.11

0.03

11.8

7.5

1298

32.9

40.8%

dilution

inc.

226.1

228.4

2.3

1.7

1338

0.15

0.04

25.9

17.6

2849

72.3

and inc.

232.0

233.3

1.3

0.9

1480

0.09

0.04

26.5

16.8

2973

75.4

and

241.5

243.0

1.6

1.2

112

0.07

0.02

2.2

2.1

272

6.9

20CLM-120

343.8

345.7

1.9

1.4

101

0.08

0.00

0.9

0.2

145

3.7

and

429.0

432.6

3.7

2.7

511

0.10

0.13

5.0

3.7

835

21.2

inc.

431.8

432.6

0.9

0.6

902

0.05

0.16

7.8

8.4

1496

37.9

and

441.0

442.3

1.3

1.0

51

0.07

0.06

1.5

1.1

153

3.9

and

450.8

452.9

2.1

1.6

182

0.23

0.21

4.4

4.1

522

13.2

20CLM-122

390.7

391.9

1.2

0.9

97

0.18

0.01

0.2

0.2

124

3.1

and

417.8

419.0

1.2

0.9

247

0.19

0.07

4.7

1.2

463

11.7

and

435.0

442.8

7.8

5.8

66

0.05

0.02

0.4

0.2

92

2.3

39.4%

dilution

inc.

442.1

442.8

0.6

0.5

237

0.07

0.02

0.9

0.2

281

7.1

20CLM-124

397.2

402.1

5.0

3.3

304

0.11

0.18

4.8

1.9

555

14.1

inc

400.1

401.0

0.8

0.6

607

0.15

0.49

11.0

3.4

1146

29.1

and

475.0

490.6

15.6

10.4

172

0.08

0.15

3.8

3.7

458

11.6

31.1%

Dilution

inc.

475.0

483.7

8.7

5.8

286

0.11

0.27

6.4

5.8

749

19.0

inc.

475.0

475.9

0.9

0.6

975

0.05

1.27

21.2

18.5

2503

63.5

and

498.0

499.9

1.9

1.2

303

0.05

0.02

7.1

5.8

755

19.2

inc.

499.0

499.9

0.9

0.6

544

0.05

0.02

13.1

9.1

1313

33.3

Hole #

From

To

Interval

Est. Tr.

Thck.

Ag

Au

Cu

Pb

Zn

AgEq

ZnEq

Notes

(m)

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

(%)

(g/t)

(%)

Previously

Reported

Las

Victorias

20CLM-121

678.6

679.1

0.5

0.4

155

1.79

2.28

0.1

22.8

1460

37.0

and

682.6

683.4

0.9

0.7

51

0.02

0.29

0.1

3.0

204

5.2

and

685.9

687.6

1.8

1.4

188

0.07

0.53

0.2

4.1

420

10.7

20CLM-123

134.6

140.8

6.2

4.3

33

0.94

0.00

0.3

0.4

136

3.4

and

199.3

205.3

5.9

4.1

63

1.58

0.07

0.8

0.9

259

6.6

Analyzed by FA/AA for gold and ICP-AES by ALS Laboratories, North Vancouver, BC. Silver

(>100ppm), copper, lead and zinc (>1%) overlimits assayed by ore grade ICP analysis, High silver

overlimits (>1500g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav. High Pb (>20%) and

Zn (>30%) overlimits assayed by titration. AgEq and ZnEq were calculated using average metal prices

of: US$20/oz silver, US$1650/oz gold, US$3.25/lbs copper and US$0.9/lbs lead and US$1.15/lbs zinc.

AgEq and ZnEq calculations did not account for relative metallurgical recoveries of the metals. Ore-

grade composites calculated using a 80g/t AgEq cut-off and <20% internal dilution, except where noted;

anomalous intercepts calculated using a 10g/t AgEq cut-off.

Cerro Las Minitas Project

The Cerro Las Minitas project is an advanced exploration stage polymetallic Ag-Pb-Zn-Cu Skarn/CRD

project located in southern Durango, Mexico.

The Cerro Las Minitas project as of May 9

th

, 2019 contains a Mineral Resource Estimate, at a 175g/t

AgEq cut-off, of

(1)

Indicated - 134Moz AgEq:

37.5Moz Ag, 40Mlb Cu, 303Mlb Pb and 897Mlb Zn

Inferred - 138Moz AgEq

: 45.7Moz Ag, 76Mlb Cu, 253Mlb Pb and 796Mlb Zn

A total of 133 drill holes for 59,000 metres have been completed on the CLM Project with exploration

expenditures of approximately US$25.5 million equating to exploration discovery costs of approximately

C$0.09 per AgEq ounce to the end of 2019.

About Southern Silver Exploration Corp.

Southern Silver Exploration Corp. is an exploration and development company with a focus on the

discovery of world-class mineral deposits. Our specific emphasis is the 100% owned Cerro Las Minitas

silver-lead-zinc project located in the heart of Mexico's Faja de Plata, which hosts multiple world-class

mineral deposits such as Penasquito, Los Gatos, San Martin, Naica and Pitarrilla. We have assembled

a team of highly experienced technical, operational and transactional professionals to support our

exploration efforts in developing the Cerro Las Minitas project into a premier, high-grade, silver-lead-zinc

mine. The Company engages in the acquisition, exploration and development either directly or through

joint-venture relationships in mineral properties in major jurisdictions. Our property portfolio also includes

the Oro porphyry copper-gold project located in southern New Mexico, USA.

1

.

The 2019 Cerro Las Minitas Resource Estimate was prepared following CIM definitions for classification of Mineral Resources. Resources

are constrained using mainly geological constraints and approximate 10g/t AgEq grade shells. The block models are comprised of an array

of blocks measuring 10m x 2m x 10m, with grades for Au, Ag, Cu, Pb, Zn values interpolated using ID3 weighting. Silver and zinc equivalent

values were subsequently calculated from the interpolated block grades. The model is identified at a 175g/t AgEq cut-off, with an indicated

resource of 11,102,000 tonnes averaging 105g/t Ag, 0.10g/t Au, 1.2% Pb, 3.7% Zn and 0.16% Cu and an inferred resource of 12,844,000

tonnes averaging 111g/t Ag, 0.07g/t Au, 0.9% Pb, 2.8% Zn and 0.27% Cu. AgEq cut-off values were calculated using average long-term

prices of $16.6/oz. silver, $1,275/oz. gold, $2.75/lb. copper, $1.0/lb. lead and $1.25/lb. zinc. Metal recoveries for the Blind, El Sol and Las

Victorias deposits of 91% silver, 25% gold, 92% lead, 82% zinc and 80% copper and for the Skarn Front deposit of 85% silver, 18% gold,

89% lead, 92% zinc and 84% copper were used to define the cut-off grades. Base case cut-off grade assumed $75/tonne operating,

smelting and sustaining costs. All prices are stated in $USD. Silver Equivalents were calculated from the interpolated block values using

relative recoveries and prices between the component metals and silver to determine a final AgEq value. The same methodology was used

to calculate the ZnEq value. Mineral resources are not mineral reserves until they have demonstrated economic viability. Mineral resource

estimates do not account for a resource's mineability, selectivity, mining loss, or dilution. The current Resource Estimate was prepared by

Garth Kirkham, P.Geo. of Kirkham Geosciences Ltd. who is the Independent Qualified Person responsible for presentation and review of the

Mineral Resource Estimate. All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to

add precisely.

Robert Macdonald, MSc. P.Geo, is a Qualified Person as defined by National Instrument 43-101 and

supervised directly the collection of the data from the CLM Project that is reported in this disclosure and

is responsible for the presentation of the technical information in this disclosure.

On behalf of the Board of Directors

"Lawrence Page"

Lawrence Page, Q.C.

President & Director, Southern Silver Exploration Corp.

For further information, please visit Southern Silver's website at

southernsilverexploration.com

or contact

us at 604.641.2759 or by email at

[email protected]

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This news release contains forward-looking statements. Forward-looking statements address future

events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ

materially from those currently anticipated in such statements. Factors that could cause actual results

to differ materially from those in forward-looking statements include the timing and receipt of

government and regulatory approvals, and continued availability of capital and financing and general

economic, market or business conditions.

Southern Silver Exploration Corp. does not assume any

obligation to update or revise its forward-looking statements, whether as a result of new information,

future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/70431