Southern Silver Announces a Significant Increase to the Mineral Resource at Cerro Las Minitas To: Indicated 137Mozs AgEq or 2.3Blbs ZnEq: 42.1Mozs Ag, 358Mlbs Pb, and 895Mlbs Zn; and Inferred 198Mozs AgEq or 3.3Blbs ZnEq: 73.6Mozs Ag, 500Mlbs Pb, and 1,009Mlbs Zn

Resource Estimates

Southern Silver Announces a Significant

Increase to the Mineral Resource at Cerro Las

Minitas

To: Indicated 137Mozs AgEq or 2.3Blbs ZnEq: 42.1Mozs Ag, 358Mlbs Pb, and 895Mlbs Zn;

and

Inferred 198Mozs AgEq or 3.3Blbs ZnEq: 73.6Mozs Ag, 500Mlbs Pb, and 1,009Mlbs Zn

Vancouver, British Columbia--(Newsfile Corp. - October 27, 2021) -

Southern Silver Exploration

Corp. (TSXV: SSV) ("Southern")

reports that Kirkham Geosystems Ltd. ("KGL") has completed an

update of its independent Mineral Resource Estimate on the

Cerro Las Minitas

("CLM") project in

Durango State, Mexico. The updated Mineral Resource estimate features increased sulphide resources

from two new mineral deposits, a small oxide resource in one of the new deposit areas and an update of

the previously reported deposits utilizing new metal pricing and metallurgical recoveries. Resource

reporting now utilizes a Net Smelter Return ("NSR") cut-off, as detailed in Table 1, and reports average

grades on a AgEq, ZnEq and $US/t NSR basis.

President Lawrence Page Q.C. stated,

"This is a most welcome milestone in the progress of our

company's development of the Cerro Las Minitas silver-lead-zinc property. In Mexican folklore, the

property has been known as the hill of mines - discrete claims exploited by several artisanal miners

over the years utilizing basic exploration and mining methods. Since the purchase of the claims in

late 2010 we have spent some $30 million in acquisition, exploration and development culminating in

the identification of one of the largest undeveloped silver-based resources in the world."

"It is important to note that our company owns a 100% interest in all claims comprising CLM with no

NSR or other burdens."

"Exploration continues at CLM while a third party authored Preliminary Economic Assessment is

prepared for release in Q2 2022. This report will inform on potential mining scenarios, design, metal

processing flowsheet, capital requirements, costs and cashflow for the project. It is the next milestone

in the evolution of a prospect into a mine."

"Drilling will soon commence at our Oro copper-gold project in New Mexico with the permitting

process nearing completion and we expect to explore and develop a number of promising targets

identified through a previous geophysics program."

Cerro Las Minitas Resource Model Highlights:

Compared to the 2019 Mineral Resource estimate, the 2021 update, at a US$60/t NSR cut-off, features:

A

1.2Mt

increase in

Indicated Mineral Resources

to

12.3Mt averaging 106g/t Silver, 0.1g/t

Gold, 0.2% Copper, 1.3% Lead and 3.3% Zinc (347g/t AgEq; 8.4% ZnEq)

equalling a

US$130/t NSR value,

containing:

42.1 million ounces of silver; 28 thousand ounces of gold; 44 million pounds of copper, 358 million

pounds of lead; and 895 million pounds of zinc.

This equates to

137 million ounces silver equivalent or 2.3 billion pounds zinc equivalent;

and

A

6.8Mt

increase in

Inferred Mineral resources

to

19.6Mt averaging 117g/t Silver, 0.1g/t

Gold, 0.2% Copper, 1.2% Lead and 2.3% Zinc (314g/t AgEq; 7.6% ZnEq)

equalling a

US$123/t NSR value

containing:

73.6 million ounces of silver; 78 thousand ounces of gold; 98 million pounds of copper, 500 million

pounds of lead; and 1,009 million pounds of zinc (1Blbs Zn).

This equates to

198 million ounces silver equivalent or 3.3 billion pounds zinc equivalent.

The new Resource Estimate incorporates an additional 20,991 metres of core drilling completed in

2020-21, updated metal recoveries and pricing and the incorporation of over 1,127 metres of specific

gravity ("SG") measurements.

Cerro Las Minitas Project Highlights:

The updated NI43-101 Mineral Resource estimate significantly increases the size of the resource

on a tonnage basis by approximately 33%, with most of the increase resulting from the addition

and delineation of the La Bocona and the South Skarn deposits;

Newly added resources in the

La Bocona deposit

total

1.6Mt Indicated averaging 302g/t

AgEq

or

US$136/t NSR

and

1.1Mt Inferred averaging 293g/t AgEq

or

US$117/t NSR

;

Newly added resources in the

South Skarn deposit

total

3.8Mt Inferred averaging 309g/t

AgEq or US$130/t NSR

;

The Mineral Resource update features a significant increase in contained silver in both the

indicated and inferred categories which now total

Indicated: 42.1Mozs Silver

and

Inferred: 73.6

Mozs Silver

representing an approximate 38% increase from the 2019 resource estimate;

The new deposits have a much stronger Silver-Lead bias resulting in generally higher overall NSR

values for the South Skarn and the Indicated component of the La Bocona resource estimates

compared to previous resource estimates. Similarly, silver maintains a higher proportion of the

overall metal content of the deposits than in earlier estimates;

Higher grade portions of the new resources are relatively shallow and occur within 300 metres of

surface which could potentially benefit future mining scenarios;

Gold recovery is currently not considered in the sulphide NSR calculation. Further metallurgical

work is planned to assess gold recoveries in both the sulphide and oxidized mineralization;

Mineralization in both the South Skarn and Mina La Bocona deposits remains open at depths

below 500 metres, leaving additional exploration potential. Several other targets remain un-tested

or poorly-tested in the area of the Cerro and will form the basis for further exploration on the project

through 2022;

This new Mineral Resource estimate will now form the basis for a Preliminary Economic

Assessment ("PEA"), which is expected to be completed by Q2 2022; and

Exploration continues on the CLM project. Eight additional holes totalling 2,822 metres have been

completed in the Area of the Cerro and five holes totalling 1,936 metres on the adjacent El Sol

Claim. Assays from these holes are pending.

NSR Calculation Parameters

The NSR values were calculated using average long-term prices of $20/oz. silver, $1,650/oz. gold,

$3.25/lb. copper, $1.00/lb. lead and $1.20/lb. zinc. Metallurgical test work identified three saleable

concentrates for the Skarn zones and two from the Blind, El Sol and Las Victorias zones (BESS). NSR

values for each concentrate were calculated utilizing the parameters summarized in Table 1 and

summed to determine a total NSR value for each block.

Only silver and gold recoveries in dore were considered for the oxide NSR calculations. Gold was not

recovered in the sulphide concentrates and is estimated at 70% in the oxide circuit for the purposes of

this reporting.

All prices are stated in $USD.

Table 1: Variables considered in the NSR calculations for each concentrate.

Sulfides

Oxides

Item

Pb Concentrate

Zn Concentrate

Cu Conc.

Ag-Au

leach

Skarn

BESS

Skarn

BESS

Skarn

Pb Recovery

84%

90%

Zn Recovery

95%

78%

Cu Recovery

60%

Ag Recovery

77%

79%

8%

12%

7%

74%

Au Recovery

70%

Payable Metals

Pb, Ag

Pb, Ag

Zn, Ag

Zn, Ag

Cu, Ag

Au, Ag

Concentrate grade,

(primary base metal)

65%

70%

54%

52%

27%

Transport, Treatment,

Penalty charges, $

dmt

230

267

358

364

183

Base metal

Concentrate

Grade Deduction

3%

3%

8%

8%

1%

Ag Concentrate

Grade Deduction, g/t

50

50

93

93

Ag Refining charge,

$/oz

0.6

0.6

0.4

Base metal

Refining, $/lb

0.107

Ag payable

90%

Table 2: Base-case Sulphide Mineral Resource Estimate for CLM Project Utilizing a US$60/t

NSR cut-off value:

Indicated Resources

Average Grade

Zone

Tonnes

Ag

Au

Pb

Zn

Cu

AgEq

ZnEq

NSR

(Kt)

(g/t)

(g/t)

(%)

(%)

(%)

(g/t)

(%)

(US$/t

)

Blind Zone

2,347

97

0.04

1.9

2.1

0.11

295

7.2

108

El Sol Zone

1,154

80

0.04

2.2

2.0

0.09

279

6.8

100

Skarn Front Zone

7,254

108

0.06

0.8

4.2

0.19

383

9.3

140

La Bocona Zone

1,571

132

0.19

2.2

1.6

0.17

302

7.3

136

Total

12,325

106

0.07

1.3

3.3

0.16

347

8.4

130

Inferred Resources

Average Grade

Zone

Tonnes

Ag

Au

Pb

Zn

Cu

AgEq

ZnEq

NSR

(Kt)

(g/t)

(g/t)

(%)

(%)

(%)

(g/t)

(%)

(US$/t)

Blind Zone

1,347

83

0.14

1.4

1.8

0.06

248

6.0

88

El Sol Zone

863

65

0.03

1.8

2.3

0.05

263

6.4

90

Las Victorias Zone

1,083

148

0.66

2.1

2.6

0.14

431

10.5

145

Skarn Front Zone

11,466

115

0.05

0.7

2.7

0.32

318

7.7

126

South Skarn Zone

3,789

140

0.18

2.0

1.3

0.09

309

7.5

130

La Bocona Zone

1,057

106

0.20

1.3

2.2

0.18

293

7.1

117

Total

19,605

117

0.12

1.2

2.3

0.23

314

7.6

123

I

ndicated Resources

Contained Metal

Zone

Tonnes

Ag TrOz

Au TrOz

Pb

Zn

Cu

AgEq TrOz

ZnEq Lbs

(Kt)

(000's)

(000's)

(Mlbs)

(Mlbs)

(Mlbs)

(000's)

(Mlbs)

Blind Zone

2,347

7,350

3

99

109

5.5

22,291

371

El Sol Zone

1,154

2,956

2

55

51

2.2

10,337

172

Skarn Front Zone

7,254

25,106

14

126

678

30.7

89,421

1,490

La Bocona Zone

1,571

6,688

10

77

56

6.0

15,275

255

Total

12,325

42,100

28

358

895

44

137,323

2,288

Inferred Resources

Contained Metal

Zone

Tonnes

Ag TrOz

Au TrOz

Pb

Zn

Cu

AgEq TrOz

ZnEq Lbs

(Kt)

(000's)

(000's)

(Mlbs)

(Mlbs)

(Mlbs)

(000's)

(Mlbs)

Blind Zone

1,347

3,582

6

40

55

2

10,749

179

El Sol Zone

863

1,816

1

35

43

1

7,283

121

Las Victorias Zone

1,083

5,152

23

51

62

3

15,006

250

Skarn Front Zone

11,466

42,462

18

177

687

80

117,065

1,951

South Skarn Zone

3,789

17,007

22

167

112

7

37,660

628

La Bocona Zone

1,057

3,589

7

30

51

4

9,950

166

Total

19,605

73,610

78

500

1,009

98

197,712

3,295

1)

The current Resource Estimate was prepared by Garth Kirkham, P.Geo., of Kirkham Geosystems Ltd.

2)

All mineral resources have been estimated in accordance with Canadian Institute of Mining and Metallurgy and Petroleum ("CIM") definitions,

as required under National Instrument 43-101 ("NI43-101").

3)

Mineral resources were constrained using continuous mining units demonstrating reasonable prospects of eventual economic extraction.

4)

Silver Equivalents were calculated from the interpolated block values using relative recoveries and prices between the component metals and

silver to determine a final AgEq value. The same methodology was used to calculate the ZnEq value.

5)

Silver Equivalents and NSR$/t values were calculated using average long-term prices of $20/oz. silver, $1,650/oz. gold, $3.25/lb. copper, $1.0/lb.

lead and $1.20/lb. zinc. Metal recoveries, payables and deductions are reported in Table 1.

All prices are stated in $USD.

6)

Mineral resources are not mineral reserves until they have demonstrated economic viability. Mineral resource estimates do not account for a

resource's mineability, selectivity, mining loss, or dilution.

7)

An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to

a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources

with continued exploration.

8)

All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to add precisely.

Oxide Resources

A small oxide resource was identified within the upper 100 metres of surface in the La Bocona zone. The

2021 oxide resources at a US$60/t cut-off are:

An

Indicated Mineral resource

totalling

65,000 tonnes averaging 28g/t Ag and 2.2 g/t Au

equalling a

US$93/t NSR value, containing:

58,000 ounces of silver and 4,500 ounces of gold.

An

Inferred Mineral resource

totalling

219,000 tonnes averaging 120g/t Ag and 0.8g/t Au

equalling a US$88/t NSR value, containing:

844,000 ounces of silver and 5,600 ounces of gold

A 74% silver recovery was utilized in the resource model and was based on acid-leach test work

conducted on samples from the Blind - El Sol zone. Gold recovery has been estimated at 70% for the

purposes of this report. Further metallurgical test work is required to confirm the gold recovery from the

La Bocona oxides.

Table 3: Base-case Oxide Mineral Resource Estimate for CLM Project Utilizing a US$60/t NSR

cut-off value:

Average Grade

Contained Metal

La Bocona

Tonnes

Ag

Au

NSR

Ag TrOz

Au TrOz

(kt)

(g/t)

(g/t)

(US$/t)

(koz)

(koz)

Indicated

65

28

2.2

93

58

4.5

Inferred

219

120

0.8

88

844

5.6

Notes: The $60/t NSR cut-off value was calculated using average long-term prices of $20/oz. silver, $1,650/oz. gold. Base metals were not

recovered in the leach circuit. Metallurgical work from batch test work recovered 74% silver from oxidized composites from the Blind - El Sol zones.

Gold recovery was not assessed and is estimated at 70% for the purposes of this report. This work, along with marketing studies, were used to

decide the NSR cut-off value. All prices are stated in $USD.

Model Parameters

Six separate mineral deposits were modelled in the resource estimate, four deposits in 2019 and two in

2021. The Blind, El Sol and Las Victorias deposits form sets of sub-parallel, northwest-trending and

steeply dipping mineralized zones which are traced for over 1300 metres strike and up to 600 metres

depth. The Skarn Front forms beneath the Blind, El Sol and Las Victorias deposits and is localized on

the outer edge of the skarn alteration zone surrounding the Central Monzonite Intrusion and has been

drilled along an approximate 1100 metre strike length and to depths of up to 1000 metres.

Similarly, the South Skarn Zone is localized on the outer edge of the skarn alteration zone surrounding

the Central Monzonite Intrusion, but on the eastern side. The deposit forms a tabular, steeply east-

dipping body that has a strike length of approximately 350m and has been drilled to a depth of 500m.

The Bocona Zone consists of two separate sub-zones - the Bocona Skarn Zone and the Muralla Zone.

The Bocona Skarn Zone is also localized on the outer edge of the skarn alteration zone surrounding the

Central Monzonite Intrusion, but on the North side, wrapping around the Northeastern Margin. The upper

part of the Muralla zone is strongly oxidized and is the basis of the quoted oxide resource.

A NI 43-101 Technical Report will be posted on SEDAR within 45 days.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Inferred Resources are considered too speculative geologically to have economic considerations

applied to them that would enable them to be classified as Mineral Reserves. An Inferred Mineral

Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and

must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred

Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

Mineral Resource Estimate Parameters for the South Skarn and Bocona Zones

The estimate was carried out using separate block models for the Bocona and South Skarn Zones

constrained by 3D wireframes of the individual mineralized zones. The block model is comprised

of an array of blocks measuring 10m x 3m x 10m which are sub-blocked to 0.5m x 0.3m x 0.5m,

with grades for Ag, Au, Cu, Pb and Zn interpolated using Inverse Distance to the Second Power

(ID2) weighting. NSR/t, silver equivalent and zinc equivalent values were subsequently calculated

from the interpolated block grades.

The interpolation was carried out in two passes using progressively larger search radii of 60m x

60m x 30m to a maximum of 100m x 100m x 50m for all zones with the exception of the La Bocona

Skarn zone where the second pass was limited to 60m x 15m x 25m at an orientation of 60

degrees perpendicular to strike and -80 degrees down dip. The first pass was restricted to a

minimum of 2 and a maximum of 12 composites, with a maximum of 4 composites from any one

drill hole (i.e. a minimum of two drill holes required for >4 composites) while the second pass was

more restrictive using a minimum of 3 and a maximum of 9 composites, with a maximum of 3

composites from any one drill hole.

Bulk densities at La Bocona were based on a total of 418 sample interval measurements taken by

Southern field personnel. For each sample interval, sub-samples were taken from each individual

length of core and the weighted average for the sample used. Density values ranged from 1.9 t/m

3

to 4.73 t/m

3

. Bulk densities at Skarn South were based on a total of 387 sample interval

measurements where density values ranged from 1.51 t/m

3

to 4.35 t/m

3

. Density values were

interpolated on a block-by-block basis using an inverse distance to the second power. An average

value of 2.97 t/m3 was assigned to blocks that were not interpolated.

Silver composite values have been capped in order to remove the effects of potential

overestimation due to statistical outliers. The threshold chosen was 700 g/t silver for both La

Bocona and South Skarn. In addition, outlier values for the co-product metals were capped at the

threshold levels of 5 g/t gold, 1.4% copper, 15% lead and 10% zinc at La Bocona and 2.5 g/t gold,

0.5% copper, 15% lead and 8% zinc at South Skarn, respectively.

The mineralized zones were initially defined by Southern personnel and subsequently validated

and refined by KGL. The mineralized wire frames were defined using a combination of geological

constraints and grade boundaries with no minimum mining thickness applied. Intervals that were

not sampled were assigned a zero grade.

For all zones, blocks are classified as Inferred if they are included within 75m of at least one drill

hole intercept. Blocks within 40m of the nearest intercept, and estimated by at least two drill holes

were classified as Indicated. However, an interpreted boundary is the final determination of

indicated and inferred resources in order to remove outlier blocks and the "spotted dog" effect. In

addition, continuous potentially underground mining panels were created to demonstrate

"reasonable prospect of eventual economic extraction."

Qualified Persons

The independent Qualified Person for the mineral resource disclosure for the project is Garth Kirkham,

P.Geo., Principal, Kirkham Geosystems Ltd., who has reviewed and approved the contents of this

release.​ In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects,

Robert Macdonald, P.Geo, Vice President Exploration, is the Qualified Person for the Company and has

validated and approved the technical and scientific content of this news release.

Risk Factors

Southern Silver is aware this project is subject to the same types of risks that large precious and base

metal projects experience at an early stage of development in Mexico. The Company has engaged

experienced management and specialized consultants to identify, manage and mitigate those risks.

However, the types of risks will change as the project evolves and more information becomes available.

Further details regarding the foregoing estimate, including the estimation methods and procedures, will

be detailed in the pending NI 43-101 Technical Report, which will be filed on SEDAR (

www.sedar.com

)

under the Company's profile within 45 days from the date of this news release.

About Southern Silver Exploration Corp.

Southern Silver Exploration Corp. is an exploration and development company with a focus on the

discovery of world-class mineral deposits. Our specific emphasis is the 100% owned Cerro Las Minitas

silver-lead-zinc project located in the heart of Mexico's Faja de Plata, which hosts multiple world-class

mineral deposits such as Penasquito, San Martin, Naica and Pitarrilla. We have assembled a team of

highly experienced technical, operational and transactional professionals to support our exploration

efforts in developing the Cerro Las Minitas project into a premier, high-grade, silver-lead-zinc mine.

The Company's property portfolio also includes the Oro porphyry copper-gold project located in southern

New Mexico, USA, which includes patented land, State leases and BLM mineral claims totalling 22.3 sq.

km. Targeting has been finalized and bonding pending for a 4,000m drill program, designed to test

several copper-molybdenum porphyry and copper-gold skarn targets within a broad quartz-sericite-pyrite

alteration zone, interpreted to overlie an unexposed porphyry centre. Permitting is in the final stages with

drilling expected to commence in Q1, 2022.

On behalf of the Board of Directors

"Lawrence Page"

Lawrence Page, Q.C.

President & Director, Southern Silver Exploration Corp.

For further information, please visit Southern Silver's website at

southernsilverexploration.com

or contact

us at 604.641.2759 or by email at

[email protected]

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This news release may contain forward-looking statements. Forward-looking statements address

future events and conditions and therefore involve inherent risks and uncertainties. Actual results may

differ materially from those currently anticipated in such statements. Factors that could cause actual

results to differ materially from those in forward-looking statements include the timing and receipt of

government and regulatory approvals, and continued availability of capital and financing and general

economic, market or business conditions.

Southern Silver Exploration Corp. does not assume any

obligation to update or revise its forward-looking statements, whether as a result of new information,

future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/100961