Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SSE.V ·

Silver Spruce Secures Financing to Acquire 100% Interest in Past-Producing Kay Mine in Arizona, USA

Mergers & Acquisitions

Silver Spruce Secures Financing to Acquire 100% Interest in

Past-Producing Kay Mine in Arizona, USA

June 22,2017 - Bridgewater, NS - (TSXV:SSE) – Silver Spruce Resources Inc. ("Silver Spruce"

or the "Company") is pleased to announce it has secured a loan for the remaining cash component of the

Purchase Agreement with Cedar Forest LLC (the ”Vendor”) for the Kay Mine parcel of 70. 84 acres of

patented claims near Black Canyon City, Arizona, USA.

The twelve-month, U$450,000 Loan was arranged by Leede Jones Gable Inc. and carries a twelve percent

coupon rate. The Company will also pay 1,735,779 fully paid bonus shares to the lender and a

commission of 500,000 shares to Leede Jones Gable Inc.

“The provision of this loan will enable Silv er Spruce to complete our purchase of 100% of the Kay

Mine parcel of patented ground , royalty free. In combination with the 400 acres of unpatented claims

filed by the Company, we will control all of the known areas of mineralization at the project that ha ve

been identified over the last 120 + years by companies such as the Kay Copper Company, Exxon

Minerals, Rayrock (acquired by Glamis) and American Copper and Nickel (a subsidiary of INCO, now

Vale),” stated Dr. Brian Penney, Chairman of Silver Spruce Resources Inc.

Terms of Purchase

The original asking price for the 70.84 acre parcel of patented ground was U$977,000. Upon execution of

the Purchase Agreement to acquire 100% interest in the patented claims, free of any royalties, Silver

Spruce paid a non-refundable deposit of US $50,000 to the Vendor.

The Company will pay US $450,000 cash to the Vendor on closing, which is estim ated to occur on or

about June 28, 2017.

In lieu of the second cash payment of U$477,000 and its associated Convertible Debenture, t he

Vendor has decided to accept the face amount in shares of the Company at a deemed price of CAD

$0.075 per common share. Therefore, the Company will issue 8,649,142 shares to the Vendor at closing.

This acquisition is subject to Exchange acceptance.

The Kay Mine Project

The Kay Copper Company and others produced Au-Ag-Cu-Pb-Zn ore on the property intermittently from

1916 until 1956. Exploration conducted from 1972 to 1982 by Exxon Minerals Company, a subsidiary of

Exxon Petroleum, indicates that substantial additional mineralization exists down dip and potentially

along strike from the previously producing mineral deposits. A two-page Executive Summary of the Kay

Mine Project is available here: http://www.silverspruceresources.com/s/KayMine.asp .

Known mineralization occurs in two zones of massive sulfide, the North and South Zones, extending

from the surface to at least 2100 feet in depth. Mineralization is open at depth. A November 1982 internal

Exxon Minerals Company report by M. L. Fellows stated that the deposit contains a resource of "Proven

and Probable ore" with a tonnage of 6.4 million short tons grading an estimated 2.2% copper, 3.03% zinc,

1.6 ounces per ton (50 g/t) silver and 0.082 ounces per ton (2.55 g/t) gold. The estimate was made using

assay data from historic mine level plans and Exxon drill hole intercepts.

Exxon's use of the word "ore" is not to be construed in the strict sense. After examining mine assay level

plans and Exxon drill hole data, Silver Spruce has concluded that "Indicated Mineral Resource" is the

appropriate term for Exxon's historical estimate. Additional drilling is needed to verify this estimate. The

Qualified Person for Silver Spruce has not conducted sufficient work to definitively classify Exxon's

resource estimate to be compliant with NI -43-101 resource definitions. The issuer is not treating the

historical estimate as current mineral resources or mineral reserves. Exxon also reported the deposits to be

open down dip, with significant additional potential for the discovery of new deposits.

Qualified Person

Mr. Leonard J. Kar r, professional geologist and the Company's independent Qualified Person is

responsible for the technica l content of this press release within the meaning of National Instrument 43 -

101 Standards of Disclosure for Mineral Projects ("NI 43-101"), under TSX guidelines.

About Silver Spruce Resources Inc.

Silver Spruce Resources Inc. is a well -positioned Canadia n junior exploration company pursuing

acquisition and development of the past producing Kay Mine volcanogenic massive sulfide (“VMS”)

project in Arizona, USA, and the development of the Pino De Plata and the Encino De Oro epithermal

silver/ base metal/ gold projects located in the prolific Sierra Madre Occidental region of western

Chihuahua State in Mexico.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is de fined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

The company seeks Safe Harbour.

Contact:

Silver Spruce Resources Inc.

Karl Boltz, President & CEO, Director

Toll Free: (866) 641-3397

[email protected]

www.silverspruceresources.com