Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SSE.V ·

Silver Spruce completes earn-in and signs Joint Venture agreement, plans Phase 1 trenching program at the Jackie Au-Ag project, Sonora, Mexico

Mergers & Acquisitions Property Options & Staking Exploration Programs Partnerships & JV

Silver Spruce completes earn-in and signs Joint Venture agreement, plans Phase 1

trenching program at the Jackie Au-Ag project, Sonora, Mexico

June 28, 2022 - Bedford, NS - (TSXV:SSE) - Silver Spruce Resources Inc. ("Silver Spruce" or

the "Company") announces that the Company has fulfilled the terms of the earn-in agreement with

Colibri Resource Corp. (“Colibri”), earned its 50% interest and signed a Joint Venture Agreement

(“JV”) to move forward with additional exploration at the Jackie project, Sonora, Mexico.

“We are pleased to have expedited the earn-in requirements, signed the JV with Colibri and, with

operating permits in place from SEMARNAT, look forward to undertaking our jointly funded

trenching and drilling program s on our significant greenfield Au -Ag discovery ,” stated Greg

Davison, Silver Spruce Vice -President Exploration and Director. “The trenching is proposed to

start in July 2022 though the specific program timeline will be constrained by the onset and

duration of the s easonal summer rains. We will be utilizing a portable X -ray fluorescence tool

(“PXRF”) to test newly exposed bedrock along the access routes and specified trenching areas for

anomalous metals and pathfinder elements . These preliminary results will provide focus on the

most prospective rock sampling locations for quantitative assays and analyses. Both datasets will

be compiled with the project ArcGIS files and applied to follow-up drill hole prioritization.”

Figure 1. Principal exposure of Tertiary rhyolite and tuffaceous rhyolite overlying Tarahumara andesites

(Figure 2), located 50 metres above the valley floor and 125 metres south of the principal anomalous Au-

Ag values with silica-zeolite, exhibiting anomalous proximal Zn-Pb-Hg-Cd and more distal As-Sb-Cu,

intense silica-clay-sulphate alteration, pervasive surface oxidation and a paucity of vegetation.

Media Release

Figure 2. 2021 geological mapping and selected sampling showing anomalous AuEq values within and

peripheral to the exposed Tertiary rhyolite (orange) and the underlying Cretaceous Tarahumara andesite

and tuffaceous andesite (pink). Individual proposed trenches measure up to 20 metres in length.

Project Plans

The permitted areas for trenching and drilling are shown in Figures 2 and 3, respectively, with

assay data from recent rock sampling. High grades of mineralization to 9.65 g/t Au and 515 g/t

Ag, with coincident alteration and geochemical features, are tra nsected by a NW -trending faults

(see Press Release of December 29, 2021).

Exploration plans were submitted for a 500-1,000 metre trenching program followed by an initial

1,000-2,000 metre initial reverse circulation drill program to evaluate the principal targets located

near the centre of the concession. The proposed scope is designed to provide significant flexibility

during the life of the initial permit and includes forty-eight (48) trench track locations and thirty-

six (36) drill pads.

Project Geology

Jackie is positioned within the west -central portion of the Sierra Madre Occidental Volcanic

Complex of northern Mexico (see Press Release of January 18, 2021).

Ground truthing of the Au-Ag system was completed in campaigns between January 2021 and July

2021 (see Press Releases of February 5, May 20 and August 26, 2021). The airborne and satellite

survey data were acquired between April 2021 and September 2021 (see Press Releases of

February 17, June 30 and September 9, 2021).

The prospecting and mapping clearly identified a strong Au -Ag anomaly, commonly though not

exclusively, associated with elevated Hg, Pb, Zn, Cd, As, Sb and Cu with spatial distribution and

trends like the multi-element data recorded for the nearby El Mezquite property.

Rock sampling identified intense oxidation, silicification and argillic alteration, with low grade or

bleached metals, and a notable paucity of vegetation. The alteration was noted during aerial

photograph reconnaissance, and AS TER and LANDSAT 8 interpretation , and confirmed by

aiSIRIS outcrop sampling results for hyperspectral analysis. The anomaly is the focus area of the

proposed trenching and drilling plans (Figure 3).

Figure 3. Line profiles for permitted trenching and drill pad locations on Jackie shown with Au assays.

Approximately 40 individual trench tracks up to 20 metres in length located on Priority 1 (red) and 2

(blue) lines and centred over the mapped Tertiary rhyolite (Figure 2) exhibiting anomalous Au-Ag-Zn-

Pb-Hg-Cd and more distal As-Sb-Cu, intense zeolite-silica-clay and pervasive shallow oxidation.

Orthophoto at 1:3,000 scale.

A northwesterly trend of anomalous precious metal, base metal and heavy metal pathfinder

elements runs parallel to and transverse to local and regional lineaments which provides new

untested targets for sampling and mapping both north and northwest of the target.

The patterns indicated by cryptic structural features interpreted from the LiDAR maps and surface

contours include a steeply dipping scarp of 5 -15 metres located by mapping within 10 -20 metres

of the highest Au grade. Transverse ENE -trending features aligned as extensional arrays were

corroborated by detailed LiDAR analysis and recent geological mapping.

Project Background

The 1,130-hectare Jackie Au-Ag property (“Jackie”) is a precious metal project located 8 km west-

southwest of the town of Tepoca, and 170 km southeast of the capital city of Hermosillo, eastern

Sonora, Mexico (Figure 4).

Figure 4. Jackie Concession Location Map. Note adjacent El Mezquite and Diamante 1 and 2.

Jackie is well situated in logistics for exploration and located six kilometres west and northwest of

the Nicho deposit of Minera Alamos east of Highway #117. The Property is located ten kilometres

southwest of Tepoca located on Highway #16 and is easily accessible to the west of Highway #117

via trails and dry river bed access from the pueblo of La Quema with vehicles and pack teams.

High voltage power lines are located on Highway #16.

Mining and exploration in the surrounding area is active with adjacent and nearby properties held

by Alamos Gold, Argonaut, Agnico Eagle, Evrim, Newmont, Garibaldi, Kootenay Silver and

Penoles among others.

The Jackie project was subject to an option agreement with Colibri (see Press Release of November

30, 2020), wherein Silver Spruce could earn up to 50% of the gold and silver project by meeting

specific criteria over a period of two years. Silver Spruce accelerated completion of the earn-in

terms for cash and share payments and work expenditures. The 50:50 joint venture agreement was

signed in May 2022.

Terms of Earn-in Agreement

Upon acceptance of the Definitive Agreement by the Toronto Stock Exchange (TSX), Silver

Spruce agreed to pay to Colibri USD$25,000 and CAD$25,000 in common shares as the first

property payment within 7 days of TSX approval. To earn 50% interest in the Property, Silver

Spruce agreed to provide USD$100,000 in exploration and drilling expenses with a minimum of

USD$50,000 within 12 months of TSX approval, and to pay to Colibri a second property payment

of USD$25,000 and CAD$25,000 in common shares also within 12 months of TSX approval.

Silver Spruce also agreed to pay 50% of the requisite property taxes and surface rights agreements.

Upon completion of these terms, Silver Spruce will hold a 50% interest in the Property and a Joint

Venture formed to direct all exploration and drilling expenses thereafter shared 50% by Silver

Spruce and 50% by Colibri, and subject to standard dilution terms defined within t he Definitive

Agreement. There are no underlying royalties on the Property.

Sonora, MX

Property Map

10 kilometres

El Mezquite

Jackie

Diamante 1

Diamante 2

Diamante

Jackie

El Mezquite

Qualified Person

Greg Davison, PGeo , Silver Spruce VP Exploration and Director, is the Company’s internal

Qualified Person for the Jackie Project and is responsible for approval of the technical content of

this press release within the meaning of National Instrument 43 -101 Standards of Disclosure for

Mineral Projects ("NI 43-101"), under TSX guidelines.

About Silver Spruce Resources Inc.

Silver Spruce Resources Inc. is a Canadian junior exploration company which has signed

Definitive Agreements to acquire 100% of the Melchett Lake Zn -Au-Ag project in northern

Ontario, and wit h Colibri Resource Corp. in Sonora, Mexico, to acquire 50% interest in Yaque

Minerales S.A de C.V. holding the El Mezquite Au project, and up to 50% interest in Colibri's

Diamante Au-Ag project. Silver Spruce recently signed a 50:50 joint venture agreement with

Colibri on the Jackie Au project. Silver Spruce signed a Definitive Agreement to acquire 100%

interest in the Mystery Au project in the Exploits Subzone Gold Belt, Newfoundland and

Labrador. The Company signed an Agreement to earn 100% interest in the Pino de Plata Ag

project in western Chihuahua, Mexico. Silver Spruce Resources Inc. continues to investigate

opportunities that Management has identified or that have been presented to the C ompany for

consideration.

Contact:

Silver Spruce Resources Inc.

Greg Davison, PGeo, Vice-President Exploration and Director

(250) 521-0444

[email protected]

Michael Kinley, CEO

(902) 402-0388

[email protected]

[email protected]

www.silverspruceresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defin ed in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Notice Regarding Forward-Looking Statements

This news release contains "forward -looking statements," Statements in this press release whi ch are not purely historical are

forward-looking statements and include any statements regarding beliefs, plans, expectations or intentions regarding the future,

including but not limited to, statements regarding the private placement.

Actual results could differ from those projected in any forward-looking statements due to numerous factors. Such factors include,

among others, the inherent uncertainties associated with mineral exploration and difficulties associated with obtaining finan cing

on acceptable terms. We are not in control of metals prices and these could vary to make development uneconomic. These forward-

looking statements are made as of the date of this news release, and we assume no obligation to update the forward -looking

statements, or to update the reasons why actual results could differ from those projected in the forward -looking statements.

Although we believe that the beliefs, plans, expectations and intentions contained in this press release are reasonable, ther e can

be no assurance that such beliefs, plans, expectations or intentions will prove to be accurate.