Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SRQ.V ·

SRQ Resources Inc./ Ressources SRQ Inc. SRQ Resources: Mineral Rights Restored at Lac Brulé’s Target 900

Corporate Updates

SRQ Resources Inc./

Ressources SRQ Inc.

SRQ Resources: Mineral Rights Restored at Lac Brulé’s Target 900

Montreal, Quebec – January 07, 2025, SRQ Resources Inc. (“SRQ” or the “Company”) (TSX-V: SRQ)

is pleased to announce an agreement with Ministère des Ressources naturelles et des Forêts (“MRNF”;

Québec’s Ministry of Natural Resources and Forests) whereby the MRNF has lifted the temporary

suspension of mineral rights below a biological refuge (“refuge”) by restoring its underlying mineral

claims. SRQ is delighted with this agreement and remains committed to respecting the above-ground

biodiversity within the periphery of the former refuge.

SRQ already holds a drilling permit for Target 900 (see December 03, 2024 press release) which

encompasses the entire prospective area (Figure 1). Furthermore, additional target sectors have been

identified within a 15-kilometer (“km”) radius (Figure 3) through gravimetry and electromagnetic (“EM”)

surveys.

Highlights

• Mineral claims have been restored at Target 900 overlying the previously temporary refuge.

• The Company holds an “Autorisation de Travaux à Impact (“ATI”)”, the authorisation of impact-

causing exploration work for an area of 13.6 km2 surrounding Target 900.

• Target 900 is characterised by a robust gravitational anomaly measuring 3 km by 2 km,

starting 600 meters (“m”) below surface.

• Target 900 is aligned with an airborne EM conductor starting 500m below surface, suggesting

significant depth and lateral extension.

• The target is situated on the northern flank and hinge of Lac Brulé’s folded Magmatic Intrusive

Complex (“IC”), an extensive surface expression formed at the end of the Grenville Orogeny.

Dr. Marc-Antoine Audet, Ph.D., P.Geo., CEO and President of SRQ, said, “We are delighted that our win-

win agreement with the MRNF allows for both protection of above-ground forest biodiversity and

restoration of mineral rights below the refuge. Together with our recently issued ATI, this gives us the

green light to test Target 900 with surface geophysics and a summer drilling program. Target 900’s

geophysical characteristics suggest considerable prospectivity for copper and nickel mineralisation both

at depth and laterally. We look forward to providing more visibility on this potential to our stakeholders

this year.”

Figure 1: Outline of SRQ Claims Restored at Target 900, together with its ATI. The former refuge is

shown as a dash line.

Figure 2: Surface Geological Mapping at Lac Brulé Outlining a Very Large Intrusive Magmatic Complex,

Traced at Surface over more than 25km together with Deep Conductivity Responses.

The EM conductor overlaying the Target 900 high gravimetry response starts from 500m from surface

and increases in intensity up to the technological limits of the 2021 Xcalibur airborne EM survey, at 600m

below surface.

The expected EM continuity at depth coincides with the large, elevated gravimetry response starting from

600m below surface and extending at depth.

Surface mapping, together with borehole LB-24-29 drill results, the gravimetry, and EM responses

described above, make Target 900 a prime target for nickel (“Ni”) and copper (“Cu”) mineralisation.

Target 900 and Regional Potential

Ongoing surface regional geological mapping has outlined a very large IC that appears to be deeply

rooted (Figures 1 & 3). The size of the IC is visible at surface due to the extent of a magmatic-originated

anorthosite/leucogabbro unit overlaying intrusive pyroxenite members (specifically outlined with the 735m

of undeformed and unmetamorphosed magmatic pyroxenite of hole LB-24-29; see June 6, 2024 press

release). The shape of the IC was defined using a combination of magnetic surveys and detailed

geological mapping of more than 160 and 25 surface outcrops of magmatic anorthosite/leucogabbro and

pyroxenite.

The IC is located in the hinge of a large fold and also on the south and north limbs of the fold. Hole LB-

24-29 ended approximately 250m east of the core of the anomaly (Figure 1). Despite missing the core

by such a distance, the hole intersected several mineralised zones including 1.51m at 0.42% Cu and

0.25% Ni, underscoring the mineralised potential of the entire system.

Figure 3: 3D Representation of the Intrusive Magmatic Complex at Lac Brulé.

(Target 900 is located on the northern flank and at the hinge of a large synform fold.)

The Lac Brulé property is located 6 hours by car from Montreal and 50 km west from the former Renzy

Cu-Ni mine.

Quality Control

The technical information in this release has been reviewed and approved by Dr. Marc-Antoine Audet,

Ph.D geology, P. Geo and President and CEO of SRQ Resources, and a ‘Qualified Person’, as defined

by National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About SRQ Resources Inc.

SRQ is a Canadian base metals company exploring for nickel, copper and platinum in the province of

Québec.

A near-surface Ni-Cu project, Lac Brulé is located on a +300 km² virgin exploration property at a five-

hour drive from Montréal. The project’s prospectivity for base metals has been confirmed by drilling,

geological mapping, the presence of a surface gossan, and geophysical surveys. The presence of the

historic Renzy Ni-Cu mine located 50 kilometers to the south-east and at the heart of the large regional

pattern further adds to the area’s mineral exploration appeal.

For more information about SRQ, please visit SRQ’s website at www.srqexploration.com.

Contact Information:

Marc-Antoine Audet. President and CEO

[email protected]

Tel: (514) 726-4158

Forward-Looking Statements and Forward-Looking Information:

Certain of the statements made and information contained herein are “forward-looking statements” or

“forward-looking information” within the meaning of Canadian securities legislation. Forward -looking

statements and forward-looking information characterized by terms such as “will”, “could”, “expect”,

“estimate”, “evidence”, “potential”, “appears”, “seems”, “suggest”, are inherently subject to significant

business, economic, and competitive uncertainties and contingencies. Known and unknown factors could

cause actual results to differ materially from those projected in the forward-looking statements and

forward-looking information, and undue reliance should not be placed on such statements and

information. Such factors include, but are not limited to: the speculative nature of mineral exploration and

development; assumptions relating to the trading price of the Company’s common shares; the ability of

the Company to convert resources in reserves, its ability to see through the next phase of development

on any project, its ability to produce a pre-feasibility study or a feasibility study regarding any project, its

ability to execute on its development plans in terms of metallurgy or exploration, the availability of

financing for activities, risks and uncertainties relating to the interpreta tion of drill results and the

estimation of mineral resources and reserves, the geology, grade and continuity of mineral deposits, the

possibility that future exploration, development or mining results will not be consistent with the Company’s

expectations, metal price fluctuations, environmental and regulatory requirements, availability of permits,

escalating costs of remediation and mitigation, risk of title loss, the effects of accidents, equipment

breakdowns, labour disputes or other unanticipated difficulties with or interruptions in exploration or

development, the potential for delays in exploration or development activities, the inherent uncertainty of

cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations,

currency fluctuations, expectations and beliefs of management and other risks and uncertainties. Many

of these uncertainties and contingencies can affect the Company’s actual results and could cause actual

results to differ materially from those expressed or implied in any forward-looking statements and forward-

looking information made by or expressed on behalf of the Company. Readers are cautioned that forward-

looking statements are not guarantees of future performance. The Company disclaims any intention or

obligation to update or revise any forward-looking statements or forward-looking information, whether as

a result of new information, future events or otherwise, except as required by applicable law.

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-

V) accepts responsibility for the adequacy or accuracy of this release.