Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

SRL.V ·

Salazar Extends El Domo Deposit 100M East and Intercepts 10.3M of 6.02%Cu

Drill Results Resource Estimates Exploration Programs

VANCOUVER, BRITISH COLUMBIA, February 8, 2012 ‐ Salazar Resources Ltd. (TSX.V: SRL; FSE: CCG) is pleased to report results from an additional five  holes (1,372.35 meters) from the ongoing diamond drill program on its 100% owned (30,327 hectares) Curipamba volcanogenic massive sulphide (VMS) project in  Ecuador.  These  holes  represent  new  exploratory  drilling  and  are  not  included  in  the  new  5.53Mt indicated and 1.46Mt inferred El Domo resource estimate which was released on January 12, 2012. All 5 holes were drilled to test for mineralization under the andesite sill, east of the El Domo resource (Figure 1). Significant intersections in holes CURI‐156 and CURI‐160 clearly show that the mineralization extends east of the limits of the El Domo resource blocks into undrilled areas.

Holes CURI‐156, 157 and 158 were drilled on a north‐south line to test the projection of the mineralized horizon east of and between the resource blocks of the El Domo deposit (Figure 1). The best intersection of 10.3M of 6.02% Cu was obtained in hole CURI‐156, however, all three holes intersected mineralization which indicates the El Domo mineralization persists eastward beneath the andesite sill and between two areas  of  inferred  resources  (Figure  1).  The  intersection  in  hole  CURI‐156  is  very  significant  as  it demonstrates  the  southern  block  of  inferred  resources  (Figure  1)  can  be  expanded  and  therefore warrants  further  drilling  to  test  this  area.  Additionally,  hole  CURI‐160,  drilled  east  of  the  high  grade intersection  in  hole  CURI‐148  (As  Released  on  January  12,  2012),  intersected  a  wide  interval  of  high grade copper‐gold‐silver mineralization east of the northern block of inferred resources. The high grade intersection  demonstrates  the  block  of  inferred  mineralization  can  be  expanded  (Figure  1)  and  again warrants further drilling in this area.

Fredy Salazar, President and CEO, commented; "We are very encouraged by these latest drill holes, specifically holes CURI‐156 and CURI‐160 which clearly demonstrate significant mineralization east of the El Domo deposit. These drill holes compliment CURI‐155 (previously released) which was located  600 metres east of the deposit and further support the potential to significantly grow the resource at El Domo."

Table 1: Drill Hole Intersections 

HoleFromToWidth*GoldSilverCopperLeadZinc
#(m)(m)(m)(g/t)(g/t)(%)(%)(%)
CURI‐156180.56184.473.911.56133.535.910.050.63
CURI‐157187.7188.450.755.01126.41.20.866.9
CURI‐158206.75207.10.351.229.40.730.262.16
CURI‐159No significant mineralization encountered
CURI‐160161.9172.2110.310.86217.326.020.040.42

*Widths represent down hole core lengths.

CURI‐156 intersected the VMS mineralization approximately 110 metres east of  Curi‐68 (14.37m @ 5.94 g/t Au, 69.65 g/t Ag, 2.74% Cu, 1.01% Pb and 4.0% Zn1) under the andesite sill. It intersected 3.91 meters of copper‐rich massive and semi massive mineralization..

CURI‐157 intersected the mineralization approximately 120 meters east of CURI‐69 (5.34m @ 31.87 g/t Au, 321 g/t Ag, 1.01% Cu, 5.02% Pb and 10.03% Zn1). It intersected a 0.75 meter interval of zinc and copper‐rich massive sulphide mineralization.

CURI‐158 tested the mineralization approximately 50 meters southeast of CURI‐143 (4.28m @ 3.99 g/t Au,  89.80  g/t  Ag,  1.34%  Cu,  0.46%  Pb  and  7.89%  Zn1).  It  intersected  a  1  meter  fault  zone  with chalcopyrite‐pyrite clasts.

CURI‐159 tested the projection of the mineralized horizon approximately 400 meters east of CURI‐42 (8.58  m  @  1.78  g/t  Au,  47.90  g/t  Ag,  0.90%  Cu  and  7.53%  Zn1).  No  significant  mineralization  was intercepted.

1Updated 43‐101 resource report by Roscoe Postle Associates Inc.; October 2011. 

Table 2: Drill Hole Specifications 

Hole‐IDEastingNorthingElevAz0Dip0EOH
CURI‐1566951879855050957.6390‐65255.4
CURI‐1576952009855102961.5390‐70266.9
CURI‐1586951839855200951.9090‐65299.85
CURI‐15969570098554001052.5490‐90280.2
CURI‐16069545198553501010.35270‐90270

Drill core samples are analyzed by ALS Chemex Labs Ltd. and IBS Inspectorate, ISO 9001:2000 certified laboratories. Salazar maintains a QAQC program whereby standard samples and blanks are inserted into each batch of samples to ensure quality control.

Kieran Downes, P.Geo., a qualified person as defined by National Instrument 43‐101, is responsible for the technical information provided in this release.

Figure 1: El Domo Pierce Points Map with Resource Outlines 

ON BEHALF OF THE BOARD OF SALAZAR RESOURCES LIMITED

“Fredy Salazar” 

Fredy Salazar, President & CEO

Salazar Resources Limited 

About  Salazar  Resources:  Salazar  Resources  Ltd.  is  a  publicly‐listed  (TSX.V:  SRL;  FSE:  CCG)  mineral resource company engaged in the exploration and development of highly prospective areas in Ecuador. Led  by  a  senior  Ecuadorian  management  team  and  most  notably  by  its  namesake  Fredy  Salazar,  this team has been instrumental in other major discoveries throughout Ecuador. Being based in Ecuador”, and thus having thorough knowledge  of local human and environmental issues, gives the company  a strategic advantage, enabling it to complete exploration at a rapid pace.

With an excellent property portfolio (3 projects ‐ 42,900 hectares), good geopolitical positioning and a number of strategic corporate and financial partnerships, Salazar has positioned itself to be a strategic player in Ecuador and throughout South America.

For further information, please contact:

Investor Relations 

647‐925‐8981 [email protected] www.salazarresources.com

Neither the  TSX Venture  Exchange  nor  its Regulation Services Provider (as that term is  defined in the  policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news  release.  This  press  release  may  contain  certain  forward‐looking  information.  All  statements  included  herein,  other  than  statements  of  historical  fact,  is  forward‐looking  information  and  such  information  involves various risks and uncertainties. There can be no assurance that such information will prove to be  accurate,  and  actual  results  and  future  events  could  differ  materially  from  those  anticipated  in  such  information.  A  description  of  assumptions  used  to  develop  such  forward‐looking  information  and  a  description  of  risk  factors  that  may  cause  actual  results  to  differ  materially  from  forward‐looking  information  can  be  found  in  the  company's  disclosure  documents  on  the  SEDAR  website  at  www.sedar.com. The company does not undertake to update any forward‐looking information except in  accordance with applicable securities laws.