Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

SPD.V ·

Silver Predator Cuts 42.67 m of 100.25 g/t Silver at Taylor Silver Deposit, Ely, Nevada

Drill Results Resource Estimates Exploration Programs

NEWS RELEASE  TSX: SPD  August 17, 2011  NR 11‐09  www.silverpredator.com

Silver Predator Cuts 42.67 m of 100.25 g/t Silver at  Taylor Silver Deposit, Ely, Nevada 

Vancouver,  British  Columbia,  August  17,  2011:  Silver  Predator  Corp.  (TSX:SPD)  (the  “Company”)  is pleased to announce results of the final 10 holes from its thirty‐five hole drill program at the Taylor Project, located in White Pine County, Nevada.  A total of 3,528 meters of angled RC holes were drilled to test for higher grade feeder veins as well as to expand the current mineral resource.

Significant results include: 

  • SPT11‐027 with 42.67 m of 100.25 g/t silver from a depth of 67.05 m 
  • SPT11‐031 with 7.62 m of 104.2 g/t silver from a depth of 4.57 m; and 6.1 m of 111.75 g/t 

silver from a depth of 44.19 m 

  • SPT11‐034 with 27.43 m of 96.5 g/t silver from surface 
  • SPT11‐035 with 13.72 m of 134.78 g/t silver from a depth of 38.1m

The Taylor Project 

The Taylor silver deposit is an epithermal, high‐silica, low‐sulfide replacement deposit hosted by folded and faulted Devonian carbonate rocks of the Pilot Shale, Guilamette, and Joana formations intruded  by  Tertiary  rhyolite  dikes  and  sills.    The  Taylor  property  includes  a  NI  43‐101  compliant resource consisting of 1,123,000 tonnes of 85.71 g/t silver measured mineral resource, and 4,712,000 tonnes of 77.83 g/t silver indicated mineral resource totalling 14.9 million ounces contained silver; along with an additional 1.9 million ounces silver from an inferred mineral resource of 687,000 tonnes grading 87.1 g/t silver using a 41.1 g/t silver cutoff grade: (Hester, 2010).

The Company's Taylor Project includes rights to a 1,320 ton per day mill with flotation and cyanide leach plants, water rights and approximately 3,900 acres of mining claims located near Ely, Nevada

2011 Drill Program 

The 2011 drilling program extended stratabound silver mineralization to the northeast of the currently defined resource and extended the mineralization at depth and along strike in the Bishop and Argus pit areas.   Notably, holes SPT11‐026 and SPT11‐027 both bottomed in mineralization.  The Company plans to remodel the existing data on Taylor, to assist in future drill programs with the goal of preparing an updated resource estimate in Q2, 2012.

The  next  phase  of  drilling  will  concentrate  on  extending  the  stratabound  northeast  zone  as  well  as testing feeder structures beneath the Argus and NE pits.  In addition, the Company plans to conduct first phase drilling of the Chipps and Antimony Pit prospects, both of which feature jasperoid hosted gold‐ antimony mineralization lying adjacent to the existing silver resources at Taylor.

The Chipps deposit was drilled by Alta Gold and Nerco in the early 1990’s and a small, non‐NI 43‐101 compliant  resource  was  defined  by  over  fifty  shallow  RC  drill  holes.    The  gold  occurs  at  the  contact between the Joanna Limestone and the underlying Pilot shale, the same host rocks as seen at numerous mines in east‐central Nevada including Bald Mountain, Easy Junior and Pan.  The favorable horizon for the jasperoid hosted silver deposits at Taylor has not been tested at the Chipps and Antimony prospects, and may host additional mineralization beneath the gold bearing stratigraphy.

Final Results 2011 Diamond Drill Holes at Taylor Project, Ely, NV
Select Significant Intercepts
Drill HoleFromToInterval (m)Silver
(m)(m)(g/t)
SPT11‐02644.1964.0019.8158.92
and91.44108.2016.7643.73
SPT11‐02738.1054.8616.7651.27
and67.05109.7242.67100.25
Including83.8297.5313.72153.33
SPT11‐02839.6248.779.1444.67
and88.3994.486.1076.50
SPT11‐02953.3460.967.6248.60
SPT11‐03010.6722.8612.1954.27
SPT11‐0314.5712.197.62104.20
and18.2925.917.6256.60
and44.1950.296.10111.75
SPT11‐03250.2954.864.5748.00
SPT11‐0336.109.143.0541.00
SPT11‐0340.0027.4327.4396.50
and27.4336.579.14INS
and36.5739.623.0553.50
SPT11‐0353.0528.9525.9166.41
and38.1051.8113.72134.78

Notes:  1 troy ounce per short ton = 34.2857143 grams per metric tonne  1 metre = 3.28 feet  1 g/t = 1 gram per metric tonne  INS = insufficient sample/no recovery mine workings 

Sampling Methodology, Quality Control and Assurance 

Samples were analyzed by ALS Chemex in Reno and Elko, Nevada. Refer to the Company’s news release dated July 5, 2011 for a complete discussion of sampling methods, quality control and assurance.

David  R.  Hembree,  PGeo,  Nevada  Exploration  Manager,  is  the  Qualified  Person  as  defined  under National Instrument 43‐101, overseeing Silver Predator’s Taylor exploration programs and has reviewed Information presented on QA/QC procedures and technical aspects of the drilling results in this press release.

About Silver Predator Corp.

Silver Predator Corp.’s corporate mandate is to explore and develop commercially viable silver resources in  the  leading  silver  districts  of  Yukon,  Canada  and  Nevada,  USA.  Working  within  stable  geopolitical jurisdictions,  Silver  Predator  is  focused  on  silver‐dominant  bulk  tonnage  and/or  high  grade opportunities.  Proven  management  plus  access  to  unparalleled  geological  talent  in  the  Yukon  and extensive experience in Nevada provide the ability to maximize shareholder value from the quality asset base.

For additional information: 

William M. Sheriff  Chairman & CEO

(604) 648‐4653 [email protected] www.silverpredator.com

No stock exchange, securities commission or other regulatory authority has approved or disapproved the  information contained herein. This press release contains projections and forward‐looking information  that involve various risks and uncertainties regarding future events. Such forward‐looking information  can include without limitation statements based on current expectations involving a number of risks and  uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties  that could cause actual results and Silver Predator's plans and objectives to differ materially from those  expressed  in  the forward‐looking  information. Actual results and future  events  could differ materially  from those anticipated in such information. These and all subsequent written and oral forward‐looking  information are based on estimates and opinions of management on the dates they are made and are  expressly qualified in their entirety by this notice. Except as required by law, Silver Predator assumes no  obligation to update forward‐looking information should circumstances or management's estimates or  opinions change.