Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

SPD.V ·

Silver Predator Announces Initial 2011 Exploration Program Results for Taylor Silver Deposit, Ely, Nevada

Drill Results Resource Estimates Exploration Programs

NEWS RELEASE  TSX:SPD  July 5, 2011  NR 11‐06  www.silverpredator.com

Silver Predator Announces Initial  2011 Exploration Program Results for  Taylor Silver Deposit, Ely, Nevada 

Vancouver, British Columbia — July 5: Silver Predator Corp. (TSX:SPD) (the “Company”) announces the initial results of its thirty‐five hole drill program at the Taylor Project, located in White Pine County, Nevada.  A total of 3,594 m of angled RC holes were drilled to both infill and expand the existing defined resource, as well as test for higher‐grade silver along near vertical veins beneath the disseminated silver deposit.  Highlights from the first twenty‐five holes (see table below) include SPT11‐004 averaging 37 g/t silver over 36.6 m, SPT11‐017 assaying 35.3 g/t silver over 27.4 m, SPT11‐001 averaging 57.8 g/t silver over 18.3 m, and SPT11‐015 assaying 67 g/t silver over 13.7 m.

Overview of the Taylor Project 

The Taylor silver deposit is an epithermal, high‐silica, low‐sulfide replacement deposit hosted by folded and faulted Devonian carbonate rocks of the Pilot Shale, Guilamette, and Joana formations intruded by Tertiary rhyolite dikes and sills.  The Taylor property includes a National Instrument 43‐101 compliant resource consisting of 1,123,000 tonnes of 85.71 g/t silver measured mineral resource, and 4,712,000 tonnes of 77.83 g/t Ag indicated mineral resource totalling 14.9 million ounces contained silver; along with an additional 1.9 million ounces silver from an inferred mineral resource of 687,000 tonnes grading 87.1 g/t silver (using a 41.1 g/t silver cut‐off grade: Hester, 2009). The Company's Taylor Project includes rights to a 1,320 ton per day mill with flotation and cyanide leach plants, water rights and approximately 3,900 acres of mining claims located near Ely, Nevada.

Additional information on the historic  drilling and resource estimates can  be found in  the NI 43‐101 compliant technical report on the Taylor silver project, prepared by Michael Hester and dated December 14, 2010.  The technical report is posted on SEDAR, and can also be found on the Company’s website at www.silverpredator.com.

Initial 2011 Reverse Circulation Holes at Taylor Project, Ely, NV
Select Significant Intercepts(1), (2)
Drill HoleFromToIntervalSilver
(m)(m)(m)(g/t)
SPT11‐0010.0018.2918.357.8
including3.0510.677.684.4
SPT11‐00213.7222.869.179.3
including16.7621.344.6127.3
SPT11‐0030.007.627.651.8
SPT11‐0041.5238.1036.637.0
including3.0510.677.670.0
SPT11‐00718.2921.343.077.0
SPT11‐0086.1019.817.367.3
SPT11‐01285.3489.924.672.3
SPT11‐01412.1913.721.539.0
SPT11‐0150.0013.7213.767.0
including9.1412.193.0163.5
SPT11‐01630.4832.001.5190.0
and59.4462.483.062.0
and117.35118.871.548.0
SPT11‐0170.0027.4327.435.3
including0.004.574.6104.0
SPT11‐0190.006.106.143.8
and12.1915.243.036.0
SPT11‐02042.6748.776.141.5
SPT11‐227.629.141.569.0
and16.7628.9612.236.0
SPT11‐2354.8660.966.065.8
SPT11‐02518.2924.386.057.5

(1) > 35 g/t Ag 

(2) 1 g/t = 1 gram per metric tonne

Laboratory Analysis, Quality Assurance and Quality Control 

ALS CHEMEX of Reno, NV and Elko, NV performed all primary lab analyses.  Samples received in the lab were first logged‐in and assigned a barcode.  The samples were then rotary split prior to crushing to retain a coarse sample for metallurgical work.  The remainder was fine crushed to 70% less than 2 mm then split with a riffle splitter with one split pulverized to 85% less than 75 microns.  Silver was analyzed by aqua regia digestion and AAS.  Samples exceeding 1,000 ppm silver were run for silver by fire assay using  a  30  g  nominal  sample  weight  with  gravimetric  finish.    Assay  results  for  gold  and  silver  are reported by the lab in ppm units.  In public disclosure, gram per metric tonne (g/t) is used, where 1 ppm is equivalent to 1 g/t.

QA/QC  procedures  followed  for  the  reverse  circulation  drilling  include  submittal  of  chip  samples  for analysis with a duplicate sample for every twenty samples submitted and also a combination of blank and referee samples included with every sample batch.  All assay numbers are reported as un‐cut and all intercepts are reported as drill width and are not to be interpreted as true widths.

David  R.  Hembree,  PGeo,  Nevada  Exploration  Manager,  is  the  Qualified  Person  as  defined  under National Instrument 43‐101, overseeing Silver Predator’s Taylor exploration programs and has reviewed Information presented on QA/QC procedures and technical aspects of the drilling results in this press release.

About Silver Predator 

Silver Predator Corp.’s corporate mandate is to explore and develop commercially viable silver resources in the leading silver districts of Yukon, Canada and Nevada, USA.  The Company controls the Taylor silver deposit in Ely, Nevada, which hosts a NI 43‐101 compliant mineral resource estimate, as well as the highly  prospective  Plata  project  in  Yukon.    Working  within  stable  geopolitical  jurisdictions,  Silver Predator  is  focused  on  silver‐dominant  bulk  tonnage  and/or  high  grade  opportunities.    Proven management  plus  access  to  unparalleled  geological  talent  in  the  Yukon  and  extensive  experience  in Nevada provide the ability to maximize shareholder value from the quality asset base.

For additional information: 

Silver Predator Corp. 

Investor Relations (604) 648‐4653 [email protected] www.silverpredator.com

No stock exchange, securities commission or other regulatory authority has approved or disapproved the  information contained herein. This press release contains projections and forward‐looking information  that involve various risks and uncertainties regarding future events. Such forward‐looking information  can include without limitation statements based on current expectations involving a number of risks and  uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties  that could cause actual results and Silver Predator's plans and objectives to differ materially from those  expressed  in  the forward‐looking  information. Actual results and future  events  could differ materially  from those anticipated in such information. These and all subsequent written and oral forward‐looking  information are based on estimates and opinions of management on the dates they are made and are  expressly qualified in their entirety by this notice. Except as required by law, Silver Predator assumes no  obligation to update forward‐looking information should circumstances or management's estimates or  opinions change.