Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SPA.V ·

Spanish Mountain Gold Reports Near Surface High Grade Gold Intercepts in the K - Zone

Drill Results

Spanish Mountain Gold Ltd.

910-1111 Melville Street

Vancouver, British Columbia, V6E 3V6

Tel: 604.601.3651

1

Spanish Mountain Gold Reports Near Surface High Grade Gold Intercepts

in the K - Zone

Vancouver, B.C., April 24, 2025 - Spanish Mountain Gold Ltd. (the "Company" or "Spanish

Mountain Gold") (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF) is pleased to report high grade

gold intercepts and the highest grade encountered to date in exploration history at the

Spanish Mountain Gold project , which is located in the Cariboo Gold Corridor, British

Columbia, Canada. The 10,000 m, 2025 winter exploration diamond drill program ("2025

Winter Drill Program") is comprised of 31 holes and 73% complete.

Highlights:

High-Grade Gold Intercepts – K Zone (See Figures 1, 2, and Table 1):

• Hole 25 -DH-1286 intersected 139.00 m grading 4.18 g/t Au from 56.00 m

including, from 163.00 m, grades of 719.26 g/t Au over 0.75 m, and from 165.10

m, 156.80 g/t Au over 3.50 m

• Hole 25 -DH-1284 intersected 55.70 m grading 0.41 g/t Au from 126.00 m

including, from 172.00 m, 9.70 m grading 1.83 g/t Au and 1.00 m grading 12.13

g/t Au

• Hole 25 -DH-1285 intersected 39.00 m grading 0.99 g/t Au from 113.00 m

including 1.00 m grading 34.59 g/t Au

Visible gold (VG) was observed in multiple drill holes, confirming the high-grade nature of

the K Zone Target (See Figure 3)

Julian Manco , Spanish Mountain Gold's Director of Exploration commented, "These

exceptional results validate our new geological model , extend mineralization and

highlight the significant potential for more high-grade mineralization within our project

area. The high grades encountered in hole 25 -DH-1286 are truly remarkable and

demonstrate an extraordinary upside potential for the Spanish Mountain Gold project."

Peter Mah, Spanish Mountain Gold's President, CEO and Director commented, "We are

thrilled to take a major leap forward unlocking near surface high-grade gold intercepts

that support the growing understanding of our high-quality deposit and signal exciting

new possibilities for high grade open pit gold discovery within 200 m of surface"

2

Figure 1 – Plan View, K-Zone - 2025 Winter Drill Program

3

Figure 2 – Long Section showing the K-Zone.

4

Figure 3 – Representative specimens of the visible gold VG found in the K-Zone Target. Inset A

and a. 25-DH-1286 Drill core photo of quartz + VG vein hosted in sericite-altered tuff. Inset B.

25-DH-1285 Drill core photo of quartz + VG hosted in mafic tuff.

Table 1: 2025 Winter Drill Program – Summarized Gold Assay Results

Drillhole ID From To Width(m) Gold Grade (g/t

Au)

25-DH-1284 126.00 181.70 55.70 0.41

25-DH-1284 172.00 181.70 9.70 1.83

including 172.00 173.00 1.00 12.13

including 180.20 181.70 1.50 3.23

25-DH-1285 113.00 152.00 39.00 0.99

including 113.00 114.00 1.00 34.59

25-DH-1285 173.35 174.74 1.39 1.02

25-DH-1286 56.00 195.00 139.00 4.18

including 163.00 166.50 3.50 156.28

including 165.10 166.50 0.75 719.26

25-DH-1287 68.00 97.00 29.00 0.26

including 75.00 78.00 3.00 0.24

including 94.00 97.00 3.00 1.64

5

Notes:

1) Reported intersections are calculated using a 0.15 g/t Au cut -off grade.

2) The complete assay table is available on the Company’s website

3) True thickness of mineralization is unknown

Table 2: Drill Hole Collar Location and hole depths

HOLE-ID LOCATION ‘X’ LOCATION

‘Y’

LOCATION

‘Z’ LENGTH Azimuth Dip

Easting Northing Elevation

25-DH-1284 604177 5827345 1296 247.75 120 60

25-DH-1285 604174 5827345 1296 240.00 30 65

25-DH-1286 603953 5827695 1192 222.00 120 65.2

25-DH-1287 603953 5827695 1192 114.93 215 75

Abbreviations: metres = m, grams per tonne = g/t, gold = Au

Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC)

Once received from the drill and processed, all drill core samples were sawn in half, labeled, and

bagged. The remaining half of the drill core was securely stored on-site. Numbered security tags were

applied to sample shipments to ensure chain of custody compliance. The Company inserts quality

control (QC) samples at regular intervals, including blanks and reference materials, for all sample

shipments to monitor laboratory performance. Standards and blanks account for a minimum of 15%

of the samples in addition to the laboratory’s internal quality assurance programs. The QAQC program

was overseen by the Company’s Qualified Person, Julian Manco, P.Geo, Director of Exploration (as

described below).

Drill core samples were submitted to MSALABS’ analytical facility in Prince George, British Columbia,

for sample preparation and PhotonAssayTM analysis. The MSALABS facilities are accredited to the

International Standards ISO/IEC 17025 and ISO 9001 standard for gold and multi-element assays, with

all analytical methods incorporating quality control materials at defined frequencies and established

data acceptance criteria. MSALABS Inc. is independent of the Company.

PhotonAssayTM

The PhotonAssayTM method utilizes gamma ray analysis for gold detection using the Chrysos

PhotonAssayTM instrument (PA1408X). This non -destructive, fully automated technique offers high

accuracy for analyzing ores and pulps. Sample preparation begins with drying and crushing up to 1 kg

of material to achieve at least 70% passing through a 2-millimetre (mm) sieve. The sample is then riffle

split to obtain a suitable aliquot for 2 testing cycles (MSALABS Method CPA-Au1).

The PhotonAssayTM instrument bombards 400 - 600 gram samples contained in sealed containers with

gamma rays. These containers remain sealed throughout the process, preserving the sample for

potential further testing. The analysis is performed robotically, with results that integrate into existing

laboratory management systems.

Each sample is accompanied by a reference disc traceable to a Certified Reference Material (CRM).

Both the sample and reference disc undergo gamma ray exposure, with signals detected and analyzed

to ensure accurate and reliable results.

6

The method offers a gold detection range from 0.015 parts per million (ppm - lower limit) to 10,000

ppm (upper limit). Quality control includes the use of reference materials and blanks, with all results

reviewed by a competent person before reporting.

Spanish Mountain Gold implemented two QAQC methodologies to validate the accuracy of

PhotonAssayTM results, both demonstrating good comparability: 1) comparative analysis of diverse

mineralization styles using Total Au screen metallic methods with both FAS -415 (gravimetric finish)

and FAS-211 (AAS finish), and 2) comprehensive testing of both sample aliquots and rejects using FAS-

211 (AAS finish).

QAQC Testing typically can include the following spot checks: 1) Pulverizing tests to evaluate variability

in sample preparation, 2) Cross-analysis at external laboratories using screen metallic method, and 3)

Four-cycle radiation testing to identify and calibrate potential variability in gold results with variable

radiation intensity.

To effectively manage the nugget effect on high-grade gold samples MSALABS tested samples to

"extinction" (CPA-Au1E method). This approach divides samples into multiple splits, analyzes each

separately using PhotonAssayTM, and then calculates a weighted average of the results. By testing

various portions of the sample independently and combining their values proportionally, this method

provides significantly more representative gold values than traditional single-split analysis for samples

with a large nugget effect.

Multi-Elemental Analysis

For the 2025 drilling campaign Spanish Mountain Gold used IMS-230 method to provide multi-element

determination using a four-acid digestion followed by ICP-OES and ICP-MS analysis.

Key Process Steps:

Sample Preparation: Samples are dried and ground to specific criteria (85% passing 75 microns (μm)

for rocks and drill core; 180μm for soils and sediments). A homogeneous 10-gram sample is required.

Digestion: Samples undergo sequential digestion with nitric, perchloric, hydrofluoric, and hydrochloric

acids, followed by dilution with deionized water.

Analysis: The solution is analyzed via ICP-OES and ICP-MS for multi-element quantification.

Quality Control: The process includes reference materials, blanks, and duplicates, with corrections for

spectral interferences and thorough review before final reporting.

Julian Manco, M.Sc., P.Geo., has verified the data disclosed in this news release. The data verification

process involved a multi -step approach to ensure accuracy and integrity. This included a detailed

quality control (QC) analysis of the data, which was performed using both internal and external

platforms, such as the MxDeposit™ software. These QC checks involved the analysis of certified

reference materials (CRMs), blanks, and duplicates to confirm the reliability of the assay results. In

addition, Mr. Manco, conducted a field inspection of the specific drill intervals mentioned in this

release to directly observe the geological features and verified the nature of the results presented.

Qualified Person

Julian Manco, M.Sc., P.Geo., Director of Exploration with Spanish Mountain Gold, is the Qualified

Person as defined under National Instrument 43-101 who has reviewed and has approved the contents

of this news release.

7

About Spanish Mountain Gold Ltd.

Spanish Mountain Gold Ltd. is focused on advancing its 100%-owned Spanish Mountain Gold Project

towards construction of the next gold mine in the Cariboo Gold Corridor, British Columbia. We are

conducting an integrated Whittle Enterprise Optimization to identify the highest potential value-add

improvements while increasing the understanding of the high-grade geologic controls and associated

drill targets that could upgrade and expand the gold resource. We are striving to be a leader in

community and Indigenous relations by leveraging technology and innovation to build the 'greenest'

gold mine in Canada. The Relentless Pursuit for Better Gold means seeking new ways to achieve

optimal financial outcomes that are safer, minimize environmental impact and create meaningful

sustainability for communities. Details on the Company are available on www.sedarplus.ca and on the

Company's website: www.spanishmountaingold.com.

On Behalf of the Board,

“Peter Mah”

President, Chief Executive Officer and Director

Spanish Mountain Gold Ltd.

For more information, contact:

Peter Mah

(604) 601-3651

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

FORWARD-LOOKING INFORMATION:

Certain of the statements and information in this press release constitute "forward -looking information".

Any statements or information that express or involve discussions with respect to predictions, expectations,

beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always,

using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends",

"targets", "goals", "forecasts", "objectives", "potential" or variations thereof or st ating that certain actions,

events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative

of any of these terms and similar expressions) are not statements of historical fact and may be considered

forward-looking information. The Company's forward -looking information is based on the assumptions,

beliefs, expectations and opinions of management as of the date of this press release and include but are

not limited to information with respect to, the potential to extend mineralization within the near -surface

environment; the potential to expand resources and to find higher-grade mineralization at depth; the timing,

size and budget of a winter drill program, and the results thereof; and the delivery of a maiden reso urce for

the Phoenix Target, and the timing and results thereof. Other than as required by applicable securities laws,

the Company does not assume any obligation to update forward -looking information if circumstances or

management's assumptions, beliefs, expectations or opinions should change, or changes in any other events

affecting such statements or information. For the reasons set forth above, investors should not place undue

reliance on forward-looking information.