Spanish Mountain Gold Drilling Intersects 205.87 Metres Grading 0.58 G/T Gold, 142.00 Metres of 0.77 G/T Gold, and 69.40 Metres of 0.99 G/T Gold in Three Separate Drill Holes Containing Numberous Higher-Grade Sub- Intervals

Drill Results

Spanish Mountain Gold Drilling Intersects 205.87 Metres Grading 0.58 G/T

Gold, 142.00 Metres of 0.77 G/T Gold, and 69.40 Metres of 0.99 G/T Gold in

Three Separate Drill Holes Containing Numberous Higher-Grade Sub-

Intervals

VANCOUVER, British Columbia--(BUSINESS WIRE)--February 26, 2026--Spanish Mountain

Gold Ltd. (the "Company" or "Spanish Mountain Gold") (TSX-V: SPA) (FSE: S3Y)

(OTCQB: SPAUF) is pleased to report additional assay results from five exploration drill holes

within the Orca Fault target trend that were completed as part of its 2025 Fall Diamond Drill

program (“2025 Fall Drill Program”) for the Spanish Mountain Gold (“SMG”) project, which

is located in the Cariboo Gold Corridor, British Columbia, Canada.

The company has completed approximately 13,819 metres (“m”), surpassing the original

estimate of drilling of 9,000 to 10,000 m of exploration drilling planned under the 2025 Fall Drill

Program, now continuing into 2026. Assays and geochemistry are pending receipt from the

laboratory and or reporting from seven additional drill holes completed within the Orca Fault

target area.

Highlights:

 26-DH-1328 intersected two intervals of gold mineralization including:

o 205.87 m of 0.58 g/t gold from 10.13 m including 47.00 m of 1.19 g/t gold with a

high-grade subset of 14.50 m of 2.22 g/t gold; and

o 58.00 m of 0.52 g/t gold from 290.00 m including 10.34 m of 1.31 g/t gold.

 26-DH-1329 intersected three intervals of gold mineralization including:

o 142.00 m of 0.77 g/t gold from 9.00 m including 53.00 m of 0.88 g/t gold with a

high-grade subset of 23.50 m of 1.57 g/t gold;

o 19.50 m of 0.69 g/t gold from 213.50 m including 1.50 m of 6.16 g/t gold; and

o 7.50 m of 0.88 g/t gold from 247.50 m including 0.70 m of 8.17 g/t gold

 26-DH-1331A intersected 69.40 m of 0.99 g/t gold from 50.60 m including 19.50 m of

1.86 g/t gold

Key Findings:

 Current exploration drilling assay results continues to intersect significant higher-grade

gold mineralization over 530 m in strike length in the Orca Fault target area trend (Figure

3) and the continuity can now be traced across multiple parallel, adjacent drill sections

over 200 m in width.

Main Deposit – Orca Fault area

Five additional drill holes were collared and successfully completed (see Figure 3) in the Orca

Fault target area, 26-DH-1328 (Figure 1 and Table 1), 26-DH-1329 (Figure 2 and Table 2), 26-

DH-1330 (Figure 1 and Table 3), and 26-DH-1331A (Figure 2 and Table 4), and 26-DH-1332

(Figure 1 and Table 5). These drill holes continue to confirm and lend confidence to the extent of

the Orca Fault target area over 530 m strike length, northwest to southeast, and its geological and

structural interpretation within the constraining open pit for the MRE (see July 3, 2025 news

release).

The continued intersection of broad zones of higher-grade gold mineralization, such as the thick

intersection of gold mineralization in drill hole 26-DH-1328 (Figure 1 and Table 1) reinforces

the opportunities for not only enhancing the Orca Fault target understanding but developing

favorable structures outward into other areas of the Main deposit while exploring for higher-

grade gold mineralization in the near surface, open pit environment, as defined in the recent

MRE (see July 3, 2025 news release). Drill hole 26-DH-1328 intersected 205.87 m of 0.58 g/t

gold from 10.13 m including 47.00 m of 1.19 g/t gold with a high-grade subset of 14.50 m of

2.22 g/t gold.

All results to date continue to reinforce that tighter exploration drill spacing is unlocking

additional mineral potential in the Main deposit as drilling systematically works outward from

the Orca Fault target, tracking the higher-grade gold mineralization. These exploration drill holes

are presented on drill sections (Figure 1 and Figure 2) that shows the alignment of the higher-

grade gold mineralization.

Table 1: Assay Results for 26-DH-1328

Drill hole From (m) To (m) Width (m) Gold (g/t) Apparent True

Thickness

26-DH-1328 10.13 216.00 205.87 0.58 Note 3)

Including 10.13 92.50 82.37 0.76 Note 3)

Including 44.00 91.00 47.00 1.19 Note 3)

Including 72.00 91.00 19.00 1.90 Note 3)

Including 72.00 86.50 14.50 2.22 Note 3)

Including 106.00 125.50 19.50 1.55 Note 3)

Including 106.00 110.00 4.00 3.10 Note 3)

Including 125.00 125.50 0.50 26.40 Note 3)

Including 207.00 212.00 5.00 0.87 Note 3)

249.00 250.00 1.00 1.75 Note 3)

269.95 276.50 6.55 0.67 Note 3)

290.00 348.00 58.00 0.52 Note 3)

Including 314.00 324.34 10.34 1.31 Note 3)

382.00 388.00 6.00 0.32 Note 3)

Table 2: Assay Results for 26-DH-1329

Drill hole From (m) To (m) Width (m) Gold (g/t) Apparent True

Thickness

26-DH-1329 9.00 151.00 142.00 0.77 Note 3)

Including 49.00 74.00 25.00 1.68 Note 3)

Including 49.00 60.00 11.00 2.95 Note 3)

Including 98.00 151.00 53.00 0.88 Note 3)

Including 127.50 151.00 23.50 1.57 Note 3)

Including 127.50 137.15 9.65 2.65 Note 3)

213.50 233.00 19.50 0.69 Note 3)

Including 228.50 230.00 1.50 6.16 Note 3)

247.50 255.00 7.50 0.88 Note 3)

Including 247.50 248.20 0.70 8.17 Note 3)

Table 3: Assay Results for 26-DH-1330

Drill hole From (m) To (m) Width (m) Gold (g/t) Apparent True

Thickness

26-DH-1330 9.50 38.00 28.50 0.31 Note 3)

Including 34.00 38.00 4.00 1.05 Note 3)

63.00 137.60 74.60 0.59 Note 3)

Including 70.00 81.46 11.46 1.46 Note 3)

Including 104.34 118.25 13.91 1.14 Note 3)

177.63 180.00 2.37 0.42 Note 3)

190.35 211.00 20.65 0.33 Note 3)

Including 190.35 192.00 1.65 1.92 Note 3)

240.55 246.75 6.20 0.62 Note 3)

266.50 333.50 67.00 0.31 Note 3)

Including 266.50 283.63 17.13 0.48 Note 3)

Including 279.00 283.63 4.63 1.18 Note 3)

Including 324.50 331.40 6.90 0.76 Note 3)

Table 4: Assay Results for 25-DH-1331A (note 25-DH-1331 stopped in fault prematurely,

recollared)

Drill hole From (m) To (m) Width (m) Gold (g/t) Apparent True

Thickness

26-DH-1331A 9.00 16.00 7.00 0.35 Note 3)

50.60 120.00 69.40 0.99 Note 3)

Including 73.50 93.00 19.50 1.86 Note 3)

209.00 215.00 6.00 0.31 Note 3)

231.00 234.60 3.60 0.36 Note 3)

Table 5: Assay Results for 26-DH-1332

Drill hole From (m) To (m) Width (m) Gold (g/t) Apparent True

Thickness

26-DH-1332 48.00 211.00 163.00 0.42 Note 3)

Including 48.00 62.00 14.00 1.19 Note 3)

Including 50.00 55.40 5.40 1.95 Note 3)

Including 134.00 166.00 32.00 0.92 Note 3)

Including 161.50 165.00 3.50 5.97 Note 3)

325.00 370.00 45.00 0.57 Note 3)

Including 325.00 331.00 6.00 1.45 Note 3)

Including 327.60 330.00 2.40 3.27 Note 3)

Including 345.00 364.00 19.00 0.80 Note 3)

Notes for Table 1 to Table 5:

1. Reported intersections are calculated using a 0.15 g/t Au cut-off grade.

2. The complete assay table is available on the Company’s website

3. True thickness of mineralization is unknown as the project is still at the exploration stage

The integration of assay results from these five exploration drill holes strengthens the overall

continuity for the new Orca Fault target and the association of higher-grade mineralization over a

strike length of 530 m, northwest to southeast (see Figure 3). Stronger continuity is also now

being developed spanning multiple, parallel, adjacent drill sections ranging over 200 m,

northeast to southwest, at the widest point along the 530 m, main Orca Fault target trend (see

Figure 2).

Figure 3 illustrates the locations for five drill hole results outlined in this news release and the

drill holes currently in the assay lab, or in process of being drilled. Drill collar location

coordinates are summarized for the 2025 Fall Drill Program in Table 6 at the end of this news

release.

Qualified Person

Julian Manco, M.Sc., P.Geo., Director of Exploration with Spanish Mountain Gold, is the

Qualified Person as defined under National Instrument 43-101 who has reviewed the technical

information in this news release and has approved the content for dissemination.

Abbreviations: metres = m, grams per tonne = g/t, CRM = certified reference material, gold =

Au, mineral resource estimate = MRE, Spanish Mountain Gold = SMG, quality control = QC,

quality assurance and quality control (QAQC)

Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program

(QAQC)

Once received from the drill and processed, all drill core samples were sawn in half, labeled, and

bagged. The remaining half of the drill core was securely stored on-site. Numbered security tags

were applied to sample shipments to ensure chain of custody compliance. The Company inserts

quality assurance and quality control (QAQC) samples at regular intervals, including blanks and

reference materials, for all sample shipments to monitor laboratory performance.

Standards and blanks account for a minimum of 20% of the samples in addition to the

laboratory’s internal quality assurance programs. The QAQC program was overseen by the

Company’s Qualified Person, Julian Manco, P.Geo, Director of Exploration (as described

below).

The data verification process involved a multi-step approach to ensure accuracy and integrity.

This included a detailed quality control (QC) analysis of the data, which was performed using

both internal and external platforms, such as the MxDeposit™ software. These QC checks

involved the analysis of certified reference materials (CRMs), blanks, and duplicates to confirm

the reliability of the assay results. In addition, a field inspection of the specific drill intervals

mentioned in this release has been conducted to directly observe the geological features and

verified the nature of the results presented.

Drill core samples were submitted to MSALABS’s analytical facility in Prince George, British

Columbia, for sample preparation and PhotonAssayTM analysis. The MSALABS facilities are

accredited to the International Standards ISO/IEC 17025 and ISO 9001 standard for gold and

multi-element assays, with all analytical methods incorporating quality control materials at

defined frequencies and established data acceptance criteria. MSALABS Inc. is independent of

the Company.

PhotonAssayTM

The PhotonAssayTM method utilizes gamma ray analysis for gold detection using the Chrysos

PhotonAssayTM instrument (PA1408X). This non-destructive, fully automated technique offers

high accuracy for analyzing ores and pulps. Sample preparation begins with drying and crushing

up to 1 kg of material to achieve at least 70% passing through a 2-millimetre (mm) sieve. The

sample is then riffle split to obtain a suitable aliquot for 2 testing cycles (MSALABS Method

CPA-Au1). The PhotonAssayTM instrument bombards 400- to 600-gram samples contained in

sealed containers with gamma rays.

These containers remain sealed throughout the process, preserving the sample for potential

further testing. The analysis is performed robotically, with results that integrate into existing

laboratory management systems. Each sample is accompanied by a reference disc traceable to a

Certified Reference Material (CRM). Both the sample and reference disc undergo gamma ray

exposure, with signals detected and analyzed to ensure accurate and reliable results. The method

offers a gold detection range from 0.015 parts per million (ppm - lower limit) to 10,000 ppm

(upper limit). Quality control includes the use of reference materials and blanks, with all results

reviewed by a competent person before reporting.

Spanish Mountain Gold implemented two QAQC methodologies to validate the accuracy of

PhotonAssayTM results, both demonstrating good comparability: 1) comparative analysis of

diverse mineralization styles using Total Au screen metallic methods with both FAS-415

(gravimetric finish) and FAS-211 (AAS finish), and 2) comprehensive testing of both sample

aliquots and rejects using FAS-211 (AAS finish). QAQC Testing typically can include the

following spot checks: 1) Pulverizing tests to evaluate variability in sample preparation, 2)

Cross-analysis at external laboratories using screen metallic method, and 3) Five-cycle radiation

testing to identify and calibrate potential variability in gold results with variable radiation

intensity.

Multi-Elemental Analysis

For the 2025 drilling campaign Spanish Mountain Gold used IMS-230 method to provide multi-

element determination using a five-acid digestion followed by ICP-OES and ICP-MS analysis.

Key Process Steps:

Sample Preparation: Samples are dried and ground to a specific criterion (85% passing 75

microns (μm) for rocks and drill core; 180μm for soils and sediments). A homogeneous 10-gram

sample is required. Digestion: Samples undergo sequential digestion with nitric, perchloric,

hydrofluoric, and hydrochloric acids, followed by dilution with deionized water.

Analysis: The solution is analyzed via ICP-OES and ICP-MS for multi-element quantification.

Quality Control: The process includes reference materials, blanks, and duplicates, with

corrections for spectral interferences and thorough review before final reporting.

About Spanish Mountain Gold Ltd.

Spanish Mountain Gold Ltd. is focused on advancing its 100%-owned Spanish Mountain Gold

Project (Project) towards its goal to build the next gold mine in the Cariboo Gold Corridor,

British Columbia. On August 18, 2025, the Company filed an NI 43-101 Technical Report on

SEDAR+ that sets out the Project’s de-risked and optimized Preliminary Economic Assessment

(PEA), with an updated Mineral Resource Estimate (MRE). We will continue to advance the

Project to position the Company to make a construction decision in 2027. We are striving to be a

leader in community and Indigenous relations by leveraging technology and innovation to build

the 'greenest' gold mine in Canada. The Relentless Pursuit for Better Gold means seeking new

ways to achieve optimal financial outcomes that are safer, minimize environmental impact and

create meaningful sustainability for communities. Details on the Company are available on

www.sedarplus.ca and on the Company's website: www.spanishmountaingold.com.

On Behalf of the Board,

“Peter Mah”

President, Chief Executive Officer and Director

Spanish Mountain Gold Ltd.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

FORWARD-LOOKING INFORMATION:

Certain of the statements and information in this press release constitute "forward-looking

information". Any statements or information that express or involve discussions with respect to

predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or

performance (often, but not always, using words or phrases such as "expects", "anticipates",

"believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives",

"potential" or variations thereof or stating that certain actions, events or results "may", "could",

"would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms

and similar expressions) are not statements of historical fact and may be considered forward-

looking information. The Company's forward-looking information is based on the assumptions,

beliefs, expectations and opinions of management as of the date of this press release and include

but are not limited to statements with respect to, the potential for adding more higher-grade gold

mineralization within the pit or outside the current pit design; and the receipt of further results

from additional drilling under the 2025 Fall Drill Program, and the plan to make a construction

decision in 2027. Other than as required by applicable securities laws, the Company does not

assume any obligation to update forward-looking information if circumstances or management's

assumptions, beliefs, expectations or opinions should change, or changes in any other events

affecting such statements or information. For the reasons set forth above, investors should not

place undue reliance on forward-looking information.

Table 6: Drill Collar Information for Drill Holes

Hole ID EAST NORTH ELEV AZIMUTH DIP DEPTH COMMENT

26-DH-1342 604249 5827917 1128 120 -60 N/A In Progress

26-DH-1341 604224 5827935 1123 120 -60 N/A In Progress

26-DH-1340

604267 5827952 1120 120 -60 372

Successfully

completed per design

26-DH-1339

604192 5827937 1127 120 -60 387

Successfully

completed per design

26-DH-1338

604205 5827977 1125 120 -60 390

Successfully

completed per design

26-DH-1337

604237 5828049 1098 120 -60 402

Successfully

completed per design

26-DH-1336

604284 5827966 1109 120 -60 390

Successfully

completed per design

26-DH-1335

604292 5828064 1095 120 -60 415

Successfully

completed per design

26-DH-1334

604254 5827971 1116 120 -60 354

Successfully

completed per design

26-DH-1333

604236 5828012 1104 120 -60 366

Successfully

completed per design

26-DH-1332

604185 5828088 1091 120 -65 372

Successfully

completed per design

26-DH-1331A

604595 5827901 1103 120 -60 240

Successfully

completed per design

26-DH-1331

604594 5827899 1103 120 -60 55

Ended early due stuck

drill rods in fault

26-DH-1330

604332 5827990 1105 120 -60 351

Successfully

completed per design

26-DH-1329

604467 5827962 1090 120 -60 255

Successfully

completed per design

26-DH-1328

604278 5828018 1105 120 -58 402

Successfully

completed per design

26-DH-1327

604411 5828026 1088 120 -60 327

Successfully

completed per design

26-DH-1326

604327 5827963 1108 120 -60 351

Successfully

completed per design

25-DH-1325 604385 5827966 1103 120 -60 309

Successfully

completed per design

25-DH-1324 604343 5828053 1080 120 -60 276

Successfully

completed per design

25-DH-1323 604286 5828046 1097 120 -60 338

Successfully

completed per design

25-DH-1322 604279 5827995 1106 120 -60 231

Successfully

completed per design

25-DH-1321 604350 5828016 1099 120 -60 348

Successfully

completed per design

25-DH-1320 604561 5827809 1126 120 -60 57

Ended early due to

major fault zone

25-DH-1319 604404 5827992 1095 120 -70 198

Successfully

completed per design

25-DH-1318 604445 5828098 1055 120 -60 243

Successfully

completed per design

25-DH-1317 604186 5828166 1076 120 -60 282

Successfully

completed per design

25-DH-1316 604514 5828073 1050 120 -60 177

Successfully

completed per design

25-DH-1315 604231 5828163 1075 120 -60 282

Successfully

completed per design

25-DH-1314 604160 5828218 1056 120 -70 270

Successfully

completed per design

25-DH-1313 604566 5827908 1100 120 -60 204

Successfully

completed per design

25-DH-1312 604538 5827921 1095 120 -60 205

Successfully

completed per design

25-DH-1311 604590 5827935 1084 120 -60 330

Successfully

completed per design

25-DH-1310 604592 5827961 1091 120 -60 211

Successfully

completed per design

25-DH-1309 604592 5827958 1071 120 -60 237

Successfully

completed per design