Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SPA.V ·

Spanish Mountain Gold Activates First Module of Field Program

Exploration Programs

1120‐1095 West Pender Street

Vancouver, British Columbia, V6E 2M6

Tel: 604.601.3651  

August 20, 2020 

Spanish Mountain Gold Activates First Module of Field Program 

Vancouver,  BC.    Spanish  Mountain  Gold  Ltd. ( “Spanish  Mountain”  o r  t h e  “Company”)  (TSX‐V:  SPA)  is 

pleased to announce that its technical team and contractors have been mobilized to the project site near 

Likely,  B.C.  to  execute  the  first  module  of  the  field  program  for  its  Spanish  Mountain  gold  project  (the 

“Project”).   The Company  expects the summer program to contribute signi ficantly to  the realization of 

the dual objectives of fast tracking the Project’s Phase 1 to b e “shovel ready” and expanding the multi‐

million ounce gold resource as stated in a news release dated August 10, 2020. 

In  accordance  with  the  health  and  safety  protocols  mandated  by  the  health  authorities,  company 

personnel  have  put  in  place  various  safety  features  and  procedures  that  will  be  strictly  enforced  by 

management  on‐site  throughout  the  duration  of  the  field  program .    The  camp  and  the  enhanced 

operating procedures have been inspected and approved by the pr ovincial health agency.  Management 

b e l i e v e s  t h a t  t h e  n e c e s s a r y  p r e c a u t i o n s  h a v e  b e e n  t a k e n  t o  s a f eguard  the  health  of  our  employees, 

consultants and community members and to avoid potential interruptions to the field work.   

The first module of the field program will last approximately s ix weeks and will immediately be followed 

by a drilling campaign designed to further expand the Project’s  multi‐million ounce gold resource.  This 

first module consists of a series of geotechnical drill holes a nd test pits that will develop additional data 

to  sustain  the  proposed  project  infrastructure  as  outlined  in  t he  Preliminary  Economic  Assessment 

(“PEA”) filed in December 2019, which delineates the Project’s  current mineral resource.  The program 

will also develop additional data that will assist in the evalu ation of the potential for an expanded Phase 

1 scenario as part of the Preliminary Feasibility Study that co uld be undertaken later this year.  The field 

program will be monitored by independent engineers from Knight Piésold Ltd. 

The latest PEA highlighted the potential viability of Phase 1 operations, which target exclusively the near‐

surface/  higher‐grade  portion  of  the  mineral  deposit,  comprising  l e s s  t h a n  3 0 %  o f  t h e  m e a s u r e d  a n d  

indicated  ounces  of  the  Project’s  multimillion  ounce  gold  resou r c e .   T h e  C o m p a n y  b e l i e v e s  t h a t  a n  

expanded  Phase  1,  if  supported  by  the  underlying  data,  may  further  enhance  the  potential  economics 

and multiple key metrics of the Project.   

Larry  Yau,  CEO,  commented:  “In  just  over  a  month,  we  have  achieved  full  funding  for  our  dual  project 

objectives  and  successful  mobilization  for  our  summer  program.  I  b e l i e v e  i t  s p e a k s  v o l u m e s  f o r  o u r  

technical  team’s  competence  and  effectiveness  as  well  as  the  st rong  support  from  our  expert 

consultants.  We look forward to a productive field program tha t could potentially add significant value 

to our Project.” 

About Spanish Mountain Gold 

Spanish  Mountain  Gold  Ltd.  is  focused  on  advancing  its  multi‐mi llion  ounce  Spanish  Mountain  gold 

project in southern central British Columbia.  The Project is f ully funded to pursue the dual objectives of 

fast  tracking  Phase  1  of  the  Project  to  be  “shovel  ready”  and  actively  expanding  the  mineral  resource. 

Phase  1  focuses  on  the  pit‐delineated  high‐grade  core  of  the  deposit  that  is  potentially  expected  to 

sustain a stand‐alone operation of 11 years.  The potential via bility of Phase 1 has been demonstrated in 

a  Preliminary  Economic  Assessment.    The  PEA  illustrates  the  project  potential  with  a  combination  of 

modest  capital  requirements  ( US$270m)  and  low  operating  cost  ( AISC  $549/oz)  over  its  mine  life.  

Additional information on  the PEA and  about the Company is avai lable on  www.sedar.com  and on the 

Company’s website: www.spanishmountaingold.com 

On Behalf 

of the Board, 

SPANISH MOUNTAIN GOLD LTD. 

Larry Yau 

Chief Executive Officer 

Inquiries:  

SPANISH MOUNTAIN GOLD LTD. 

Phone: (604) 601‐3651 

E‐mail: [email protected]  

Website: www.spanishmountaingold.com 

Neither  TSX  Venture  Exchange  nor  its  Regulations  Services  Provider  (as  that  term  is  defined  in  policies  of  the  TSX  Venture 

Exchange) accepts responsibility for the adequacy or accuracy of this release. 

FORWARD LOOKING STATEMENTS: Certai n of the statements and infor mation in this press release  constitute "forward‐looking 

statements"  or  "forward‐looking  information",  including  statements  regarding  the  completion  of  the  Preliminary  Feasibility 

Study on the Spanish Mountain Project.  Further, any statements or information that express or involve  discussions with respect 

to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but  not 

always, using words or phrases such as "expects", "anticipates" , "believes", "plans", "estimates", "intends", "targets", "goal s", 

" f o r e c a s t s " ,  " o b j e c t i v e s " ,  " p o t e n t i a l "  o r  v a r i a t i o n s  t h e r e o f  o r  stating  that  certain  actions,  events  or  results  "may",  "could", 

"would", "might" or "will" be taken, occur or be achieved, or t he negative of any of these terms and similar expressions) are  not 

statements of historical fact and may be forward‐looking statements or information. 

This  news  release  contains  forward‐looking  information,  which  involves  known  and  unknown  risks,  uncertainties  and  other 

factors  that  may  cause  actual  events  to  differ  materially  from  current  expectation.  Important  factors  that  could  cause  actual 

results to differ materially from the Company's expectations are  disclosed in the Company's documents filed from time to time  on 

SEDAR  (see www.sedar.com).    Readers  are  cautioned  not  to  place  undue  reliance  on  these forward‐looking  statements,  which 

speak only as of the date of this press release.  The company disclaims any intention or obligation, except to the extent required 

by law, to update or revise any forward‐looking statements.