Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SOMA.V ·

Soma Updates Exploration Results

Drill Results

Soma Updates Exploration Results

Highlights Include 0.6 Meters @ 50.4 gpt and

0.3 Meters @ 23.0 gpt

VANCOUVER, BC

,

March 18, 2021

/CNW/ -

Soma Gold Corp.

(TSXV: SOMA) (OTC: SMAGF)

(WKN: A2P4DU) (the "

Company

" or "

Soma

") is pleased to announce new drilling results for the on-

going exploration program at the Company's properties in Antioquia,

Colombia

.

Highlights

Drilling results at the Cordero-Balvina project continues to demonstrate the continuity of high

gold grades at depth.

Drill hole LDDH_21_04

(

0.6m

of 50.4g/mt gold and

0.3m

of 23.0g/mt gold)

has confirmed the

vein continuity below the deepest level of Limon mine.

First drill hole at Alacran-Diamantina has intercepted

5.43g/mt gold over

0.70m

.

Cordero-Balvina Project

The current round of drilling at Cordero-Balvina commenced in early

November 2020

. The fifteen drill

holes, totaling

4,200 m

, reported in this press release represent approximately 50% of the planned

program and was completed by the end of February. The remaining drilling (~4,000m) will be

completed by the end of

June 2021

. The Cordero-Balvina target is located 3km to the southeast of

the La Ye and Mangos operations.

The drilling has confirmed the continuity of the high grade gold at depth

(see cross-section #1)

which will be easily accessible through the new mine portal currently under construction. The high

grade mineralization remains open to the north and down-dip.

Highlights include:

Drill hole

BCDDH_21_104

intersected

2.30 meters

, from 186.10 to

188.40m

, of milky quartz-

carbonates vein with veining of sulphides mainly pyrite followed by galena and chalcopyrite and

small content of tellurides, grading

4.05 g/t Au

.

Drill hole

BCDDH_21_105

intersected

2.30 meters,

from 201.40 to

203.70m

, of milky quartz-

carbonates vein with veining of pyrite-galena-tellurides, grading

12.45 g/t Au.

The above includes

0.70 meters

of fine-grained veining of galena-tellurides, grading

33.20

g/t Au

, starting at 201.40 meters.

Drill hole

BCDDH_21_106

intersected

2.40 meters

, from 195.9 to

199.6m

, of milky quartz-

carbonates vein with veining of sulphides mainly fine-grained pyrite, galena and tellurides,

grading

2.37 g/t Au

.

The above includes

0.90 meters

of fine-grained veining of galena-tellurides, grading

18.35

g/t Au

, starting at 218.10 meters.

Results to date on the in-fill drilling program at Cordero-Balvina:

Location

Hole ID

From

To

From

To

Length

Length

Au

(m)

(m)

(ft)

(ft)

(m)

(ft)

(g/t)

BCDDH_20_092

215.2

216

706.07

708.70

0.80

2.62

0.76

BCDDH_20_093

198.4

201.4

650.95

660.79

3.00

9.84

4.60

Including

198.40

199.40

650.95

654.23

1.00

3.28

7.36

Including

199.40

200.40

654.23

657.51

1.00

3.28

3.70

Including

200.40

201.40

657.51

660.79

1.00

3.28

2.75

BCDDH_20_094

196.5

198.5

644.72

651.28

2.00

6.56

8.10

Including

196.50

197.50

644.72

648.00

1.00

3.28

14.20

Including

197.50

198.50

648.00

651.28

1.00

3.28

1.99

BCDDH_20_095

241.33

241.90

791.80

793.67

0.57

1.87

0.03

CORDERO BALVINA

BCDDH_20_096

213.00

214.50

698.85

703.77

1.50

4.92

13.47

Including

213.00

213.60

698.85

700.82

0.60

1.97

1.32

Including

213.60

214.20

700.82

702.79

0.60

1.97

20.40

Including

214.20

214.50

702.79

703.77

0.30

0.98

23.90

BCDDH_20_097

238.80

239.70

783.50

786.46

0.90

2.95

0.41

Including

238.80

239.10

783.50

784.49

0.30

0.98

0.57

Including

239.10

239.70

784.49

786.46

0.60

1.97

0.33

BCDDH_20_098

261.95

262.50

859.46

861.26

0.55

1.80

0.01

BCDDH_20_099

216.60

217.10

710.66

712.31

0.50

1.64

9.62

BCDDH_20_100

212.85

213.15

698.36

699.35

0.30

0.98

38.90

and

221.10

221.95

725.43

728.22

0.85

2.79

0.03

BCDDH_20_101

195.90

199.60

642.75

654.89

3.70

12.14

2.37

Including

195.90

196.90

642.75

646.03

1.00

3.28

1.15

Including

196.90

197.90

646.03

649.31

1.00

3.28

2.06

Including

197.90

198.90

649.31

652.59

1.00

3.28

0.50

Including

198.90

199.60

652.59

654.89

0.70

2.30

7.23

BCDDH_21_102

200.25

200.60

657.02

658.17

0.35

1.15

0.01

BCDDH_21_103

194.80

196.30

639.14

644.06

1.50

4.92

0.01

Including

194.80

195.55

639.14

641.60

0.75

2.46

0.01

Including

195.55

196.30

641.60

644.06

0.75

2.46

0.01

BCDDH_21_104

186.10

188.40

610.59

618.14

2.30

7.55

4.05

Including

186.10

186.70

610.59

612.56

0.60

1.97

0.60

Including

186.70

187.40

612.56

614.86

0.70

2.30

1.35

Including

187.40

188.40

614.86

618.14

1.00

3.28

8.02

BCDDH_21_105

201.40

203.70

660.79

668.34

2.30

7.55

12.45

Including

201.40

202.10

660.79

663.09

0.70

2.30

33.20

Including

202.10

202.75

663.09

665.22

0.65

2.13

2.45

Including

202.75

203.70

665.22

668.34

0.95

3.12

4.01

BCDDH_21_106

217.20

219.60

712.63

720.51

2.40

7.87

8.12

Including

217.20

218.10

712.63

715.59

0.90

2.95

3.23

Including

218.10

219.00

715.59

718.54

0.90

2.95

18.35

Including

219.00

219.60

718.54

720.51

0.60

1.97

0.12

*Widths reported are drilled core lengths. Drill holes were oriented to be perpendicular to the dip of the veins, and management believes the reported intersections approximate

their true widths.

West to East Cross-Section #1 showing the mineral resource classification of Cordero-Balvina

project made by RPA (see NI-43-101 report) and vein interception of drill-holes 105 and 106. (CNW

Group/Soma Gold Corp.)

Deep Limon Project

The Deep Limon project is located 14km to the southwest of the La Ye and Mangos operations. The

drilling program is designed to test the down-dip continuity of the historical El Limon vein. After a 3D

geological and structural modelling exercise incorporating old channel samples and underground

mapping, an initial drilling program of

3,000m

was designed. The four drill holes, totaling 1,480mm,

reported in this press release, represent approximately 50% of the planned program and were

completed by the end of February. Drill hole interceptions of the current program confirms the

presence of the Limon vein at the footwall of the

Victoria

fault, which was historically interpreted as

the down-dip limit of the deposit at the El Limon mine

(see cross-section #2).

Although further

drilling is needed to define potential mineral resources below the deepest level of the El Limon mine,

the preliminary results are encouraging as they confirm the potential down-dip extension of the high

grade El Limon vein.

Highlights include:

Drill hole

L

DDH_21_04

intersected

0.60 meters

, from 358.30 to

358.90m

, of milky quartz-

carbonates vein with veining of sulphides mainly pyrite and sphalerite, grading

50.40 g/t Au

, and

0.30 meters,

from 397.85 to

398.15m

of milky quartz-carbonates vein with sphalerite and pyrite

disseminated, grading

23.0 g/t Au.

Results to date on the in-fill drilling program at Deep Limon project:

Location

Hole ID

From

To

From

To

Length

Length

Au

(m)

(m)

(ft)

(ft)

(m)

(ft)

(g/t)

Deep Limon

LDDH_20_01

287.70

287.80

943.94

944.27

0.10

0.33

0.23

LDDH_20_02

No Significant Intercepts

LDDH_20_03

No Significant Intercepts

LDDH_20_04

358.30

358.90

1175.58

1177.55

0.60

1.97

50.40

and

397.85

398.15

1305.35

1306.33

0.30

0.98

23.0

* Widths reported are drilled core lengths. Drill holes were oriented to be perpendicular to the dip of the veins, and management believes the reported intersections approximate

their true widths.

West to East Cross-Section #2 showing vein interceptions of drill hole LDDH_21_004, confirming the

vein continuity at the footwall of Victoria fault. (CNW Group/Soma Gold Corp.)

Alacran-Diamantina Project

The Alacran-Diamantina project is located to the south of the El Limon mine. The presence of high

gold grade was historically exploited by small miners' workings (Alacran, Delirios and Diamantina).

Soma's team has built a new 3D model integrating old channel samples, mapping and mining data

for this under explored mineralized trend. The planned drilling program of

3,500m

is aimed to test the

down-dip continuity of the main mineralized trend that was mined in the past by local miners

(see

cross-section # 3)

.

The drilling commenced in February with drill hole ADDDH_21_01. This first drill hole intercepted a

quartz-carbonate vein with disseminated pyrite, sphalerite and galena which was projected based on

the geological modelling. The drilling program will be completed by the end of

June 2021

.

Results to date on the drilling program at Alacran-Diamantina project:

Location

Hole ID

From

To

From

To

Length

Length

Au

(m)

(m)

(ft)

(ft)

(m)

(ft)

(g/t)

AD

ADDDH_21_01

48.30

49.00

158.47

160.77

0.70

2.30

5.43

*Widths reported are drilled core lengths. Drill holes were oriented to be perpendicular to the dip of the veins, and management believes the reported intersections approximate their

true widths.

North to South cross-section #3 showing the under explored Alacran-Diamantina mineralized trend

and vein interception of drill hole ADDDH_21_01. Planned drill holes will be completed by the end of

Q2. (CNW Group/Soma Gold Corp.)

Javier Cordova

, Soma's President and CEO, states, "the latest drill results corroborate the

geological modelling and the thesis of continuity of the mineralized trend along the Otu Valley fault

system. The geological modelling, supported by the sampling taken in the historical small miner

workings, suggests that vein widths and grades continue over more than 2 km of the company's

property. This section represents about 15% of the Company's mineral rights in the Otu Valley. The

team is very encouraged by these results and look forward to continued success as the drilling

program continues to build out a picture of the resource."

QA/QC CONTROLS

For exploration core drilling, the company applied its standard protocols for sampling and assay. NQ

core is sawn or split with one-half shipped to a sample preparation laboratory in

Medellin

run by ALS

Colombia Limited ("ALS"). Samples are then shipped for analysis to an ALS-certified assay

laboratory in

Toronto, Canada

and

Lima

, Perú. The samples were analyzed for gold using standard

fire-assay on a 50-gram sample with an AA finish. Multi-element geochemistry was determined by

ICP-MS using either aqua regia (ME-MS41) or four acid (ME-MS61) digestions. Blanks, duplicates

and certified reference standards are inserted into the sample stream to monitor laboratory

performance. Comparison to control samples and their standard deviations indicates acceptable

accuracy of the assays and no detectible contamination. The remainder of the core is stored in a

secured storage facility for future assay verification.

Mr.

Edwin Naranjo Sierra

, FAusIMM, MSc, Senior geologist, Director of Exploration for Soma Gold

Corp. is the Qualified Person, within the meaning of NI 43-101. Mr. Naranjo is satisfied that the

analytical procedures and best practices used are standard industry methodologies, and he has

reviewed and approved the technical information disclosed in this news release.

ABOUT SOMA GOLD:

Soma Gold Corp. (TSXV: SOMA) is a mining company focused on gold production and exploration.

The Company owns two adjacent mining properties in Antioquia,

Colombia

with a combined milling

capacity of 675 tpd. (permitted for 1,400 tpd). The El Bagre mill is currently operating and

producing. Internally generated funds will be used to finance a regional exploration program.

The Company also owns an exploration and development property near Tucuma, Para State,

Brazil

.

On behalf of the Board of Directors

"Javier Cordova Unda"

Chief Executive Officer and President

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

All statements, analysis and other information contained in this press release about anticipated

future events or results constitute forward-looking statements. Forward-looking statements are

often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan",

"estimate", "expect" and "intend" and statements that an event or result "may", "will", "should",

"could" or "might" occur or be achieved and other similar expressions. Forward-looking statements

are subject to business and economic risks and uncertainties and other factors that could cause

actual results of operations to differ materially from those contained in the forward-looking

statements. Forward-looking statements are based on estimates and opinions of management at the

date the statements are made. The Company does not undertake any obligation to update forward-

looking statements even if circumstances or management's estimates or opinions should change

except as required by applicable laws. Investors should not place undue reliance on forward-looking

statements.

SOURCE

Soma Gold Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2021/18/c2311.html

%SEDAR: 00030511E

For further information:

For further information, please contact Andrea Laird, telephone: +1-604-

259-0302

CO: Soma Gold Corp.

CNW 06:15e 18-MAR-21