Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SNG.V ·

Silver Range Resources Ltd. Closes Second Tranche of Private Placement, Provides Updates ON Exploration and the Filing of Interim Financial Statements

Financings Financials

Suite 1016 – 510 West Hastings Street

Vancouver, B.C. V6B 1L8

Tel: 604-687-2522

www.silverrangeresources.com

TSX-V: SNG

SILVER RANGE RESOURCES LTD. CLOSES SECOND TRANCHE OF PRIVATE

PLACEMENT, PROVIDES UPDATES ON EXPLORATION AND THE FILING OF

INTERIM FINANCIAL STATEMENTS

Vancouver, B.C. , May 28, 2020 - Silver Range Resources Ltd. (TSX-V: SNG) (“Silver

Range”) announces the closing of the second tranche of the private placement announced

February 11, 2020. The second tranche consisted of the issuance of 5,225,000 units at a price of

$0.08 per unit, for gross proceeds of $ 418,000. Each unit consisted of one common share and

one share purchase warrant, with each warrant entitling the holder to purchase one additional

common share at a price of $0.16 until May 26, 2022, provided that in the event the closing price

of Silver Range’s s hares is $0. 20 or greater for a period of ten consecutive trading days

subsequent to the expiry of the statutory hold period, Silver Range will have the right to p rovide

all warrant holders with notice that the expiry date for the warrants has been shortened to thirty

calendar days from the giving of such notice.

All of the s ecurities issued as part of this second tranche will be subject to a hold period in

Canada expiring on September 27, 2020. No finder’s fees were paid and an insider, Strategic

Metals Ltd., purchased 2,000,000 units for proceeds of $160,000.

Exploration update

In late April, Silver Range conducted a brief sampling program at the Tree River Project . At

Tree River, Archean conglomerate hosts gold together with sulphides and carbonaceous material

in a setting analogous to that found in the Witwatersrand of South Africa and the Pilbara district

in Australia. Sampling by Silver Range at the Main Zone, originally explored by BHP Billiton

and Strongbow Exploration returned grab samples up to 114 g/t Au and a chip sample returned

0.20 m @ 540 g/t Au . This zone is exposed intermittently over a strike length of 650 m, is

strongly silicified and contains visible gold at the highest-grade exposure. The West Zone is 3.6

km along strike and returned grab samples up to 14.05 g/t Au . The April 2020 sampling

consisted of collecting one metre by one metre sawn panel samples in excess of 40 kilograms to

obtain a mo re representative indication of the bulk concentration of gold in bedrock. Samples

were collected at the Main and West Zones. Results are pending.

Silver Range has resumed operations in Nevada. Geophysical surveys and trenching are planned

at the Loner Property where surface mineralization exposed in old workings returned 1.83 m @

25.7 g/t Au from the brow of an adit and grab samples up to 16.60 g/t Au. At the East Gold

Point Property, geochemical and geophysical surveys together with mapping and sampling are

planned to investigate the inferred eastern extension of mineralization mined beneath the town of

Gold Point. Reconnaissance work will also be conducted on several new targets.

Interim Financial Statements

2

Silver Range also announces that as a result of the COVID -19 pandemic, it has experienced

delays associated with the limited availability of its internal accountants in connection with the

preparation of its interim financial statements and related Management’s Discussion and

Analysis (“MD &A”) for the period ended March 31, 2020. In response to similar issues

experienced by ot her businesses, the Canadian Securities Administrators have granted blanket

relief for all market participants, providing up to a 45-day extension for periodic filings normally

required to be made on or before May 30, 2020.

In accordance with the blanket relief, Silver Range will delay the filing of its interim financial

statements for the period ended March 31, 2020, the MD & A for the corresponding period and

related management certifications of interim filings. Silver Range intends to file these

documents prior to mid -June under the terms of the 45 -day extension announced by the British

Columbia Securities Commission under BCI 51 -515, dated March 23, 2020. Until such time as

the filings are made, Silver Range’s management and other insiders are subject to a trading

blackout that reflects the principles contained in Section 9 of National Policy 11 -207 – Failure to

File Cease Trade Orders and Revocations in Multiple Jurisdictions.

Other than as disclosed in Silver Range’s press releases, there have not b een any material

business developments since the date on which it filed its annual financial statements and related

MD & A for the fiscal year ended December 31, 2019.

About Silver Range Resources Ltd.

Silver Range is a precious metals prospect generator working in Nevada and Northern Canada .

It has assembled a portfolio of 45 properties, 8 of which are currently under option to others .

Silver Range is actively seeking other joint venture partners to e xplore the high precious metal

targets in its portfolio.

ON BEHALF OF SILVER RANGE RESOURCES LTD.

“Michael A. Power”

President and Chief Executive Officer

For further information concerning Silver Range or its exploration projects please contact:

Investor Inquiries

Richard Drechsler

Vice-President, Communications

Tel: (604) 687-2522

NA Toll-Free: (888) 688-2522

[email protected]

http://www.silverrangeresources.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

This news release may contain forward looking statements based on assumptions and judgments

of management regarding future events or results that may prove to be inaccurate as a result of

3

exploration and other risk factors beyond its control, and actual results may differ materially

from the expected results.