Alianza Minerals Receives Class 3 Exploration Approval for Haldane Project, Yukon 10-year Mining Land Use Permit expires November 2028 2019 Program Planning Underway
Trading Symbol (TSX-V: ANZ)
410-325 Howe Street
Vancouver, British Columbia
Canada V6C 1Z7
Tel: (604) 687 3520
Fax: 1-888-889-4874
www.alianzaminerals.com
December 4, 2018 NR18-14
Alianza Minerals Receives Class 3 Exploration Approval for Haldane Project,
Yukon
10-year Mining Land Use Permit expires November 2028
2019 Program Planning Underway
Vancouver B.C. – December 4, 2018 - Alianza Minerals Ltd. (TSXV:ANZ) (“Alianza”
or the “Company”) is pleased to report that it has received a Class 3 Mining Land Use
approval for the Haldane Silver Project, located in the historic Keno Mining District,
Yukon Territory. This approval is valid until November 25, 2028 and is subject to the
standard restrictions and conditions contained in the Yukon Quartz Mining Act and the
Quartz Mining Land Use Regulations.
“The receipt of this approval for our exploration activities allows us to move forward
without delay at Haldane in 2019,” stated Jason Weber, P. Geo., president and CEO of
Alianza. “Planning is underway and will likely include additional trenching at our new
Bighorn anomaly and drilling at the Mount Haldane Vein System and Ross targets.”
Haldane Silver Property
The 8,579 hectare Haldane Silver Property is located 25 km west of Keno City, YT in
the western portion of the Keno Hill Silver District where companies such as Alexco
Resource Corp. and Metallic Minerals Corporation are currently exploring. Notably, the
access road to Victoria Gold Corp.’s Eagle Gold Mine crosses the northern portion of
the property. Mineralization in the district consists of structurally-controlled, silver-
bearing veins. Silver production began in the Keno district in 1913, with over 200 million
ounces of silver produced through 1989. Production statistics from the Yukon
government Minfile (2003) state that 4.87 million tonnes were mined at an average
grade of 1,389 g/t silver, 5.62% lead and 3.14% zinc in that time.
Mineralization at Haldane consists of galena, sphalerite, tetrahedrite and pyrargyrite,
with gangue of manganiferous siderite and quartz in veins, hosted within Keno Hill
quartzite in proximity to the Robert Service Thrust. This mineralization and setting bears
a strong resemblance to the main Keno Hill deposits. The Mt Haldane Veins System
(MHVS) forms the core target of the property and was the location of small high-grade
silver mining in the 1920s. Based on the 2018 field program, this target may have up to
3.5 km of strike length. The 2018 program was also successful in identifying a potential
new vein target 2.5 km northeast of the MHVS at the Bighorn anomaly.
About Alianza Minerals Ltd.
Alianza employs a hybrid business model of joint venture funding and self-funded
projects to maximize opportunity for exploration success. The Company currently has
gold, silver and base metal projects in Yukon Territory, British Columbia, Nevada and
Peru.
The Company has 45.1 million shares issued and outstanding and is listed on the TSX
Venture Exchange (TSX-V: ANZ).
Mr. Murray Jones, MSc, P.Geo., of Equity Exploration Consultants Ltd. is a Qualified
Person as defined by National Instrument 43-101. Mr. Jones supervised the preparation
of the technical information contained in this release.
For further information, contact:
Jason Weber, President and CEO
Sandrine Lam, Shareholder Communications
Tel: (604) 687-3520
Fax: (888) 889-4874
To learn more visit: www.alianzaminerals.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT
TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. STATEMENTS IN THIS
NEWS RELEASE, OTHER THAN PURELY HISTORIC AL INFORMATION, INCL UDING STATEMENTS
RELATING TO THE COMP ANY'S FUTU RE PLANS AND OBJECTI VES OR EXPECTED RESU LTS,
MAY INCLUDE FORWARD -LOOKING STATEMENTS. FORWARD-LOOKING STATEMENTS A RE
BASED ON NUMEROUS AS SUMPTIONS AND ARE SU BJECT TO ALL OF THE RISKS AND
UNCERTAINTIES INHERE NT IN RESOURCE EXPLO RATION AND DEVELOPME NT. AS A R ESULT,
ACTUAL RESULTS MAY V ARY MATERIALLY FROM THOSE DESCRIBED IN T HE FORWARD -
LOOKING STATEMENTS.