Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SNAG.V ·

2019 Fieldwork Commences at BP Property, NV

Exploration Programs

6212913 v2

Trading Symbol (TSX-V: ANZ)

410-325 Howe Street

Vancouver, British Columbia

Canada V6C 1Z7

Tel: (604) 687 3520

Fax: 1-888-889-4874

www.alianzaminerals.com

June 26, 2019 NR 19-07

2019 Fieldwork Commences at BP Property, NV

Alianza Minerals Ltd. (TSX-V: ANZ) (“Alianza” or the “Company”) reports that the 2019 phase I field

program at the Company’s BP project has commenced. The BP property is located in Elko County, 57

km south of Carlin, Nevada and 41 km northwest of the Bald Mountain Mine. The 2019 program is

funded by Hochschild Mining (US), Inc, a s ubsidiary of Hochschild Mining PLC under the terms of an

option agreement signed in March, 2019.

“Our field crews finished up the first phase of work at Horsethief and have now moved to BP, ” stated

Jason Weber, P.Geo, P resident and CEO of Alianza. “ BP is an early -stage prospect with little prior

work on it but is located in a prospective region with favourable indications including that a sediment -

hosted gold system is present on the property.”

BP Property

The BP property is located in Elko County, 57 km south of Carlin, Nevada and 41 km northwest of the

Bald Mountain Mine. The property has had little previous gold exploration prior to a reconnaissance

program in 2010 that identified gold -bearing jasperoid and anomalous gold and pathfinder

geochemistry on surface. Alianza conducted a mapping and prospecting program in 2017 that identified

potential structural conduits for mineralizing fluid flow as evidenced by anomalous pathfinder

geochemistry and the presence of barite, clay alteration and limonite staining near the intersections of

prominent structures. Additionally, the presence of feature such as solution collapse breccias

associated with barite and silicification in the proximity of gold mineralization suggest fluid-flow

conduits.

The 2019 program is expected to occur in two phases. The first consisting of mapping and geochemical

sampling will occur in June and July, with a second phase of detailed mapping and sampling, and

possibly geophysics to be completed in September.

About Alianza Minerals Ltd.

Alianza employs a hybrid business model of joint venture funding and self-funded projects to maximize

opportunity for exploration success. The Company currently has gold, silver and base metal projects in

Yukon Territory, British Columbia, Nevada and Peru. Alianza currently has four projects optioned out in

Nevada and Yukon Territory, and is actively exploring on two others. Alianza’s current partners include

Hochschild Mining PLC (LON: HOC) and Coeur Mining, Inc. (NYSE: CDE).

The Company has 60.5 million shares issued and outstanding and is listed on the TSX Venture

Exchange (TSX-V: ANZ).

Mr. Jason Weber, P.Geo., President and CEO of Alianza Minerals Ltd. is a Qualified Person as defined

by National Instrument 43-101. Mr. Weber supervised the preparation of the technical information

contained in this release.

6212913 v2

For further information, contact:

Jason Weber, President and CEO

Sandrine Lam, Shareholder Communications

Tel: (604) 687-3520

Fax: (888) 889-4874

To learn more visit: www.alianzaminerals.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM

IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE

ADEQUACY OR ACCURACY OF THIS RELEASE. STATEMENTS IN THIS N EWS RELEASE, OTHER T HAN

PURELY HISTORICAL INFORMATION, INCLUDING STATEMENTS RELATING TO THE COMPANY'S FUTURE

PLANS AND OBJECTIVES OR EXPECTED RESULTS, MAY INCLUDE FORWARD -LOOKING STATEMENTS.

FORWARD-LOOKING STATEMENTS A RE BASED ON NUMEROUS ASSUMPTIONS AND ARE SUBJECT TO

ALL OF THE RISKS AND UNCERTAINTIES INHERENT IN RESOURCE EXPLORATION AND DEVELOPMENT.

AS A RESULT, ACTUAL RESULTS MAY VARY MATERIALLY FROM THOSE DESCRIBED IN THE FORWARD-

LOOKING STATEMENTS.