Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SMN.V ·

Sun Summit Announces Final Winter 2022 Drilling Results on Buck Property; Drills 29.17 g/t Gold Equivalent over 1.0 Metre Within 3.11 g/t Gold Equivalent over 13.2 Metres at Buck Main, Demonstrating Strong High-Grade Potential

Drill Results

Sun Summit Announces Final Winter 2022

Drilling Results on Buck Property; Drills 29.17

g/t Gold Equivalent over 1.0 Metre Within 3.11

g/t Gold Equivalent over 13.2 Metres at Buck

Main, Demonstrating Strong High-Grade

Potential

Vancouver, British Columbia--(Newsfile Corp. - June 1, 2022) - Sun Summit Minerals Corp. (TSXV:

SMN) (OTCQB: SMREF) is pleased to report the final drill results from its winter 2022 exploration drill

program on its Buck Property, central B.C.

Highlights:

Intersected multiple zones of high-grade and bulk-tonnage style mineralization near the

centre of Buck Main:

BK22-069:

29.17 grams per tonne (g/t) gold equivalent (AuEq) over 1.0 metre

within 3.11

g/t AuEq over 13.2 metres

, within broader zone of 0.91 g/t AuEq over 69.8 metres.

Mineralization open in all directions:

The broad zone of vein-hosted, high-grade

intercepts, central to Buck Main, is unconstrained both laterally and at depth and open for

expansion in all directions.

Multiple broad intervals of near-surface, bulk-tonnage style mineralization identified on

the eastern side of Buck Main:

New drilling demonstrates strong grade continuity.

BK22-067:

2.68 g/t AuEq over 11.3 metres within a broad zone of 0.98 g/t AuEq over 67.6

metres

BK22-075:

2.22 g/t AuEq over 6.0 metres within a broad zone of 1.08 g/t AuEq over 63.5

metres

Notes:

1.

Intervals are downhole core lengths. True widths are unknown.

2.

Calculations are uncut and length-weighted using a 0.10 g/t gold cut-off.

3.

AuEq assumes metal prices of $1700/oz Au, $22/oz Ag and $1.60/lbs Zn using the equation:

AuEq(g/t) = ((Au(g/t)*$Au/oz*0.032151)+(Ag(g/t)*$Ag/oz*0.032151)+(Zn%*$Zn/lbs*22.0462))/($Au/oz*0.032151).

4. Assay results for individual metals for each AuEq calculation are reported in Table 1.

Sharyn Alexander, Sun Summit's President, stated: "The high-grade intersections in drill holes BK22-

068 and -069 supports our strong view that the Buck Main system has significant high-grade gold

potential. These holes were designed to target high-grade gold-silver-zinc mineralization central to the

system as outlined in previous programs - highlighted by discovery hole BK20-012. The remaining holes

targeted bulk-tonnage style mineralization on the eastern side of Buck Main and were successful in

identifying broad zones of disseminated mineralization in previously untested areas, outlining

considerable exploration potential. Planning for the summer exploration season is ongoing and we look

forward to additional step-out drilling at Buck Main as well as following up on exploration targets

throughout our large property package."

The nature of the high-grade mineralization at Buck Main is complex, hosted in discreet veins and

veinlets with numerous orientations all within broad zones of structural complexity. Based on new

observations and assay results, together with results from the previous grid-based program, the

comprehensive structural model is being refined to better inform the system-scale orientations of

preferential grade-controlling structures.

In addition to the considerable exploration potential west of Buck Main discovered in three step-out holes

(see news release dated

May 3

rd

, 2022

), the extent of near-surface bulk-tonnage style mineralization on

the eastern-side of Buck Main represents an important target. All holes drilled in this area, as well as

holes north of Bob Creek in the same host rocks, have so far intersected significant zones of

disseminated and local breccia-hosted mineralization. Continued efforts will be focused on investigating

the limits of this significant footprint of widespread mineralization.

Table 1. Assay Results

Hole ID

From (m)

To (m)

Int (m)

AuEq (g/t)

Au (g/t)

Ag (g/t)

Zn (%)

BK22-067

10.8

19.4

8.7

0.57

0.34

5.28

0.24

and

87.0

102.9

15.9

0.56

0.31

2.51

0.33

and

141.0

145.0

4.0

2.10

1.26

3.36

1.23

and

155.5

291.5

136.0

0.72

0.50

3.01

0.28

inc

165.4

233.0

67.6

0.98

0.77

2.56

0.27

inc

183.0

194.3

11.3

2.68

2.49

5.63

0.18

and

318.0

327.0

9.0

0.29

0.24

0.52

0.07

BK22-068

8.3

18.0

9.7

0.57

0.37

4.02

0.23

and

50.0

53.0

3.0

1.10

0.87

4.45

0.27

and

60.0

72.9

12.9

0.32

0.24

3.29

0.07

and

115.2

128.8

13.6

1.16

0.99

2.47

0.21

and

155.0

232.5

77.5

0.57

0.48

2.14

0.09

inc

204.6

232.5

27.9

1.02

0.91

1.56

0.13

inc

231.0

232.5

1.5

7.09

7.00

1.40

0.11

and

245.7

256.5

10.8

0.22

0.19

1.19

0.04

and

284.5

290.0

5.5

0.36

0.33

1.14

0.02

and

331.1

338.5

7.4

0.38

0.17

5.55

0.21

and

375.0

423.3

48.3

0.30

0.21

1.76

0.11

inc

416.0

423.3

7.3

0.75

0.72

0.89

0.03

BK22-069

4.0

8.3

4.3

1.24

1.10

4.68

0.12

and

34.0

36.5

2.5

2.27

1.55

8.50

0.94

and

159.9

163.8

3.9

0.23

0.19

2.69

0.01

and

188.5

257.7

69.2

0.27

0.17

1.49

0.12

and

309.2

379.0

69.8

0.91

0.76

6.93

0.09

inc

331.7

358.5

26.8

1.89

1.61

14.36

0.16

inc

331.7

344.9

13.2

3.11

2.75

22.99

0.09

inc

331.7

332.8

1.0

29.17

26.50

199.00

0.14

BK22-073

79.3

90.2

10.9

0.53

0.28

1.96

0.35

and

105.2

125.5

20.3

0.43

0.23

2.05

0.27

and

148.0

155.5

7.5

0.19

0.13

1.04

0.07

and

163.0

178.0

15.0

0.18

0.10

0.71

0.10

and

188.2

206.0

17.8

0.27

0.20

1.84

0.07

and

219.5

237.4

17.9

0.18

0.11

0.78

0.09

and

252.6

355.5

103.0

0.31

0.19

1.56

0.16

inc

318.2

330.8

12.6

0.56

0.49

2.14

0.05

and

384.0

387.0

3.0

0.28

0.17

3.25

0.11

BK22-074

44.0

274.2

230.2

0.50

0.35

2.02

0.18

inc

134.8

174.8

40.0

0.90

0.74

2.90

0.19

inc

153.0

174.8

21.8

1.12

0.97

3.71

0.16

and

290.7

308.0

17.3

0.41

0.35

2.30

0.05

BK22-075

10.0

38.0

28.0

0.23

0.13

1.15

0.12

and

58.0

449.0

391.0

0.56

0.26

3.53

0.39

inc

323.0

386.5

63.5

1.08

0.52

7.53

0.72

inc

323.0

329.0

6.0

2.22

1.37

11.15

1.09

inc

376.8

386.5

9.7

1.62

1.10

16.92

0.47

1. Intervals are downhole core lengths. True widths are unknown. Calculations are uncut and length-weighted using a 0.10 g/t gold cut-off.

2. AuEq assumes metal prices of $1700/oz Au, $22/oz Ag and $1.60/lbs Zn using the equation: AuEq(g/t) = ((Au(g/t)*$Au/oz*0.032151) +

(Ag(g/t)*$Ag/oz*0.032151) + (Zn%*$Zn/lbs*22.0462)) / ($Au/oz*0.032151)

Drill Program

Holes BK22-068 and -069 targeted high-grade, structurally controlled mineralization as well as broad

zones of disseminated gold-silver-zinc mineralization near the centre of the Buck Main epithermal-

related system (Figure 1). The holes were designed to investigate the extent and continuity of high-grade

gold-silver-zinc mineralization intersected in previous programs (e.g., BK20-012: 5.89 g/t AuEq over

17.0 metres including 23.10 g/t AuEq over 3.0 metres, and BK21-020: 31.75 g/t AuEq over 4.0 metres

including 247 g/t AuEq over 0.5 metres; see news releases dated

January 5

th

, 2021

, and

May 11

th

,

2021

). The holes tested a broad gap in drilling above and below BK20-012 (Figure 2). Based on

updated geological modelling, prior to this program, a westerly azimuth was chosen for these holes.

Figure 1. Map showing drill collar locations with selected highlights

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/6142/126079_d43d5a4954771913_001full.jpg

Figure 2. EW cross section showing selected highlights

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/6142/126079_d43d5a4954771913_002full.jpg

BK22-068, drilled towards the west (Figure 2), intersected multiple zones of strong gold-silver-zinc

mineralization starting at the collar and throughout the entire hole highlighted by 1.16 g/t AuEq over 13.6

metres and 1.02 g/t AuEq over 27.9 metres, including 7.09 g/t AuEq over 1.5 metres, and bottomed in

0.75 g/t AuEq over 7.3 metres (Table 1). BK22-069 was collared 45 metres west of BK22-068 and was

drilled at a similar azimuth and dip. The hole collared in mineralization and intersected numerous broad

zones of gold-silver-zinc mineralization highlighted by 3.11 g/t AuEq over 13.2 metres within broad zone

of 0.91 g/t AuEq over 69.8 metres. This broad interval included a high-grade intercept of 29.17 g/t AuEq

over 1.0 metre associated with vein-hosted quartz-carbonate-sulfide mineralization.

Mineralization in both holes is hosted in a sequence of andesites and sedimentary rocks cut by

northwest-trending quartz-feldspar porphyritic dykes. Higher-grade intervals (Table 1) are hosted in local

quartz + carbonate + sulfide veins associated with broad zones of quartz + sericite + pyrite alteration.

Holes BK22-068 and 069 were drilled at different azimuths compared to the previous grid-based drilling

completed in late 2021 (see news releases dated

January 5

th

, 2022

and

February 22

nd

, 2022

). The aim

was to investigate the potential of oblique and/or conjugate structures within the wider east-west trending

Buck structural corridor. Veins along these orientations would have been missed during the previous

grid-based program, which was drilled with northeast orientations. New insights into this structurally

complex zone are being incorporated into the model to inform the next round of drilling, both within and

peripheral to the Buck Main system.

Holes BK22-067, 073, 074 and 075 targeted bulk-tonnage style mineralization on the eastern side of

Buck Main where previous drilling intersected broad zones of near-surface, strong gold-silver-zinc

mineralization hosted in dacitic volcaniclastic rocks (e.g., BK21-017: 1.25 g/t AuEq over 241 metres

including 2.36 g/t AuEq over 45 metres, and BK21-032: 1.03 g/t AuEq over 187 metres including 4.38

g/t AuEq over 12.3 metres; see news release dated

February 22

nd

, 2022

). Hole BK22-067 was drilled to

the east and tested for mineralization continuity below previous drilling and intersected 0.98 g/t AuEq

over 67.6 metres including 2.68 g/t AuEq over 11.3 metres associated with disseminated and clotted

sphalerite and pyrite. Similarly, hole BK22-075 tested for mineralization continuity above previous drilling

and intersected 1.08 g/t AuEq over 63.5 metres including 2.22 g/t AuEq over 6.0 metres. Hole BK22-

073 was a step-out hole collared 130 metres southeast of BK20-010 and intersected numerous zones of

disseminated gold-silver-zinc mineralization (Table 1) in a previously untested area. Additional drilling to

the south and east is warranted.

Table 2. Drill Collar Locations

Hole

Easting

Northing

Elevation (m)

Azimuth

Dip

Length (m)

BK22-067

654545

6019702

921

98.86

-61.62

327

BK22-068

654547

6019705

920.2

269.33

-63.45

426

BK22-069

654505

6019715

922.7

269.88

-55.45

390

BK22-073

654735

6019454

912.8

357.31

-60.45

413

BK22-074

654654

6019607

902.7

8.69

-63.95

311

BK22-075

654586

6019688

915

78.5

-45.52

449

Coordinates are in UTM NAD83 Zone 9N

Quality Assurance and Quality Control

All sample assay results have been monitored through the Company's quality assurance / quality control

(QA / QC) program. Drill core was sawn in half at Sun Summit's core logging and processing facility in

Houston, B.C. Half of the core was sampled and shipped in sealed and secure bags to the ALS Global

preparation facilities in Kamloops, Langley or North Vancouver, B.C. Samples were prepared using

standard preparation procedures. Following sample preparation, the pulps were sent to the ALS Global

analytical laboratory in North Vancouver, B.C. for analysis. ALS Global is registered to ISO / IEC

17025:2017 accreditations for laboratory procedures.

Core samples were analyzed for 48 elements by ICP-MS on a 0.25 gram sample using a four acid

digestion (method ME-MS61L). Gold was analyzed by fire assay on a 30 gram sample with an AAS

finish (method Au-AA23). Samples with >10 parts per million (ppm) gold were re-analyzed by fire assay

using a gravimetric finish on a 30 gram sample.

Samples with >100 ppm silver were re-analyzed using a

four acid digestion and ICP-AES finish. Samples with >10,000 ppm zinc were re-analysed using a four

acid digestion and ICP-AES finish.

In addition to ALS Global laboratory QA / QC protocols, Sun Summit implements an internal QA / QC

program that includes the insertion of duplicates, standards and blanks into the sample stream.

AuEq incorporates metal prices of $1700/oz Au, $22/oz Ag and $1.60/lbs Zn using the equation: AuEq

(AgZn) (g/t) = ((Au(g/t)*$Au/oz*0.032151) + (Ag(g/t)*$Ag/oz*0.032151) + (Zn%*$Zn/lbs*22.0462)) /

($Au/oz*0.032151)

National Instrument 43-101 Disclosure

This news release has been approved by Sun Summit's CEO, Robert D. Willis, P. Eng., a "Qualified

Person" as defined in National Instrument 43-101,

Standards of Disclosure for Mineral Projects

of the

Canadian Securities Administrators. He has also verified the data disclosed, including sampling,

analytical and test data, underlying the technical information in this news release.

Community Engagement

Sun Summit is engaging with First Nations on whose territory the Buck Property is located and is

discussing their interests and identifying contract and work opportunities, as well as opportunities to

support community initiatives. The Company looks forward to continuing to work with local and regional

First Nations as the project continues.

Corporate Communications Contract Terminated

Sun Summit also advises that it and Jasper Gatrill and have mutually agreed to terminate his corporate

communications services contract announced April 14, 2022.

About Sun Summit

Sun Summit Minerals is an exploration company focused on expanding its epithermal gold, silver, and

zinc discovery at its flagship 100% controlled Buck Project located in north-central British Columbia near

the town of Houston in central B.C.

The Company is exploring multiple high priority targets through systematic exploration campaigns with

excellent developed infrastructure and year-round drilling access. The Buck Project has high-grade and

bulk-tonnage gold, silver, and zinc potential and is located in an established mining region that includes

many former operating mines and current exploration projects.

Sun Summit is committed to environmental and social responsibility with a focus on responsible

development to generate positive outcomes for all stakeholders.

Further details are available at

www.sunsummitminerals.com

.

Link to Figures

Figure 1:

https://sunsummitminerals.com/wp-content/uploads/2022/05/SunSummit_BuckMainPlanMap_Updated-

scaled.jpg

Figure 2:

https://sunsummitminerals.com/wp-

content/uploads/2022/05/SunSummit_BuckMainCrossSectionMap_Updated.jpg

For further information, contact:

Sharyn Alexander

President

[email protected]

Tel. 778-588-9606

Forward-Looking Information

Statements contained in this news release that are not historical facts may be forward-looking

statements, which involve risks, uncertainties and other factors that could cause actual results to differ

materially from those expressed or implied by such forward-looking statements. Factors that could cause

such differences, without limiting the generality of the following, include: risks inherent in exploration

activities; volatility and sensitivity to market prices; volatility and sensitivity to capital market fluctuations;

the impact of exploration competition; the ability to raise funds through private or public equity financings;

environmental and safety risks including increased regulatory burdens; unexpected geological or

hydrological conditions; changes in government regulations and policies, including trade laws and

policies; failure to obtain necessary permits and approvals from government authorities; weather and

other natural phenomena; and other exploration, development, operating, financial market and regulatory

risks. Except as required by applicable securities laws and regulation, Sun Summit disclaims any

intention or obligation to update or revise any forward-looking statement, whether as a result of new

information, future events or otherwise.

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada

accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/126079