Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SML.V ·

Tango Renews Oena Mining Licence FOR 9 Years, South Africa and Terminates Txapemba Agreement, Angola

Permits & Approvals

1

Tango Mining Limited

202 – 5626 Larch Street

Vancouver, British Columbia

V6M 4E1, Canada

TSX Venture: TGV 

www.tangomining.com 

TANGO RENEWS OENA MINING LICENCE FOR 9 YEARS, SOUTH AFRICA  

AND TERMINATES TXAPEMBA AGREEMENT, ANGOLA 

VANCOUVER, BRITISH  COLUMBIA  —   16  April  2018  –  Tango  Mining  Limited  (“Tango”  or  the  “Company”)  is  pleased  to 

announce  that  its  subsidiary,  African  Star  Minerals  (Pty)  Limited,  has  received  confirmation  from  the  Department  of 

Mineral Resources, Republic of South Africa, that the mining right for the Oena Diamond Mine, (“Oena” or the “Property”) 

has been renewed for a further period of nine (9) years. The renewal has been granted in terms of the applicable sections 

of the Mineral and Petroleum Resources Development Act (Act 28, 2002). Oena is 8,800 hectares in size and covers a 4.8 

kilometre (“km”) wide strip along a 15 km length of the lower Orange River, Northern Cape Province in a well‐established 

alluvial diamond‐mining province known to produce high quality and large sized diamonds.  

Tango  also  announces  that  it  has  terminated  the  Services  Agreement  for  Mining  and  Marketing  of  Diamonds  with 

Txapemba  Canguba  R.L  (“Txapemba”),  a  Cooperativa  Exploração  Semi‐Industrial  de  Diamantes,  Republic  of  Angola.  The 

termination  was  mutually  agreed  by  both  Tango and  Txapemba.  The  termination  is  due  to  the  limitation  and  failure  to 

increase the maximum hourly production capacity of the license terms and conditions which make it unviable as a long 

term commercial project for Tango.  

About Tango Mining Limited 

Tango,  via  its  South  African  subsidiaries,  holds  three  thermal  coal,  metallurgical,  processing  plant  and  engineering 

contracts that process 6.5 Mt of coal per annum, with client Exxaro. The three projects are located within the Ogies and 

Highveld  coalfields,  Mpumalanga  Province  and  Kliprivier  coalfield,  KwaZulu‐Natal  Province,  South  Africa.  The  Company 

also  holds  an  interest  in  the  Oena  Diamond  Mine,  a  producing  alluvial  diamond  property  located  in  the  Northern  Cape 

Province, South Africa. Tango also recently signed an agreement on an alluvial diamond property in Botswana called the 

Middlepits Project. 

Mr. Samer Khalaf 

CEO 

Tango Mining Limited 

[email protected]  

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture 

Exchange) accepts responsibility for the adequacy or accuracy of this release.  

Forward‐Looking Statement 

Certain  information  set  forth  in  this  news  release  contains  “forward‐looking  statements”  and  “forward‐looking 

information”  under  applicable  securities  laws.  Except  for  statements  of  historical  fact,  certain  information  contained 

herein constitutes forward‐looking statements, which include management’s assessment of future plans and operations 

and are based on current internal expectations, estimates, projections, assumptions and beliefs, which may prove to be 

incorrect. Some of the forward‐looking statements may be identified by words such as “forecasts”, estimates”, “expects” 

“anticipates”,  “believes”,  “projects”,  “plans”,  “outlook”,  “capacity”  and  similar  expressions.  These  statements  are  not 

guarantees of future performance and undue reliance should not be placed on them. 

Such  forward‐looking  statements  necessarily  involve  known  and  unknown  risks  and  uncertainties,  which  may  cause  the 

Company’s actual performance and financial results in future periods to differ materially from any projections of future 

performance or results expressed or implied by such forward‐looking statements. These risks and uncertainties include, 

but are not limited to statements with respect to the estimation of mineral resources; the realization of mineral resource 

estimates;  anticipated  future  production,  capital  and  operating  costs;  cash  flows  and  mine  life;  potential  size  of  a 

mineralized  zone;  potential  expansion  of  mineralization;  potential  types  of  mining  operations;  permitting  timelines; 

government  regulation  of  exploration  and  mining  operations;  risks  that  the  presence  of  diamond  deposits  mentioned 

nearby the Company’s property are not indicative of the diamond mineralization on the Company’s property, the supply 

and demand for, deliveries of and the level and volatility of prices of rough diamonds, risks that the actual revenues will be 

less  than  projected;  risks  that  the  target  production  for  the  existing  mining  contracts  will  be  less  than  projected  or 

  2

expected; risks that production will not commence as projected due to delay or inability to receive governmental approval 

of the Company’s acquisition or the timely completion of an NI43‐101 report; technical problems; inability of management 

to  secure  sales  or  third  party  purchase  contracts;  currency  and  interest  rate  fluctuations;  foreign  exchange  fluctuations 

and  foreign  operations;  various  events  which  could  disrupt  operations,  including  labor  stoppages  and  severe  weather 

conditions; and management’s ability to anticipate and manage the foregoing factors and risks. 

The  forward‐looking  statements  and  information  contained  in  this  news  release  are  based  on  certain  assumptions 

regarding, among other things, future prices for coal and diamonds; future currency and exchange rates; the Company’s 

ability  to  generate  sufficient  cash  flow  from  operations  and  access  capital  markets  to  meet  its  future  obligations;  coal 

consumption levels; and the Company’s ability to retain qualified staff and equipment in a cost‐efficient manner to meet 

its demand. There can be no assurance that forward‐looking statements will prove to be accurate, as actual results and 

future  events  could  differ  materially  from  those  anticipated  in  such  statements.  The  reader  is  cautioned  not  to  place 

undue reliance on forward‐looking statements. The Company  does not undertake to update any of the forward‐looking 

statements contained in this news release unless required by law. The statements as to the Company’s capacity to achieve 

revenue are no assurance that it will achieve these levels of revenue.