Tango Q3 Operational Update

Production Results Mine Development & Operations

1 

Tango Mining Limited 

202 – 5626 Larch Street 

Vancouver, British Columbia 

V6M 4E1, Canada 

TSX Venture: TGV 

www.tangomining.com 

TANGO Q3 OPERATIONAL UPDATE   

VANCOUVER, BRITISH COLUMBIA —  17 June 2019 – Tango Mining Limited (“Tango” or the “Company”) (TSX.V 

– TGV) is pleased to provide an update for the period of 1 March to 31 May 2019 (3rd Quarter) on its project 

portfolio located in South Africa, Angola and Liberia.  

COAL – Metallurgical and Mining Projects, Republic of South Africa 

Production 

Three months run of mine (ROM) and discard throughput for the three Exxaro Coal Central Proprietary 

Limited (ECC) operations were below budget: 

  Actual 

(tonnes) 

Budget 

(tonnes) 

Variance 

(tonnes) 

Comments 

Dorstfontein East Coal Mine 

(DECM) 

625 025  611 027  13 998  

Dorstfontein West Coal Mine 

(DWCM) 

240 286  261 950  (21 664)  4 seam expansion project 

Forzando Coal Mine  

(FZN) 

967 595  1 003 471  (35 876)  Coal supply from 

underground 

  Employees: Number of full time employees: 231 

Number of part time employees: 23 

Health and Safety: 

No reportable incidents recorded for Kwena for the three ECC operations for the 3rd Quarter. 

Safety Awards: 

Exxaro – 1 year fatality free. 

DCME – 8000 fatality free shifts. 

Diamond Production 

Oena, Republic of South Africa  

Mining and Processing Contractor – Bluedust 7  

Bluedust  7  continue  mining  in  the  Blokwerf  and  Sandberg  mining  areas  at  Oena  with  an  increase  of 

19,490 tons mined above the previous quarter. All five pan plants ran well with no major breakdowns. 

A total of 190 diamonds totalling 333.25 carats were placed on tender at Kimberley or sold to the state 

2 

trader. The average price of sold carats was US$ 1,198 per carat. This includes a 20.9 carat diamond which 

sold at an average of US$3,807 per carat, as well as a 5.28 carat stone that sold at an average of $7,730 

per carat.  

Blue Dust 7  Tonnes  Carats 

Produced 

Number 

of Stones

produced

Carats sold Number of 

Stones 

sold 

Grade 

Cts / 100t 

ROM Mined  95,060  318.95  183  333.25  190  0.34 

  Number of Employees: 42 

Health and Safety: 

  No accidents or incidents were recorded 

African Star Minerals (ASM) 

ASM  has  entered  into  a  Joint  Operating  Agreement  with  Oryx  Mining  (Pty)  Ltd  (Oryx)  and  Hall  of 

Diamonds  CC  (HoD)  whereby  Oryx  will  contribute  earth  moving  and  mining  equipment  to  support  the 

operation of ASMs two pan plants. ASM shall pay a total of 55% of net proceeds of diamond sales to Oryx 

and HoD after deduction of operating costs.  

The joint venture (ASM and Oryx/HoD) production commenced on the 17 May 2019.  

A total of 3 stones totalling 34.45 carats were placed on tender at Kimberley or sold to the state trader. 

The average price of sold carats was US$2,973 per carat. This includes a 29.31 carat diamond which sold 

at US$3,224 per carat.  

ASM Oryx Partnership  Tonnes   Carats Produced  Number of 

Stones 

Grade  

Cts / 100t  

ROM Mined  19,920 34.48 3  0.17

Number of Employees: 24 

  Health and Safety: 

No accidents or incidents were recorded 

Total Combined Production for Blue Dust 7 and the ASM ‐ Oryx/HoD JV  

Total Combined Production  Tonnes Carats Produced Number of 

Stones 

Grade 

Cts / 100t  

ROM Mined  114,980  353.43  186  0.31 

MOQUITA PROJECT, Republic of Angola 

The site has a total of 40 full time employees, an operating pan plant and scrubber with a grease table for 

treatment. Prefab housing, diesel tank and a water treatment system have been installed. Trial mining is 

ongoing. No diamond sales were recorded during the 3rd Quarter.  

3 

DIAMOND EXPLORATION 

MANO RIVER PROJECT, Republic of Liberia 

The transfer of 100% of the mineral exploration license (MEL) to Tango Mining (Liberia) was successfully 

concluded. Tango is devising an exploration plan to be launched in the 1st Quarter of 2020.   

Mr. Samer Khalaf  

Chief Executive Officer 

Tango Mining Limited 

[email protected] 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the 

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

Forward‐Looking Statement 

Certain information set forth in this news release contains “forward‐looking statements” and “forward‐looking 

information”  under  applicable  securities  laws.  Except  for  statements  of  historical  fact,  certain  information 

contained herein constitutes forward‐looking statements, which include management’s assessment of future 

plans and operations and are based on current internal expectations, estimates, projections, assumptions and 

beliefs, which may prove to be incorrect. Some of the forward‐looking statements may be identified by words 

such as “forecasts”, estimates”, “expects” “anticipates”, “believes”, “projects”, “plans”, “outlook”, “capacity” 

and  similar  expressions.  These  statements  are  not  guarantees  of  future  performance  and  undue  reliance 

should not be placed on them. 

Such forward‐looking statements necessarily involve known and unknown risks and uncertainties, which may 

cause the Company’s actual performance and financial results in future periods to differ materially from any 

projections of future performance or results expressed or implied by such forward‐looking statements. These 

risks  and  uncertainties  include,  but  are  not  limited  to  statements  with  respect  to  the  estimation  of  mineral 

resources; the realization of mineral resource estimates; anticipated future production, capital and operating 

costs;  cash  flows  and  mine  life;  potential  size  of  a  mineralized  zone;  potential  expansion  of  mineralization; 

potential types of mining operations; permitting timelines; government regulation of exploration and mining 

operations;  risks  that  the  presence  of  diamond  deposits  mentioned  nearby  the  Company’s  property  are  not 

indicative of the diamond mineralization on the Company’s property, the supply and demand for, deliveries of 

and  the  level  and  volatility  of  prices  of  rough  diamonds,  risks  that  the  actual  revenues  will  be  less  than 

projected;  risks  that  the  target  production  for  the  existing  mining  contracts  will  be  less  than  projected  or 

expected;  risks  that  production  will  not  commence  as  projected  due  to  delay  or  inability  to  receive 

governmental approval of the Company’s acquisition or the timely completion of an NI43‐101 report; technical 

problems;  inability  of  management  to  secure  sales  or  third  party  purchase  contracts;  currency  and  interest 

rate  fluctuations;  foreign  exchange  fluctuations  and  foreign  operations;  various  events  which  could  disrupt 

operations, including labor stoppages and severe weather conditions; and management’s ability to anticipate 

and manage the foregoing factors and risks. 

The  forward‐looking  statements  and  information  contained  in  this  news  release  are  based  on  certain 

assumptions  regarding,  among  other  things,  future  prices  for  coal  and  diamonds;  future  currency  and 

exchange  rates;  the  Company’s  ability  to  generate  sufficient  cash  flow  from  operations  and  access  capital 

markets to meet its future obligations; coal consumption levels; and the Company’s ability to retain qualified 

staff and equipment in a cost‐efficient manner to meet its demand. There can be no assurance that forward‐

looking statements will prove to be accurate, as actual results and future events could differ materially from 

those anticipated in such statements. The reader is cautioned not to place undue reliance on forward‐looking 

statements. The Company does not undertake to update any of the forward‐looking statements contained in 

this news release unless required by law. The statements as to the Company’s capacity to achieve revenue are 

no assurance that it will achieve these levels of revenue.