Tango Enters Diamond Mining Sector IN Angola
1
Tango Mining Limited
202 – 5626 Larch Street
Vancouver, British Columbia
V6M 4E1, Canada
TSX Venture: TGV
www.tangomining.com
TANGO ENTERS DIAMOND MINING SECTOR IN ANGOLA
VANCOUVER, BRITISH COLUMBIA — 11 September 2017 – Tango Mining Limited (“Tango” or the “Company”)
(TSXV:TGV) is pleased to announce that it has signed a three year renewable Services Agreement for Mining and
Marketing of Diamonds with Txapemba Canguba R.L (“Txapemba”) which is a Cooperativa Exploração Semi-Industrial de
Diamantes located in the Municipality of Cambulo, Province of Lunda Norte, Republic of Angola. Txapemba was granted
an 84 square kilometer (“km”) concession for the semi-industrial exploitation of diamonds within the Luembe River basin
in an area that was a past alluvial diamond producer and well known for both alluvial and kimberlite diamonds (the
“Property”).
Tango will be responsible for capital expenditures associated with alluvial mine design and equipment acquisition and will
be the sole operator. As remuneration, Tango will receive 60% of the proceeds from the sale of produced stones. All of
Tango’s operational costs are deductible.
The Property is located immediately near the community of N ’zagi (Andrada) and 95 k m south east of Dundo, the
provincial capital of Lunda Norte, which has a recently reopened airport with direct service to Luanda. Angola, which ranks
as the world’s fifth biggest producer of diamonds by value has been actively encouraging foreign investment in its
diamond sector under a new Mining Code introduced in 2011, which no longer includes the requirement for Angola to
hold a majority interest in diamond mining projects.
Angola’s potential for world class diamond discoveries is recognised by global diamond mining leaders Alrosa and De
Beers. Alrosa is the operator of the world’s fourth biggest diamond mine Catoca, which is located 220 km southwest of the
Property and within the same geological setting (Lucapa Graben). Angola is an official signatory of the Kimberley Process
Certification Scheme and occupied the position of Chair of the Kimberley Process in 2015.
Development Plan
Tango will, over the coming months, complete a full geological assessment of the Property and plans to commence alluvial
diamond production as soon as practical.
Txapemba Property
The Property is located within the Luembe Ri ver drainage in north east Angola and constitutes the bulk of the alluvial
diamonds extracted until now in Angola and represent a large fraction of the still existing diamond resources. The
Chiumbe, Luembe, Luachimo and Chicapa rivers’ basins deposits are the most important, only surpassed by Cuango
River’s. Secondary (or alluvial ) diamond deposits were formed in several cycles, starting immediately after kimberlite
emplacement (in Cretaceous times, generally speaking). The first secondary deposits correspond to the basal
conglomerates of what is known as the Ca londa Formation. The erosion of these conglomerates released diamonds that
would be concentrated in more recent deposits.
The Property is located within a few km from the Chimbongo and Chitololo alluvial diamonds mines.
The area has a high potential for a primary source, as the Malúdi diamond population has different properties than those
of the general diamond population in the area.
Mr. Samer Khalaf
CEO
Tango Mining Limited
The technical disclosure in this news release has been approved by Terry L. Tucker, P.Geo., Executive Chairman of the
Company and a Qualified Person as defined by National Instrument 43-101 of the Canadian Securities Administrators.
2
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statement
Certain information set forth in this news release contains “forward -looking statements” and “forward- looking
information” under applicable securities laws. Except for statements of historical fact, certain information contained herein
constitutes forward-looking statements, which include management’s assessment of future plans and operations and are
based on current internal expectations, estimates, projections, assumptions and beliefs, which may prove to be incorrect.
Some of the forward -looking statements may be identified by words such as “forecasts”, estimates”, “expects”
“anticipates”, “believes”, “projects”, “plans”, “outlook”, “capacity” and similar expressions. These statements are not
guarantees of future performance and undue reliance should not be placed on them.
Such forward- looking statements necessarily involve known and unknown risks and uncertainties, which may cause the
Company’s actual performance and financial results in future periods to differ materially from any projections of future
performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, but
are not limited to statements with respect to the estimation of mineral resources; the realization of mineral resource
estimates; anticipated future production, capital and operating costs; cash flows and mine life; potential size of a
mineralized zone; potential expansion of mineralization; potential types of mining operations; permitting timelines;
government regulation of exploration and mining operations; risks that the presence of diamond deposits mentioned
nearby the Company’s property are not indicative of the diamond mineralization on the Company’s property, the supply
and demand for, deliveries of and the level and volatility of prices of rough diam onds, risks that the actual revenues will be
less than projected; risks that the target production for the existing mining contracts will be less than projected or
expected; risks that production will not commence as projected due to delay or inability to receive governmental approval
of the Company’s acquisition or the timely completion of an NI43- 101 report; technical problems; inability of management
to secure sales or third party purchase contracts; currency and interest rate fluctuations; foreign exchange fluctuations and
foreign operations; mineral title; various events which could disrupt operations, including labor stoppages and severe
weather conditions; and management’s ability to anticipate and manage the foregoing factors and risks.
The forward -looking statements and information contained in this news release are based on certain assumptions
regarding, among other things, future prices for coal and diamonds; future currency and exchange rates; the Company’s
ability to generate sufficient cash flo w from operations and access capital markets to meet its future obligations; coal
consumption levels; and the Company’s ability to retain qualified staff and equipment in a cost-efficient manner to meet its
demand. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such statements. The reader is cautioned not to place undue
reliance on forward- looking statements. The Company does not under take to update any of the forward- looking
statements contained in this news release unless required by law. The statements as to the Company’s capacity to achieve
revenue are no assurance that it will achieve these levels of revenue.
3
TXAPEMBA PROPERTY LOCATION
4
LUEMBE RIVER BASIN
1. Projecto Chimbongo alluvial diamond mine
2. Projecto Chitololo alluvial diamond mine
3. Txapemba Property is located at 2