Solaris Expands Warintza West to 1.2km by 0.7km, Identifies New Potential
Suite 555 - 999 Canada Pl., Vancouver, BC Canada V6C 3E1
Solaris Expands Warintza West to 1.2km by 0.7km,
Identifies New Potential
February 13, 2023 – Vancouver, B.C. – Solaris Resources Inc. (TSX: SLS; OTCQB: SLSSF) (“Solaris” or “the
Company”) is pleased to report updated geochemical sampling and assay results from follow-up holes at
Warintza West within its Warintza Project (“Warintza” or “the Project”) in southeastern Ecuador.
Highlights are listed below, with a corresponding image in Figure 1 and detailed results in Tables 1-2.
Highlights
Warintza West, discovered February 2021, is one of four discoveries made to date within the Warintza
porphyry cluster and is located 1km west of and outside the Warintza Mineral Resource Estimate
(“MRE”)¹. The initial reconnaissance holes from a centralized platform have outlined a broad zone of
porphyry mineralization measuring 1200m x 700m that remains open. Subsequent geochemical sampling
has provided vectors toward potential higher-grade mineralization to the north for step-out drilling.
Recent geochemical sampling has identified a new area of strong overlapping copper and
molybdenum anomalies to the north measuring approximately 1000m x 500m with soil samples
averaging 600 ppm Cu and 80 ppm Mo – this contrasts with the anomaly surrounding the original
platform that is defined by strong Mo values at 65 ppm but weaker Cu below 400 ppm
This new area of strong soil anomalism represents a potential target for higher-grade
mineralization beyond the northern margin of prior exploration drilling (refer to press releases
dated Oct 13, 2022 and Feb 16, 2021), including:
- SLSW-07 (drilled north) returned 686m of 0.46% CuEq²
- SLSW-04 (drilled northeast) returned 264m of 0.44% CuEq²
- SLSW-01 (drilled northwest) returned 260m of 0.42% CuEq³
New drill results returned to the south, include SLSW-13, which was drilled southwest and
returned 320m of 0.50% CuEq² from near surface within a broader interval of 496m of 0.40%
CuEq², extending mineralization to the south where it remains open, and requires step-out
drilling
This hole expands on previously reported SLSE-10, which was drilled from the same platform to
the southwest and returned 220m of 0.41% CuEq² from near surface (refer to press release dated
Oct 13, 2022)
Mr. Jorge Fierro, Vice President, Exploration, commented: “First pass reconnaissance drilling at Warintza
West outlined a broad zone of porphyry mineralization, with subsequent sampling identifying new
potential for higher-grade mineralization to the north for future step-out drilling. The ongoing drill
program is targeting MRE growth within the high-grade starter pit at Warintza Central, where results are
expected shortly, and expanding the Warintza East discovery which adjoins Warintza Central.”
Suite 555 - 999 Canada Pl., Vancouver, BC Canada V6C 3E1
Figure 1 – Plan View of Warintza West Drilling Released to Date
Table 1 – Assay Results
Notes to table: True widths of the mineralized zone are not known at this time.
Hole ID Date Reported From (m) To (m) Interval (m) Cu (%) Mo (%) Au (g/t) CuEq² (%)
SLSW-13
Feb 13, 2023
24 520 496 0.32 0.02 0.03 0.40
Including 24 344 320 0.40 0.02 0.03 0.50
SLSW-12 58 592 534 0.15 0.01 0.01 0.20
Including 58 246 188 0.24 0.01 0.02 0.30
SLSW-11 20 648 628 0.17 0.005 0.02 0.20
Including 30 288 258 0.22 0.005 0.03 0.26
Suite 555 - 999 Canada Pl., Vancouver, BC Canada V6C 3E1
Table 2 - Collar Location
Hole ID Easting Northing Elevation (m) Depth (m) Azimuth (degrees) Dip (degrees)
SLSW-13 798507 9648465 1519 530 190 -60
SLSW-12 798507 9648465 1519 1005 90 -50
SLSW-11 798507 9648465 1519 708 280 -46
Notes to table: The coordinates are in WGS84 17S Datum.
Endnotes
1. Refer to technical report titled, “NI 43-101 Technical Report for the Warintza Project, Ecuador” with
an effective date of April 1, 2022, prepared by Mario E. Rossi and filed on the Company’s SEDAR profile
at www.sedar.com.
2. Copper-equivalence for the MRE and drill holes SLSW 2-13 calculated as: CuEq (%) = Cu (%) + 4.0476
× Mo (%) + 0.487 × Au (g/t), utilizing metal prices of US$3.50/lb Cu, US$15.00/lb Mo, and US$1,500/oz
Au, and assumes recoveries of 90% Cu, 85% Mo, and 70% Au based on preliminary metallurgical test
work.
3. Copper-equivalence calculated as: CuEq (%) = Cu (%) + 3.33 × Mo (%) + 0.73 × Au (g/t), utilizing metal
prices of US$3.00/lb Cu, US$10.00/lb Mo, and US$1,500/oz Au. No adjustments were made for
recovery prior to the updated MRE, as the metallurgical data to allow for estimation of recoveries was
not yet available. Solaris defined CuEq for reporting purposes only.
Technical Information and Quality Control & Quality Assurance
Sample assay, steam sediment, soil and rock sample assay results have been independently monitored
through a quality control/quality assurance (“QA/QC”) program that includes the insertion of blind
certified reference materials (standards), blanks and field duplicate samples. Logging and sampling are
completed at a secured Company facility located in Quito, Ecuador. Drill core is cut in half on site and
samples are securely transported to ALS Labs in Quito. Sample pulps are sent to ALS Labs in Lima, Peru
and Vancouver, Canada for analysis. Total copper and molybdenum contents are determined by four-acid
digestion with AAS finish. Gold is determined by fire assay of a 30-gram charge. In addition, selected pulp
check samples are sent to Bureau Veritas lab in Lima, Peru. Both ALS Labs and Bureau Veritas lab are
independent of Solaris. Solaris is not aware of any drilling, sampling, recovery or other factors that could
materially affect the accuracy or reliability of the data referred to herein. ZTEM data quality was validated
by a qualified external professional using data validation procedures under high industry standards, and
the Company therefore did not deem it necessary to have such ZTEM data verified by a Qualified Person.
The technical data has been verified by Jorge Fierro, M.Sc., DIC, PG, using data validation and quality
assurance procedures under high industry standards.
Qualified Person
The scientific and technical content of this press release has been reviewed and approved by Jorge Fierro,
M.Sc., DIC, PG, Vice President Exploration of Solaris who is a “Qualified Person” as defined in National
Suite 555 - 999 Canada Pl., Vancouver, BC Canada V6C 3E1
Instrument 43-101 Standards of Disclosure for Mineral Projects. Jorge Fierro is a Registered Professional
Geologist through the SME (registered member #4279075).
On behalf of the Board of Solaris Resources Inc.
“Daniel Earle”
President & CEO, Director
For Further Information
Jacqueline Wagenaar, VP Investor Relations
Direct: 416-366-5678 Ext. 203
Email: [email protected]
About Solaris Resources Inc.
Solaris is a multi-asset exploration company, advancing a portfolio of copper and gold assets in the
Americas, which includes: its primary focus, a world class large-scale resource with expansion and
discovery potential at the Warintza Project (“Warintza”) in Ecuador; discovery potential at its Ricardo
Project and Tamarugo Project in Chile; discovery potential at its Capricho and Paco Orco projects in Peru;
and significant leverage to increasing copper prices through its 60% interest in the La Verde joint-venture
project with a subsidiary of Teck Resources in Mexico.
Cautionary Notes and Forward-looking Statements
This document contains certain forward-looking information and forward-looking statements within the meaning of
applicable securities legislation (collectively “forward-looking statements”). The use of the words “will” and
“expected” and similar expressions are intended to identify forward-looking statements. These statements include
statements that the initial reconnaissance holes from a centralized platform have outlined a broad zone of porphyry
mineralization measuring 1200m x 700m that remains open with subsequent geochemical sampling providing
vectors toward potential higher-grade mineralization to the north for step-out drilling, recent geochemical sampling
has identified a new area of strong overlapping copper and molybdenum anomalies to the north measuring
approximately 1000m x 500m with soil samples averaging 600 ppm Cu and 80 ppm Mo, this new area of strong soil
anomalism represents a potential target for higher-grade mineralization beyond the northern margin of prior
exploration drilling, and the ongoing drill program is targeting MRE growth within the high-grade starter pit at
Warintza Central, where results are expected shortly, and expanding the Warintza East discovery which adjoins
Warintza Central. Although Solaris believes that the expectations reflected in such forward-looking statements
and/or information are reasonable, readers are cautioned that actual results may vary from the forward-looking
statements. These statements are based on a variety of assumptions including assumptions made about the
Company’s ability to advance exploration efforts at the Warintza Project; the results of such exploration efforts; and
the Company’s ability to achieve its growth objectives. These statements also involve known and unknown risks,
uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in
such forward-looking statements, including the risks, uncertainties and other factors identified in the Solaris
Management’s Discussion and Analysis for the year ended December 31, 2021, available at www.sedar.com.
Furthermore, the forward-looking statements contained in this news release are made as at the date of this news
release and Solaris does not undertake any obligation to publicly update or revise any of these forward-looking
statements except as may be required by applicable securities laws.