Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SLS.TO ·

Solaris and CELEC Announce MOU to Supply Low‐Cost, Emission‐Free Hydroelectric Power to Warintza

Partnerships & JV

Suite 555 - 999 Canada Pl., Vancouver, BC Canada V6C 3E1

Solaris and CELEC Announce MOU to Supply Low‐Cost, Emission‐Free Hydroelectric Power to Warintza  

March 21, 2022 – Vancouver, B.C. – Solaris Resources Inc. (TSX: SLS; OTCQB: SLSSF) and its subsidiary 

Lowell Mineral Exploration Ecuador S.A. ("Solaris" or “the Company") are pleased to announce the signing 

of a Memorandum of Understanding (“MOU”) with Electric Corporation of Ecuador (“CELEC EP”) to supply 

low‐cost,  locally  sourced  hydroelectric  power  to  the  Warintza  Project  (“Warintza”  or  “the  Project”)  in 

southeastern Ecuador.  

CELEC  EP  will  provide  locally  sourced  hydroelectric  power  from  the  National  Transmission  System  in 

Ecuador with the goal of providing the primary power required for the Warintza Project. This initiative 

dovetails with the “Ecuador Zero Carbon Program” developed by the Ministry of Environment, Water and 

Ecological Transition and the National Decarbonization Pact of which Solaris was the first mining signatory 

in September 2021. 

Solaris intends to maximize the potential for efficiencies derived from this abundant, renewable, low‐cost 

energy source by studying the potential for electrification of infrastructure, mobile mining equipment, 

including  drills,  trucks  and  shovels,  materials  movement  and  conveyance,  including  gravity‐assisted 

solutions, and processing and pumping systems.  

Mr. Daniel Earle, President & CEO, commented, “The MOU with CELEC supports our vision to study the 

potential for electrified operations that maximize the structural benefits of the Warintza Project within 

an  infrastructure‐rich  mining  district  with  the  aim  of  lowering  costs,  increasing  efficiencies,  reducing 

emissions, and broadly positioning the Project as a leading development opportunity across a range of 

financial and ESG metrics in the industry.” 

Mr. Gonzalo Uquillas Vallejo, General Manager of CELEC, stated, “As a leading strategic public company 

in the generation and transmission of electric power, we work in compliance with national guidelines to 

move toward the electrification of all areas of national industry, including large‐scale mining, which will 

be a mainstay for the development of the Ecuadorian economy in the coming decades." 

On behalf of the Board of Solaris Resources Inc. 

“Daniel Earle” 

President & CEO, Director 

For Further Information 

Jacqueline Wagenaar, VP Investor Relations 

Direct: 416‐366‐5678 Ext. 203 

Email: [email protected] 

About Solaris Resources Inc. 

Solaris is advancing a portfolio of copper and gold assets in the Americas, which includes: a high‐grade 

resource with expansion and additional discovery potential at the Warintza copper and gold project in 

Ecuador; discovery potential on the grass‐roots Tamarugo project in Chile and Capricho and Paco Orco 

Suite 555 - 999 Canada Pl., Vancouver, BC Canada V6C 3E1

projects in Peru; exposure to US$130M spending / 5‐yrs through a farm‐out agreement with Freeport‐

McMoRan on the Ricardo Project in Chile; and significant leverage to increasing copper prices through its 

60%‐interest in the La Verde joint‐venture project with Teck Resources in Mexico.  

Cautionary Notes and Forward‐looking Statements 

This document contains certain forward‐looking information and forward‐looking statements within the meaning of 

applicable  securities  legislation  (collectively  “forward‐looking  statements”).  The  use  of  the  words  “will”  and 

“expected” and similar expressions are intended to identify forward‐looking statements. These statements include 

statements that CELEC EP will provide locally sourced hydroelectric power from the National Transmission System in 

Ecuador  with  the  goal  of  providing  the  primary  power  required  for  the  Warintza  Project,  that  Solaris  intends  to 

maximize the potential for efficiencies derived from this abundant, renewable, low‐cost energy source by studying 

the  potential  for  electrification  of  infrastructure,  mobile  mining  equipment,  including  drills,  trucks  and  shovels, 

materials  movement  and  conveyance,  including  gravity‐assisted  solutions,  and  processing  and  pumping  systems, 

with the aim of lowering costs, increasing efficiencies, reducing emissions, and broadly positioning the Project as a 

leading  development  opportunity  across  a  range  of  financial  and  ESG  metrics  in  the  industry.  Although  Solaris 

believes  that  the  expectations  reflected  in  such  forward‐looking  statements  and/or  information  are  reasonable, 

readers are cautioned that actual results may vary from the forward‐looking statements. These statements are based 

on a variety of assumptions including assumptions made about the Company’s ability to advance exploration efforts 

at the Warintza Project; the results of such exploration efforts; the Company’s ability to achieve its growth objectives; 

that Solaris and CELEC will enter into a binding agreement reflecting the terms set out in this news release; and that 

CELEC  EP  will  fulfil  its  obligations  set  out  therein.  These  statements  also  involve  known  and  unknown  risks, 

uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in 

such  forward‐looking  statements,  including  the  risks,  uncertainties  and  other  factors  identified  in  the  Solaris 

Management’s  Discussion  and  Analysis  for  the  year  ended  December  31,  2020  available  at  www.sedar.com. 

Furthermore, the forward‐looking statements contained in this news release are made as at the date of this news 

release  and  Solaris  does  not  undertake  any  obligation  to  publicly  update  or  revise  any  of  these  forward‐looking 

statements except as may be required by applicable securities laws.