Standard Lithium Files Definitive Feasibility Study for its First Commercial Lithium Extraction Plant – Phase 1A
Standard Lithium Files Definitive Feasibility Study for its First Commercial
Lithium Extraction Plant – Phase 1A
EL DORADO, Ark., Oct. 18, 2023 -- Standard Lithium Ltd. (“Standard Lithium” or the “Company”) (TSXV:SLI) (NYSE
American:SLI) (FRA:S5L), a leading near-commercial lithium company, today announced that the Definitive Feasibility Study
(the “Report”) for its first commercial lithium project (“Phase 1A”) proposed to be located at the LANXESS South Plant has
been filed.
With expected first production in 2026, Phase 1A is anticipated to be the first US-based lithium production project built in six
decades, and the first commercial direct lithium extraction facility in North America with potential to double current United
States lithium production from current levels.
Phase 1A will process lithium-rich brine currently flowing through existing infrastructure and represents production of only five
percent of the total Measured and Indicated Resource of 2.8 Mt lithium carbonate equivalent (“LCE”)¹. The Definitive Feasibility
Study demonstrates strong economics, assuming initial annual production of 5,700 tonnes, and an average annual production
of 5,400 tonnes of battery-quality lithium carbonate over a 25-year operating life based on Proven and Probable Reserves of
208 Kt LCE at an average concentration of 217 mg/L. Phase 1A represents a modest 60-times scale up from the operational
Demonstration Plant, which over a three-and-a-half-year period of effective and efficient lithium extraction, has used the same
brine that will feed the proposed commercial plant. The Company expects to make a final investment decision for Phase 1A in
the first half of 2024.
Standard Lithium intends to scale and replicate the development model for the Phase 1A project across its portfolio of projects
in the Smackover Formation, including the South West Arkansas Project and highly prospective East Texas landholdings. The
lithium concentrations of the Company’s projects tend to improve from east to west across the Smackover Formation. Most
recently, East Texas drilling results delivered the new, highest grade lithium brine concentrations in North America that the
Company is aware of, at 663 mg/L. Higher lithium concentrations paired with economies of scale through the advancement of
multiple projects is expected to afford the Company a competitive advantage as it expands its footprint through the Smackover
Formation.
Standard Lithium's filing of the Definitive Feasibility Study highlights its commitment to commercialize direct lithium extraction
technology, starting with Phase 1A. This approach aims to unlock the resource potential of the Smackover Formation and
address critical mineral needs in the U.S. sustainably and responsibly.
The Report is available for review under the Company’s profile on SEDAR+ at www.sedar.com and on the Company’s website
at www.standardlithium.com/projects/arkansas-smackover. For highlights of this Report, please refer to the Company’s press
release dated 6 September 2023.
About Standard Lithium Ltd.
Standard Lithium is a leading near-commercial lithium development company focused on the sustainable development of a
portfolio of lithium-brine bearing properties in the United States. The Company prioritizes brine projects characterized by high-
grade resources, robust infrastructure, skilled labor, and streamlined permitting. The Company aims to achieve sustainable,
commercial-scale lithium production via the application of a scalable and fully-integrated Direct Lithium Extraction (“DLE”) and
purification process. The Company’s signature projects, the Phase 1A Project and the South West Arkansas Project, are
located on the Smackover Formation in southern Arkansas near the Louisiana state line, a region with a long-standing and
established brine processing industry. The Company has also identified a number of highly prospective lithium brine project
areas in the Smackover Formation in East Texas and began an extensive brine leasing program in the key project areas. In
addition, the Company has an interest in certain mineral leases located in the Mojave Desert in San Bernardino County,
California.
Standard Lithium trades on both the TSX Venture Exchange and the NYSE American under the symbol “SLI”; and on the
Frankfurt Stock Exchange under the symbol “S5L”. Please visit the Company’s website at www.standardlithium.com.
Qualified Person
Steve Ross, P.Geol., a qualified person as defined by National Instrument 43-101, and Vice President Resource Development
for the Company, has reviewed and approved the relevant scientific and technical information in this news release.
Investor and Media Inquiries
Allysa Howell
Vice President, Corporate Communications
+1 720 484 1147
Twitter: @standardlithium
LinkedIn: https://www.linkedin.com/company/standard-lithium/
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain certain
“Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and
applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”,
“target, “plan”, “forecast”, “may”, “schedule” and other similar words or expressions identify forward-looking statements or
information. These forward-looking statements or information may relate to intended development timelines, future prices of
commodities, accuracy of mineral or resource exploration activity, reserves or resources, regulatory or government
requirements or approvals, the reliability of third party information, continued access to mineral properties or infrastructure,
fluctuations in the market for lithium and its derivatives, changes in exploration costs and government regulation in Canada
and the United States, and other factors or information. Such statements represent the Company’s current views with respect
to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable
by the Company, are inherently subject to significant business, economic, competitive, political and social risks,
contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements
to be materially different from the results, performance or achievements that are or may be expressed or implied by such
forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-
looking statements or information to reflect changes in assumptions or changes in circumstances or any other events
affecting such statements and information other than as required by applicable laws, rules and regulations.
_______________________________________
¹ Total Measured and Indicated Resource of 2.8 Mt LCE at average concentration of 148 mg/L for the combined LANXESS South, Central and West Brine Units; Phase 1A
represents production of approximately 135,000 tonnes LCE or 5% of the total Measured and Indicated Resources.