Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SLG.V ·

San Lorenzo Intersects 4.5 Meters of 6.52 G/T GOLD Including 1.23 Meters Grading 9.54 G/T GOLD IN Arco de Oro Hole 2

Drill Results

SAN LORENZO INTERSECTS 4.5 METERS OF 6.52 G/T GOLD INCLUDING 1.23 METERS GRADING 9.54

G/T GOLD IN ARCO DE ORO HOLE 2

CALGARY / April 9, 2025 / San Lorenzo Gold Corp. (" San Lorenzo " or the " Company") (TSXV: SLG) is

pleased to announce assay results from the second hole on its Arco de Oro target gold target. San Lorenzo

also provides an update on preliminary results from the third hole drilled on the target. Arco de Oro is

located within San Lorenzo’s flagship Salvadora property in Chile.

SAL 02–25

The table below provides the assay results from Hole SAL 02-25:

Intercept From (m) To (m) Width (m) Au g/t Ag g/t Cu %

SAL 02-25 A 99.0 103.4 4.4 6.52 13.7 0.1

including 99.0 100.2 1.2 9.54 25.2 0.17

San Lorenzo’s VP Exploration, Terence Walker commented on the assay results from the Hole SAL 02-25:

“we are pleased that the gold values returned from the main vein system fit well into our model and yet

again extends the strike length of the Arco de Oro system - by approximately 250 metres to the south-east.

San Lorenzo drilling has now intercepted significant gold grades over 1.3 kilometers of strike length and at

depths up to 300 metres. The vein system remains open in all directions”.

SAL 03 – 25

San Lorenzo has also received preliminary results from hole SAL 03-25 – the third hole recently drilled on

the Arco de Oro trend. Significant and anomalous gold values were returned over an unexpectedly

wide interval. However, those values were wide spaced and intermittent. As a result, San Lorenzo has

decided to initiate a detailed field investigation prior to releasing assay information which may be

unreliable. Preliminary indications are that SAL 03-25 was drilled within and across a fault zone which

has caused the system, visible from surface workings to extend for at least another 2 kilometers, to have

been laterally displaced in the vicinity of hole SAL 03-25. A coherent vein, like those in surface and

underground workings and all other Arco de Oro drill holes, was not intercepted in hole SAL 03-25.

San Lorenzo will start an IP survey to expand geophysical coverage at both Arco de Oro and Cerro Blanco

immediately, which will be closely followed up by the next phase of drilling. Details will be provided in an

upcoming news release.

Sample Acquisition, Handling, Analysis and Qualified Person

All drill core logging, sample selection and cutting, followed by bagging and delivery of 50% of the HQ

core to the ALS lab in Copiapó, was carried out by San Lorenzo staff under the on-site supervision of Eric

Hanson P. Geo. or Terence Walker, P. Geo., each a “qualified person” for purposes of NI 43-101. All

2

assays were conducted by ALS Patagonia Limited. Samples were crushed and screened to -80 mesh and

analyzed using their multi-element ICP after aqua-regia digestion. Gold was analyzed by fire assay

atomic adsorption. ALS included standard check sampling techniques including blank and duplicate

insertions.

Terence Walker, P. Geo. and QP, has reviewed and approved the contents of this release.

About San Lorenzo

San Lorenzo is focused on advancing its flagship Salvadora property located in Chile’s mega-porphyry belt.

Results obtained from drilling programs already conducted on 4 different targets have convinced

management that several significant gold and copper enriched epithermal and porphyry style systems lie

within the boundaries of the Salvadora property.

For further information, please contact:

Terence (Terry) Walker, VP Exploration

Email: [email protected]

Ph: + 56 9 5179 5902

Or:

Roger Blair or Jeff Wilson, Acuity Advisory Corp.

Email: [email protected]

Ph: +1 604 351 0025 or +1 604 837 5440

Or:

Al Kroontje

Email: [email protected]

Ph: +1 403 607 4009

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news

release.

Not for distribution to United States newswire services or for release, publication, distribution or

dissemination directly, or indirectly, in whole or in part, in or into the United States

Cautionary Note Regarding Forward-Looking Information

This news release may contain forward-looking information that involves substantial known and unknown risks and uncertainties,

most of which are beyond the control of San Lorenzo. All statements included herein other than statements of historical fact are

forward-looking information. Such forward-looking information involves various risks and uncertainties. This is especially true of

statements related to geological interpretations, IP and drilling programs. There can be no assurance that such information will

prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. Any

forward-looking statements are made as of the date of this release and, other than as required by applicable securities laws, San

Lorenzo does not assume any obligation to update or revise them to reflect new events or circumstances.