Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SKYG.V ·

Sky Gold’S Geochemical Sampling Yields Significant Particulate GOLD Grains ON Its Consolidated Shebandowan Property, Northwestern Ontario

Sampling & Geoscience Results

SKY GOLD’S GEOCHEMICAL SAMPLING YIELDS SIGNIFICANT

PARTICULATE GOLD GRAINS ON ITS CONSOLIDATED

SHEBANDOWAN PROPERTY, NORTHWESTERN ONTARIO

April 24, 2025, Vancouver, BC, Canada – SKY GOLD CORP. (“Sky” or the “Company”) (TSX.V: SKYG) (US:

SRKZF) is pleased to announce that its basal-till geochemical sampling program involving mineral

concentration work, has yielded significant particulate gold grains on its Consolidated Shebandowan base

& precious-metals project (the “Property”).

The Property, comprising 10,487 hectares, is situated 70 km west of the City of Thunder Bay and 6 km

southwest of the past -producing Shebandowan Ni-Cu-Co-Cr-PGE mine, operated by Inco Ltd during the

period of 1970 to 1989. The Shebandowan mine yielded historical production of 8.6 million tonnes at a

grade of 2.00% nickel, 1.00% copper, 2.68 g/t platinum-group-elements.

GOLD CONCENTRATION GEOCHEMICAL RESULTS:

Fifty-two (52) 10-kilogram samples of basal till were collected from the southwestern portion of the

Property in 2024. This detailed sampling comprised part of a broader , property-wide basal-till-sampling

program completed by Sky Gold, which yielded impressive results currently slated for follow-up drilling in

2025 (see Sky Gold news release dated April 16, 2025).

Figure 1. Particulate Gold Grains - Priority Target Areas

The purpose of the 10-kilogram sampling was to verify and corroborate the results of a similar historic

geochemical survey, completed by Mingold Resources in 1990. Mingold’s work at that time outlined an

area of approximately 1 km X 1 km, reportedly yielding particulate gold grains in glacial till samples.

Highlighting Sky’s results is a cluster of 3 anomalous sample sites yielding 46, 18 and 15 gold grains ,

respectively (see Figure 1). Calculated total gold for the above 3 sample sites are 550, 285 & 215 ppb Au

(see Figure 1). Notably, the 3 sample sites are closely related to an unnamed ENE-trending fault near the

contact with intermediate volcanic rocks and granodioritic intrusive tocks, a classic favorable setting for

orogenic gold deposits to occur.

Figure 2. Total Gold (PP) – Priority Target Areas

A second cluster occurs to the south of the first and is intimately associated with the crustal -scale Tinto

Fault. Three sampling sites yielded a total of 27, 17 & 16 particulate gold grains with corresponding total

gold values of 1,872, 289 and 229 ppb gold, respectively (see Figure 2). Two of the anomalous sites yielding

particulate gold grains are also located immediately to the south of a strong conductor, yielded by the

VTEM airborne geophysical survey, suggesting a possible nearby bedrock source for the gold grains.

The 2 clusters containing particulate gold grains also coincide with strongly anomalous values in nickel,

cobalt, chrome, gold, copper & zinc, all suggestive of the presence of magmatic nickel , volcanogenic

massive sulphide as well as orogenic gold deposits.

Overburden Drilling Management (ODM) in Nepean, Ontario utilizes custom gravity concentration devices

to recover gold grains of all sizes. The refined concentrates that ODM produces are ideal for characterizing

particulate gold grains and for subsequent geochemical analyses.

UPCOMING SPRING EXPLORATION PROGRAM:

During the upcoming field season this spring, geological mapping and prospecting will be completed with

a priority placed on rock sampling and mapping of the target areas containing anomalous particulate gold

grains. This will be followed up by a subsequent program of trenching and diamond drilling, anticipated

for late summer to early fall of 2025.

QUALIFIED PERSON:

Sky Gold Corp.’s disclosure of a technical or scientific nature in this news release has been reviewed and

approved by Don Hoy, P. Geo., who serves as a qualified person under the definition of National

Instrument 43-101.

ON BEHALF OF THE BOARD

Mike England

CEO, PRESIDENT & DIRECTOR

FOR FURTHER INFORMATION PLEASE CONTACT

Tel: 1-604-683-3995

Toll Free: 1-888-945-4770

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

Certain statements in this release are forward-looking statements, which reflect the expectations of

management regarding the matters described herein. Forward-looking statements consist of statements

that are not purely historical, including any statements regarding beliefs, plans, expectations, or intentions

regarding the future. Such statements are subject to risks and uncertainties that may cause actual results,

performance, or developments to differ materially from those contained in the statements, including with

respect to the completion of the Consolidation or the identification or acquisition of additional mineral

assets. No assurance can be given that any of the events anticipated by the forward -looking statements

will occur or, if they do occur, what benefits the Company will obtain fr om them. These forward-looking

statements reflect management's current views and are based on certain expectations, estimates and

assumptions which may prove to be incorrect. A number of risks and uncertainties could cause our actual

results to differ materially from those expressed or implied by the forward -looking statements, including

factors beyond the Company's control. These forward-looking statements are made as of the date of this

news release.