Skeena Intersects Thick Intercepts Grading 5.67 g/t AuEq over 71.85 m and 9.15 g/t AuEq over 25.50 m within 21C Zone Development Buffer at Eskay Creek
Skeena Intersects Thick Intercepts Grading 5.67 g/t AuEq over 71.85 m and
9.15 g/t AuEq over 25.50 m within 21C Zone Development Buffer at Eskay Creek
Vancouver, BC ( January 28, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF)
(“Skeena” or the “Company”) is pleased to report additional diamond drill core results from the Phase
2 campaign of definition and exploration drilling at the Eskay Creek Project (“Eskay Creek” or the
“Project”) located in the Golden Triangle of British Columbia. The Phase 2 infill program focused upon
resource category conversions for the Pre-Feasibility Study (“PFS”) on open -pit constrained
resources, is now complete. Six drill rigs are currently active at the Project finalizing a 5,000 m near-
mine exploration program. Reference images are presented at the end of this release as well as on
the Company’s website.
Eskay Creek Infill Drilling Highlights - 21B and 21C Zones
• 22.23 g/t Au, 1,605 g/t Ag (43.63 g/t AuEq) over 2.79 m (SK-20-589)
• 20.92 g/t Au, 258 g/t Ag (24.36 g/t AuEq) over 6.45 m (SK-20-591)
• 8.50 g/t Au, 182 g/t Ag (10.92 g/t AuEq) over 10.75 m (SK-20-596)
• 23.13 g/t Au, 613 g/t Ag (31.30 g/t AuEq) over 4.10 m (SK-20-598)
• 2.52 g/t Au, 92 g/t Ag (3.75 g/t AuEq) over 27.22 m (SK-20-607)
• 5.74 g/t Au, 247 g/t Ag (9.04 g/t AuEq) over 12.75 m (SK-20-623)
• 5.38 g/t Au, 22 g/t Ag (5.67 g/t AuEq) over 71.85 m (SK-20-626)
• 8.82 g/t Au, 25 g/t Ag (9.15 g/t AuEq) over 25.50 m (SK-20-627)
Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths range from 70 -100% of reported core lengths. Length
weighted AuEq composites are constrained by geological considerations. Grade -capping of individual assays has not been applied to the Au
and Ag assays informing the length -weighted AuEq composites. Metallurgical processing recoveries h ave not been applied to the AuEq
calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.
High-Grade Intersections Continue to Develop within 21C Zone Development Buffer
Intercepts from the complete d Phase 2 program continue to demonstrate the tenor , continuity, and
thickness of the pit-constrained resources in the 21C Zone at Eskay Creek. This is highlighted by an
intercept of 5.38 g/t Au, 22 g/t Ag (5.67 g/t AuEq) over 71.85 m (SK-20-626) which confirms the
continuity and grade modelled in this portion of the 21C Zone, and is corroborated by 8.82 g/t Au, 25
g/t Ag (9.15 g/t AuEq) over 25.50 m in a flanking drill hole (SK-20-627). Mineralization in this area is
gold-dominant and is hosted within the footwall rhyolite with only minor grade contributions from silver.
These drill holes are situated 75 m north of previously reported 7.17 g/t Au, 146 g/t Ag (9.12 g/t AuEq)
over 49.60 m (SK-20-579).
The Phase 1 and 2 drilling campaigns have successfully confirmed the spatial continuity and tenor of
the mineralization of the Inferred resources defined by the Company’s 2019 Mineral Resource
Estimate (MRE). The incoming assay results from the Phase 2 inf ill drilling program continue to
NR: 21-04 | January 28, 2021
validate the predicted and modelled Inferred mineralization which was informed by widely spaced
historical drill holes in the Skeena 2019 MRE.
About Skeena
Skeena Resources Limited is a Canadian mining exploration company focused on developing the
past-producing Eskay Creek gold -silver mine located in Tahltan Territory in the Golden Triangle of
northwest British Columbia, Canada. The Company released a robust Preliminary Economic
Assessment in late 2019 and is curre ntly focused on infill and exploration drilling at Eskay Creek to
advance the project to Prefeasibility. Skeena is also exploring the past-producing Snip gold mine.
On behalf of the Board of Directors of Skeena Resources Limited,
Walter Coles Jr.
President & CEO
Contact Information
Investor Inquiries: [email protected]
Office Phone: +1 604 684 8725
Company Website: www.skeenaresources.com
Qualified Persons
Exploration activities at the Eskay Creek Project are administered on site by the Company’s
Exploration Managers, Raegan Markel, P.Geo. and Adrian Newton, P.Geo. In accordance with
National Instrument 43-101 Standards of Disclosure for Mineral Projects, Pa ul Geddes, P.Geo. Vice
President Exploration and Resource Development, is the Qualified Person for the Company and has
prepared, validated and approved the technical and scientific content of this news release. The
Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting
the exploration activities on its projects.
Quality Assurance – Quality Control
Once received from the drill and processed, all drill core samples are sawn in half, labelled and
bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are
applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC)
samples at regular intervals in the sample stream, including blanks and reference materials with all
sample shipments to monitor laboratory performance. The QAQC program was designed and
approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s
Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.
Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British
Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard
for gold assays and all analytical methods include quality control materials at set frequencies with
established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for
gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and
upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g
fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric
finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater
than 10,000 ppm are re -analyzed using a gravimetric silver concentrate method. A selected number
of samples are also analyzed using a 48 multi -element geochemical package by a 4 -acid digestion,
followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP -AES) and Inductively
Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with
Inductively Coupled Plasma At omic Emission Spectroscopy (ICP -AES) finish. Samples with sulfur
reporting greater than 10% from the multi -element analysis are re -analyzed for total sulfur by Leco
furnace and infrared spectroscopy.
Cautionary note regarding forward-looking statements
Certain statements made and information contained herein may constitute “forward looking information” and “forward looking
statements” within the meaning of applicable Canadian and United States securities legislation. These stat ements and information are
based on facts currently available to the Company and there is no assurance that actual results will meet management’s expect ations.
Forward-looking statements and information may be identified by such terms as “anticipates”, “believes”, “targets”, “estimates”, “plans”,
“expects”, “may”, “will”, “could” or “would”. Forward -looking statements and information contained herein are based on certain factors
and assumptions regarding, among other things, the estimation of mineral resour ces and reserves, the realization of resource and
reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating
costs, the availability of financing, the receipt of regulatory appr ovals, environmental risks, title disputes and other matters. While the
Company considers its assumptions to be reasonable as of the date hereof, forward -looking statements and information are not
guarantees of future performance and readers should not place undue importance on such statements as actual events and results may
differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information
except as may be required by applicable securities laws.
Neither the Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the
adequacy or accuracy of this release.
Table 1: Eskay Creek Project 2020 Length-Weighted Drill Hole Gold and Silver Composites:
Hole-ID From
(m) To (m) Core
Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Zone Phase
SK-20-585 109.25 115.65 6.40 5.66 58 6.43 21B 2
SK-20-585 123.00 133.50 10.50 1.26 10 1.40 21B 2
SK-20-587 141.52 150.02 8.50 2.04 222 5.00 21C 2
Including 143.56 144.71 1.15 7.06 387 12.22 21C 2
and 144.71 145.54 0.83 5.09 1,135 20.22 21C 2
SK-20-588 145.00 152.31 7.31 3.20 106 4.60 21C 2
Including 146.97 147.66 0.69 14.95 392 20.18 21C 2
SK-20-588 165.86 177.50 11.64 2.02 83 3.12 21C 2
Including 167.35 167.85 0.50 5.14 460 11.27 21C 2
SK-20-589 145.50 148.24 2.74 3.85 140 5.72 21C 2
Including 146.41 147.41 1.00 8.58 368 13.49 21C 2
SK-20-589 151.38 154.17 2.79 22.23 1,605 43.63 21C 2
Including 151.38 152.24 0.86 18.55 2,360 50.02 21C 2
and 152.24 152.74 0.50 71.70 1,510 91.83 21C 2
and 152.74 153.67 0.93 7.59 1,230 23.99 21C 2
and 153.67 154.17 0.50 6.33 1,100 21.00 21C 2
SK-20-589 165.50 182.79 17.29 1.85 69 2.77 21C 2
SK-20-590 148.00 150.00 2.00 0.89 6 0.96 21B 2
SK-20-590 160.00 174.13 14.13 2.19 23 2.50 21B 2
SK-20-591 137.50 143.95 6.45 20.92 258 24.36 21B 2
Including 141.00 142.00 1.00 20.60 220 23.53 21B 2
and 142.00 143.00 1.00 43.20 864 54.72 21B 2
and 143.00 143.95 0.95 61.20 420 66.80 21B 2
SK-20-591 146.00 158.65 12.65 3.76 116 5.30 21B 2
Including 147.00 148.00 1.00 9.52 180 11.92 21B 2
and 151.00 152.00 1.00 10.55 50 11.22 21B 2
SK-20-591 169.70 173.50 3.80 2.95 5 3.01 21B 2
Hole-ID From
(m) To (m) Core
Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Zone Phase
SK-20-592 132.55 134.80 2.25 5.10 127 6.78 21B 2
Including 134.00 134.80 0.80 9.40 210 12.20 21B 2
SK-20-592 140.10 149.60 9.50 2.43 90 6.30 21B 2
Including 147.50 148.55 1.05 4.53 504 11.25 21B 2
SK-20-592 171.00 173.00 2.00 1.39 5 1.45 21B 2
SK-20-593 133.00 152.50 19.50 3.10 60 3.90 21B 2
Including 135.00 136.00 1.00 9.49 172 11.78 21B 2
and 140.00 140.60 0.60 9.48 196 12.09 21B 2
and 140.60 141.17 0.57 7.74 207 10.50 21B 2
SK-20-593 164.50 172.00 7.50 2.84 6 2.91 21B 2
SK-20-594 128.75 170.00 41.25 1.39 35 1.85 21B 2
SK-20-594 179.00 183.50 4.50 1.45 9 1.57 21B 2
SK-20-594 188.00 190.00 2.00 1.47 13 1.64 21B 2
SK-20-595 132.00 155.00 23.00 2.07 33 2.50 21B 2
Including 134.50 135.50 1.00 10.50 19 10.75 21B 2
SK-20-595 167.00 188.00 21.00 1.18 8 1.29 21B 2
SK-20-596 131.00 141.75 10.75 8.50 182 10.92 21B 2
Including 132.00 133.00 1.00 11.95 145 13.88 21B 2
and 133.00 134.00 1.00 14.85 231 17.93 21B 2
and 134.00 135.00 1.00 14.65 467 20.88 21B 2
and 135.00 135.85 0.85 29.40 628 37.77 21B 2
and 135.85 136.35 0.50 20.90 189 23.42 21B 2
SK-20-596 144.50 166.50 22.00 2.16 8 2.26 21B 2
Including 165.15 166.50 1.35 15.75 16 15.96 21B 2
SK-20-597 127.50 139.75 12.25 2.53 21 2.81 21B 2
Including 130.80 131.75 0.95 14.05 26 14.40 21B 2
SK-20-597 153.50 162.00 8.50 1.09 6 1.18 21B 2
SK-20-597 164.50 167.00 2.50 1.55 9 1.67 21B 2
SK-20-597 172.90 182.00 9.10 1.36 5 1.43 21B 2
SK-20-598 115.00 119.10 4.10 23.13 613 31.30 21B 2
Including 117.00 118.00 1.00 34.80 1,585 55.93 21B 2
and 118.00 118.50 0.50 56.90 741 66.78 21B 2
and 118.50 119.10 0.60 50.30 911 62.45 21B 2
SK-20-598 131.05 137.00 5.95 1.84 47 2.47 21B 2
SK-20-598 141.50 153.05 11.55 3.23 11 3.37 21B 2
Including 149.00 150.00 1.00 11.90 23 12.21 21B 2
SK-20-598 161.00 176.00 15.00 1.54 5 1.61 21B 2
SK-20-599 129.80 140.20 10.40 3.27 40 3.81 21B 2
Including 134.65 135.20 0.55 17.80 87 18.96 21B 2
SK-20-599 150.50 153.50 3.00 0.83 5 0.90 21B 2
SK-20-599 156.50 170.40 13.90 1.27 9 1.39 21B 2
SK-20-599 173.15 177.15 4.00 1.65 23 1.96 21B 2
SK-20-599 181.60 186.00 4.40 1.03 5 1.09 21B 2
SK-20-602 142.00 151.60 9.60 1.62 11 1.77 21C 2
SK-20-603 141.00 144.39 3.39 0.75 40 1.29 21C 2
SK-20-603 147.35 153.00 5.65 1.18 6 1.25 21C 2
SK-20-603 176.00 191.00 15.00 1.43 8 1.54 21C 2
SK-20-605 146.00 152.54 6.54 1.44 7 1.53 21C 2
SK-20-606 131.50 143.85 12.35 2.44 64 3.29 21B 2
SK-20-606 146.50 152.00 5.50 1.20 22 1.49 21B 2
SK-20-606 159.50 168.50 9.00 1.68 30 2.08 21B 2
SK-20-607 115.00 117.30 2.30 6.01 181 8.42 21B 2
Including 116.60 117.30 0.70 15.35 411 20.83 21B 2
SK-20-607 125.24 152.46 27.22 2.52 92 3.75 21B 2
Hole-ID From
(m) To (m) Core
Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Zone Phase
Including 147.71 149.00 1.29 13.15 841 24.36 21B 2
SK-20-608 113.50 116.00 2.50 4.85 81 5.94 21B 2
SK-20-608 122.00 131.00 9.00 2.85 86 3.99 21B 2
SK-20-608 134.00 141.10 7.10 2.54 7 2.63 21B 2
SK-20-608 144.15 146.95 2.80 1.00 8 1.11 21B 2
SK-20-609 128.50 141.12 12.62 1.44 131 3.19 21B 2
SK-20-609 144.58 153.12 8.54 0.66 9 0.78 21B 2
SK-20-609 155.64 170.00 14.36 1.13 8 1.24 21B 2
SK-20-609 172.68 175.30 2.62 5.04 37 5.52 21B 2
SK-20-613 113.00 115.00 2.00 0.51 20 0.77 21C 2
SK-20-613 134.03 152.00 17.97 1.40 29 1.79 21C 2
SK-20-614 142.70 152.70 10.00 1.73 161 3.87 21C 2
SK-20-614 162.50 172.00 9.50 2.18 6 2.25 21C 2
SK-20-614 176.85 185.50 8.65 1.54 5 1.60 21C 2
SK-20-616 145.00 150.50 5.50 1.78 511 8.58 21C 2
Including 145.00 146.00 1.00 1.24 958 14.01 21C 2
and 146.71 147.70 0.99 0.94 893 12.85 21C 2
and 147.70 148.82 1.12 0.60 742 10.49 21C 2
SK-20-616 156.50 160.00 3.50 0.88 11 1.03 21C 2
SK-20-616 164.64 182.50 17.86 2.42 6 2.49 21C 2
SK-20-617 141.68 147.05 5.37 4.10 201 6.78 21C 2
Including 143.15 144.05 0.90 18.15 1,020 31.75 21C 2
SK-20-617 165.20 179.00 13.80 3.11 5 3.17 21C 2
Including 172.00 173.50 1.50 10.05 <5 10.05 21C 2
SK-20-618 150.45 159.00 8.55 0.61 5 0.68 21C 2
SK-20-618 163.00 172.00 9.00 3.57 119 5.16 21C 2
Including 169.00 170.50 1.50 13.30 269 16.89 21C 2
SK-20-618 175.00 179.50 4.50 2.93 5 3.00 21C 2
SK-20-620 140.17 149.00 8.83 1.53 118 3.11 21C 2
Including 141.05 141.59 0.54 7.22 958 19.99 21C 2
SK-20-620 156.00 166.00 10.00 1.12 5 1.18 21C 2
SK-20-620 169.28 187.00 17.72 3.55 19 3.80 21C 2
Including 170.53 172.03 1.50 21.20 141 23.08 21C 2
SK-20-620 190.00 196.00 6.00 1.06 5 1.12 21C 2
SK-20-621 170.47 173.00 2.53 1.17 18 1.41 21C 2
SK-20-621 178.00 187.00 9.00 2.60 5 2.67 21C 2
SK-20-622 174.88 177.35 2.47 11.50 271 15.11 21C 2
Including 174.88 176.00 1.12 21.40 513 28.24 21C 2
SK-20-623 133.25 146.00 12.75 5.74 247 9.04 21C 2
Including 134.80 135.44 0.64 30.20 1,220 46.47 21C 2
and 135.44 136.13 0.69 26.60 147 28.56 21C 2
and 139.30 139.80 0.50 4.96 1,390 23.49 21C 2
and 139.80 140.32 0.52 12.15 2,650 47.48 21C 2
and 142.00 143.00 1.00 13.45 22 13.74 21C 2
SK-20-623 160.26 162.40 2.14 1.16 5 1.22 21C 2
SK-20-623 173.30 189.30 16.00 2.46 6 2.54 21C 2
Including 176.00 177.00 1.00 11.00 7 11.09 21C 2
SK-20-625 157.61 174.50 16.89 1.72 8 1.82 21C 2
SK-20-625 187.00 216.50 29.50 2.52 18 2.76 21C 2
Including 215.00 216.50 1.50 25.90 91 27.11 21C 2
SK-20-625 222.50 227.00 4.50 1.10 5 1.17 21C 2
SK-20-625 230.00 235.95 5.95 1.06 5 1.13 21C 2
SK-20-626 162.18 234.03 71.85 5.38 22 5.67 21C 2
Including 188.25 188.97 0.72 21.60 6 21.68 21C 2
Hole-ID From
(m) To (m) Core
Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Zone Phase
and 188.97 190.00 1.03 15.10 9 15.22 21C 2
and 190.00 191.50 1.50 18.95 31 19.36 21C 2
and 191.50 192.12 0.62 26.90 19 27.15 21C 2
and 192.12 192.99 0.87 10.10 221 13.05 21C 2
and 192.99 193.49 0.50 23.50 200 26.17 21C 2
and 193.49 194.50 1.01 21.00 250 24.33 21C 2
and 194.50 196.00 1.50 15.70 23 16.01 21C 2
and 196.00 197.50 1.50 31.30 53 32.01 21C 2
and 199.58 200.18 0.60 83.60 194 86.19 21C 2
SK-20-627 161.00 186.50 25.50 8.82 25 9.15 21C 2
Including 178.12 179.50 1.38 12.15 6 12.23 21C 2
and 179.50 181.00 1.50 17.95 7 18.04 21C 2
and 181.00 182.50 1.50 45.30 26 45.65 21C 2
and 182.50 183.50 1.00 33.10 43 33.67 21C 2
and 183.50 184.60 1.10 38.30 65 39.17 21C 2
and 184.60 185.23 0.63 8.21 343 12.78 21C 2
SK-20-627 192.50 208.00 15.50 2.24 19 2.49 21C 2
Including 193.50 194.23 0.73 19.50 49 20.15 21C 2
SK-20-627 215.00 219.50 4.50 0.86 28 1.23 21C 2
SK-20-627 222.50 225.50 3.00 0.93 16 1.14 21C 2
SK-20-627 229.00 233.00 4.00 1.16 5 1.22 21C 2
SK-20-538 Abandoned 21C 2
SK-20-553 Abandoned 21C 2
SK-20-561 Abandoned 21B 2
SK-20-567 NSA HW 1
SK-20-568 NSA HW 1
SK-20-569 NSA HW 1
SK-20-570 NSA HW 1
SK-20-575 Assays Pending 2
SK-20-576 Abandoned 21C 2
SK-20-577 Abandoned 21C 2
SK-20-580 Assays Pending 2
SK-20-581 Abandoned 21B 2
SK-20-586 NSA 21C 2
SK-20-600 Abandoned 21B 2
SK-20-601 Abandoned 21B 2
SK-20-604 Assays Pending 2
SK-20-610 Assays Pending 2
SK-20-611 Assays Pending 2
SK-20-612 Assays Pending 2
SK-20-615 Assays Pending 2
SK-20-619 Assays Pending 2
SK-20-624 Assays Pending 2
Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths range from 70-100% of reported core lengths. Length weighted
AuEq composites are constrained by geological considerations. Grade -capping of individual assays has not been applied to the Au and Ag assays
informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at
100%. Samples below detection limit were nulled to a value of zero. NSA – No Significant Assays.
Table 2: Mine Grid Drill Hole Locations and Orientations:
Hole-ID Easting (m) Northing (m) Elevation (m) Length (m) Azimuth (°) Dip (°)
SK-20-538 9755.3 10753.6 892.2 123.3 112.1 -72.0
SK-20-553 9809.4 10565.9 956.7 38.0 115.9 -82.1
SK-20-561 9866.5 10440.1 1012.3 64.0 127.2 -57.0
SK-20-567 9880.5 10806.0 911.8 85.0 54.1 -72.0
SK-20-568 9880.5 10806.0 913.9 100.0 53.9 -58.0
SK-20-569 9880.5 10806.0 915.7 97.0 61.9 -62.0
SK-20-570 9880.5 10806.0 913.5 97.8 77.0 -57.1
SK-20-576 9761.4 10289.0 1018.7 58.0 140.0 -85.1
SK-20-577 9761.4 10289.0 1014.2 4.0 144.9 -81.1
SK-20-581 9886.9 10361.8 1013.5 20.0 102.2 -66.3
SK-20-585 9886.9 10361.8 1013.4 135.0 149.9 -68.1
SK-20-586 9797.8 10458.7 1004.0 242.0 90.2 -84.3
SK-20-587 9738.1 10633.7 925.3 152.0 50.0 -79.0
SK-20-588 9740.2 10301.5 1013.8 186.0 4.7 -77.6
SK-20-589 9740.2 10301.5 1014.3 200.0 345.0 -81.0
SK-20-590 9889.1 10558.3 971.4 191.0 14.9 -75.9
SK-20-591 9889.1 10558.3 971.5 188.0 30.0 -75.8
SK-20-592 9889.1 10558.3 972.3 183.1 48.1 -77.1
SK-20-593 9889.1 10558.3 972.2 180.0 52.4 -82.0
SK-20-594 9889.1 10558.3 970.0 190.0 71.2 -69.3
SK-20-595 9889.1 10558.3 969.2 200.0 71.3 -74.5
SK-20-596 9889.1 10558.3 969.3 185.0 79.9 -81.2
SK-20-597 9889.1 10558.3 972.1 185.0 82.7 -72.6
SK-20-598 9889.1 10558.3 971.8 176.0 82.2 -67.0
SK-20-599 9889.1 10558.3 972.5 195.0 95.0 -74.9
SK-20-600 9866.5 10440.1 1011.2 73.0 127.0 -57.4
SK-20-601 9866.5 10440.1 1010.6 14.0 127.4 -56.9
SK-20-602 9755.3 10753.6 893.4 175.0 37.0 -77.1
SK-20-603 9755.3 10753.6 892.5 200.0 40.8 -74.9
SK-20-605 9755.3 10753.6 892.6 165.0 59.2 -67.3
SK-20-606 9866.5 10440.1 1010.5 195.0 128.1 -57.2
SK-20-607 9923.3 10471.9 996.1 155.0 95.1 -78.9
SK-20-608 9923.3 10471.9 997.2 155.0 123.6 -74.0
SK-20-609 9923.3 10471.9 998.2 180.0 144.8 -82.0
SK-20-613 9712.5 10627.4 918.7 158.0 108.2 -70.2
SK-20-614 9755.9 10661.4 910.9 200.0 86.1 -68.0
SK-20-616 9755.9 10661.4 912.9 188.0 90.0 -62.0
SK-20-617 9755.9 10661.4 911.8 180.0 98.0 -65.0
SK-20-618 9755.9 10661.4 915.6 185.0 99.9 -60.0
SK-20-620 9755.9 10661.4 912.3 200.0 98.2 -69.2
SK-20-621 9755.9 10661.4 912.6 190.0 102.2 -55.8
SK-20-622 9755.9 10661.4 913.1 195.0 106.1 -51.7
SK-20-623 9755.9 10661.4 911.9 201.0 110.1 -69.0
SK-20-625 9855.7 10366.1 1012.8 242.0 242.3 -74.0
SK-20-626 9855.7 10366.1 1012.7 250.0 242.1 -70.1
SK-20-627 9855.7 10366.1 1013.1 250.0 251.9 -69.8