Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SKE.TO ·

Skeena Intersects 19.26 g/t Gold over 11.85 Metres at Snip Twin Zone Also Yields 35.49 g/t Gold over 4.35 Metres

Drill Results

Skeena Intersects 19.26 g/t Gold over 11.85 Metres at Snip

Twin Zone Also Yields 35.49 g/t Gold over 4.35 Metres

Vancouver, BC ( January 11, 2018) Skeena Resources Limited (TSX.V: SKE) (“Skeena” or the

“Company”) is pleased to announce additional drill results from 13 holes at the Company’s Snip gold

project (“Snip”) located in the Golden Triangle of British Columbia.

Drilling Highlights

• UG17-027: 74.35 g/t Au over 2.00 metres

• UG17-033: 77.41 g/t Au over 1.10 metres

• UG17-034: 26.28 g/t Au over 2.03 metres

• UG17-034: 7.48 g/t Au over 6.35 metres

• UG17-035: 19.26 g/t Au over 11.85 metres

• UG17-035: 11.21 g/t Au over 5.95 metres

• UG17-036: 35.49 g/t Au over 4.35 metres

Cross sections and drill hole data are available on the Company’s website. A detailed table of length-

weighted gold composites is presented a t the end of this news release. Assays are still pending for

21 holes of the 62 underground drill holes completed in 2017.

Twin Zone Extension Demonstrates High Gold Tenor

Underground drill hole UG17-035 on Section 4920E intersected two previously undrilled mineralized

sections of the eastern Twin Zone grading 19.26 g/t Au over 11.85 metres followed by a second

interval grading 11.21 g/t Au over 5.95 metres . These new intersections are located 60 metres up

dip of historic drill hole UG-56 (drilled in 1988), which intersected 14.73 g/t Au over 4.00 metres. On

the same section 100 metres up dip of the new occurrences, 2017 drill hole UG17-036 intersected

additional mineralization grading 35.49 g/t Au over 4.35 metres . The Twin Zone was further

extended on Section 4900E by drill holes UG17-027 and UG17-028 which intersected 74.35 g/t Au

over 2.00 metres and 6.77 g/t Au over 7.56 metres respectively.

High Grade 412 Zone Demonstrates Continuity

The 412 Zone, l ocated 150 metres into the footwall of the Twin Zone, continues to show continuity

with drill hole UG17-034 on Section 4920E intersecting two mineralized veins averaging 26.28 g/t Au

over 2.03 metres and 7.48 g/t Au over 6.35 metres . The downdip continuity of the 412 Zone is

demonstrated by previously disclosed 2017 drill holes UG17-021 which intersected 4.88 g/t Au over

8.30 metres including 37.60 g/t Au over 0.50 metres and UG17-020 which intersected 132.00 g/t

Au over 0.50 metres. This mineralized corridor remains open for expansion at depth.

NR: 18-2

January 11, 2018

The Twin Zone, which accounted for 61% of historical production, is a dilatant shear zone consisting

of a number of southwest dipping shear veins. The most productive parts of the shear zone occur

when the structures change orientation and become steeper dipping, causing zones of extension that

can form thicker zones of mineralization, including parallel zones as seen in the 150 and 130 Veins,

which accounted for 24% of historical production. 2017 underground drilling is successfully identifying

other dilatant shear zones, caused by changes in attitude of the shears, and specificall y zones that

are down plunge or in the footwall of the Twin Zone, such as the 412 Zone.

Quality Assurance and Quality Control

A rigorous chain-of-custody and quality assurance/quality control program, consisting of the insertion

of certified standard control samples, duplicates and blanks, was applied to the NQ 2-diameter, sawn

half-core samples. Sample preparation and analyses for 2017 samples were completed at Activation

Labs in Kamloops, B.C. Gold is determined by 50 -gram fire assay followed by an atomic absorption

finish, or by gravimetric finish for samples over 10 g/t. Silver and other elements are determin ed by

an ICP analysis following aqua regia digestion. Samples with over 100 g/t silver, 0.5% lead or 1% zinc

are re-analyzed by a 4-acid digestion followed by ICP-OES.

Qualified Persons

The scientific and technical information contained in this news release has been reviewed and

approved by Skeena’s Chief Geologist , Ron Nichols , P. Eng., a Qualified Person as defined by

National Instrument 43-101.

About Skeena

Skeena Resources Limited is a junior Canadian mining exploration company focused on developing

prospective precious and base metal properties in the Golden Triangle of northwest British Columbia,

Canada. The Company’s primary activities are the exploration and development of the past-producing

Snip and Eskay Creek mi nes, both acquired from Barrick. In addition, the Company is performing

preliminary exploration on the past -producing Porter Idaho silver mine and has completed a

Preliminary Economic Assessment on the Spectrum-GJ copper-gold porphyry project.

On behalf of the Board of Directors of Skeena Resources Limited,

Walter Coles Jr.

President & CEO

Cautionary note regarding forward-looking statements

Certain statements made and information contained herein may constitute “forward-looking information” and “forward -looking

statements” within the meaning of applicable Canadian and United States securities legislation. These statements and information are

based on facts currently available to the Company and there is no assurance that actual results will meet management’s expectations.

Forward-looking statements and information may be identified by such terms as “anticipates”, “believes”, “targets”, “estimates”, “plans”,

“expects”, “may”, “will”, “could” or “would”. Forward -looking statements and information contained herein are based on certain factors

and assumptions regarding, among other things, the estimation of min eral resources and reserves, the realization of resource and

reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital a nd

operating costs, the availability of financing, the receipt of regu latory approvals, environmental risks, title disputes and other matters.

While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are

not guarantees of future performance and readers should not place undue importance on such statements as actual events and results

may differ materially from those described herein. The Company does not undertake to update any forward -looking statements or

information except as may be required by applicable securities laws.

Neither TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts

responsibility for the adequacy or accuracy of this release.

Snip 2017 Underground Drill Hole Assays

SECTION HOLE # FROM TO LENGTH (M) AU g/t TARGET

4900E-500 UG17-026 1.85 3.45 1.60 5.41

31.75 32.75 1.00 5.63

77.20 77.70 0.50 7.17

92.00 95.30 3.30 6.40 Twin Zone

4900E-500 UG17-027 119.50 121.50 2.00 74.35 Twin Zone

incl. 119.50 120.00 0.50 290.00

128.00 129.50 1.50 3.16

4900E-500 UG17-028 1.50 2.52 1.02 13.80

89.00 96.56 7.56 6.77 Twin Zone

incl. 89.00 90.50 1.50 12.30

and 93.72 95.00 1.28 14.15

4900E-500 UG17-029 50.40 51.00 0.60 87.70

84.90 87.95 3.05 4.67 Twin Zone

4900E-500 UG17-038 3.90 4.40 0.50 4.74

117.30 118.80 1.50 4.68 Twin Zone

126.20 127.10 0.90 4.67

4920E-412 UG17-032 99.00 100.50 1.50 4.68

116.50 119.50 3.00 6.90 412 Zone

4920E-412 UG17-033 75.70 76.80 1.10 77.14 412 Zone

88.85 89.85 1.00 6.34

134.45 135.15 0.70 5.74

4920E-412 UG17-034 53.22 55.25 2.03 26.28 412 Zone

incl. 53.22 54.25 1.03 50.80

76.65 83.00 6.35 7.48 412 Zone

incl. 81.10 81.80 0.70 24.60

4920E-412 UG17-035 6.45 7.45 1.00 9.25

91.60 92.10 0.50 19.00

129.00 140.85 11.85 19.26 Twin Zone

incl. 136.50 140.85 4.35 47.45

incl. 138.00 139.00 1.00 17.20

and 140.35 140.85 0.50 352.00

152.05 158.00 5.95 11.21 Twin Zone

4920E-412 UG17-036 59.20 63.55 4.35 35.49 Twin Zone

incl. 59.20 59.80 0.60 11.30

and 62.70 63.55 0.85 171.00

106.90 107.59 0.69 13.50

4920E-412 UG17-037 3.15 4.50 1.35 6.37

35.00 36.80 1.80 5.10

65.60 66.35 0.75 43.90

73.70 74.70 1.00 12.91 Twin Zone

4920E-412 UG17-041 50.60 51.20 0.60 10.20

87.95 88.85 0.90 10.90 Twin Zone

4920E-412 UG17-042 4.50 5.20 0.70 11.20

41.00 42.50 1.50 7.29

126.90 128.00 1.10 24.80 Twin Zone

Notes: All values are un-cut. Drill intercepts are core length as there is insufficient data available

to present true widths.