Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SKE.TO ·

Skeena Intersects 16.64 g/t Au over 5.10 m in 200 Footwall at Snip

Drill Results

Skeena Intersects 16.64 g/t Au over 5.10 m in 200 Footwall at Snip

Vancouver, BC ( January 9 , 2020) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF)

(“Skeena” or the “Company”) is pleased to announce the remaining analytical results from the 2019

Phase I surface exploration drilling program at the 100% owned Snip gold project (“Snip”) located in

the Golden Triangle of British Columbia. The 2019 exploration program consisted of 10 surface drill

holes totaling 1,934 m which tested the 200 Footwall Corridor (“200 Footwall”). Reference images are

presented at the end of this release as well as on the Company’s website.

2019 Phase I Snip Project Drilling Highlights:

• 16.64 g/t Au over 5.10 m (S19-035)

o Including: 96.20 g/t Au over 0.50 m

o And 39.80 g/t Au over 0.85 m

• 57.90 g/t Au over 0.65 m (S19-041)

• 57.00 g/t Au over 0.50 m (S19-041)

• 12.00 g/t Au over 1.35 m (S19-043)

Core lengths are reported due to a lack of supporting data to properly calculate true widths. Length weighted composites were constrained by

geological and grade considerations. Grade capping of individual assays has not been applied to the Au assays infor ming the length weighted

composites. Samples below detection limit were nulled to a value of zero.

New Mineralization Intersected in 200 Footwall

Phase I surface drill hole S19-035 has successfully intersected a new zone of high-grade gold

mineralization averaging 16.64 g/t Au over 5.10 m including two sub-intervals grading 96.20 g/t Au

over 0.50 m and 39.80 g/t Au over 0.85 m in the 200 Footwall. This zone is located 100 m vertically

below surface and 370 m east of the recently reported Phase I 200 Footwall discovery intercept which

graded 1,131.91 g/t (36.39 oz/t) Au over 1.50 m (S19-044). The area surrounding the new zone is

open down-dip and down-plunge.

The outstanding analytical results for drill holes S19-043 and S19-044 have been received. The high-

grade intercept in S19-044 occurred at a depth of 249.60 m. Additional results for this drill hole include

12.60 g/t Au over 0.50 m and 7.41 g/t Au over 0.60 m occurring at 242.35 m and 214.80 m respectively.

Phase I drill hole S19-043 was completed prior to the newly discovered mineralization in drill hole

S19-044 and intersected anomalous gold grades associated with sheared veining including 12.00 g/t

Au over 1.35 m. Recently completed modelling of the 200 Footwall mineralization indicates that this

drill hole did not extend deep enough to adequately test the 200 Footwall and will be deepened during

the next phase of drilling at Snip.

NR: 20-01

January 9, 2020

About Skeena

Skeena Resources Limited is a junior C anadian mining exploration company focused on developing

prospective precious and base metal properties in the Golden Triangle of northwest British Columbia,

Canada. The Company’s primary activities are the exploration and development of the past-producing

Snip mine and the Eskay Creek mine. In addition, the Company has completed a Preliminary

Economic Assessment on the GJ copper-gold porphyry project.

On behalf of the Board of Directors of Skeena Resources Limited,

Walter Coles Jr.

President & CEO

Qualified Persons

Exploration activities at the Eskay Creek Project are administered on site by the Company’s

Exploration Managers, Colin Russell, P.Geo. and Adrian Newton, P.Geo. In accordance with National

Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President

Exploration and Resource Development, is the Qualified Person for the Company and has prepared,

validated and approved the technical and scientific content of this news release. The Company strictly

adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration

activities on its exploration projects.

Quality Assurance – Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and

bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are

applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC)

samples at regular intervals in the sample stream, including blanks and reference materials with all

sample shipments to monitor laboratory performance. The QAQC program was designed and

approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s

Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British

Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 stan dard

for gold assays and all analytical methods include quality control materials at set frequencies with

established data acceptance criteria. The entire sample is crushed and 1kg is pulverized. Analysis for

gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and

upper limit of 100 ppm. Samples with gold assays greater than 100ppm are re -analyzed using a 50g

fire assay fusion with gravimetric finish. Analysis for silver is by 50g fire assay fusion with gravim etric

finish with a lower limit of 5ppm and upper limit of 10,000ppm. Samples with silver assays greater than

10,000ppm are re -analyzed using a gravimetric silver concentrate method. A selected number of

samples are also analyzed using a 48 multi -elemental geochemical package by a 4 -acid digestion,

followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP -AES) and Inductively

Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with

Inductively Coupled Pla sma Atomic Emission Spectroscopy (ICP -AES) finish. Samples with sulfur

reporting greater than 10% from the multi -element analysis are re -analyzed for total sulfur by Leco

furnace and infrared spectroscopy.

Cautionary note regarding forward-looking statements

Certain statements made and information contained herein may constitute “forward looking information” and “forward

looking statements” within the meaning of applicable Canadian and United States securities legislation. These statements

and information are based on facts currently available to the Company and there is no assurance that actual results will

meet management’s expectations. Forward -looking statements and information may be identified by such terms as

“anticipates”, “believes”, “targets”, “e stimates”, “plans”, “expects”, “may”, “will”, “could” or “would”. Forward -looking

statements and information contained herein are based on certain factors and assumptions regarding, among other things,

the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation,

the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of

financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters. While the Company

considers its assumptions to be reasonable as of the date hereof, forward -looking statements and information are not

guarantees of future performance and readers should not place undue importance on such statements as actual events

and results may differ materially from those described herein. The Company does not undertake to update any forward -

looking statements or information except as may be required by applicable securities laws.

Neither TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for

the adequacy or accuracy of this release.

Table 1: Snip Project 2019 Phase I length weighted drill hole gold composites:

HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AREA

S19-035 128.65 133.75 5.10 16.64 200

INCLUDING 128.65 129.15 0.50 96.20 200

AND 129.15 130.00 0.85 39.80 200

S19-041 80.00 81.50 1.50 5.89 HW

S19-041 83.85 84.50 0.65 57.90 HW

S19-041 94.10 94.60 0.50 57.00 200

S19-041 106.40 106.90 0.50 6.74 200

S19-042 63.32 67.00 3.68 6.72 HW

INCLUDING 65.50 66.00 0.50 15.95 HW

AND 66.00 66.50 0.50 18.45 HW

S19-042 112.00 112.50 0.50 10.85 200

S19-043 167.65 169.00 1.35 12.00 HW

S19-043 177.60 178.10 0.50 4.42 HW

S19-044 214.80 215.40 0.60 7.41 UPPER

S19-044 216.30 217.15 0.85 4.41 UPPER

S19-044 242.35 242.85 0.50 12.60 LOWER

Core lengths are reported due to a lack of supporting data to properly calculate true widths. Length weighted composites were constrained by

geological and grade considerations. Grade capping of individual assays has not been applied to the Au assays infor ming the length weighted

composites. Samples below detection limit were nulled to a value of zero.

Table 2: Mine grid coordinate system Phase I drill hole locations and orientations:

HOLE-ID EASTING (m) NORTHING (m) ELEVATION (m) LENGTH (m) AZIMUTH DIP

S19-035 4517.8 2206.5 454.0 279.0 269.1 -69.9

S19-041 4652.3 2285.5 533.3 177.0 330.0 -50.7

S19-042 4652.0 2285.0 534.4 200.0 321.0 -67.0

S19-043 4217.0 1972.0 272.8 266.0 349.6 -71.6

S19-044 4217.0 1972.0 272.8 257.0 357.9 -48.0