Skeena Intersects 14.82 g/t AuEq over 31.30 metres at Eskay Creek

Drill Results

Skeena Intersects 14.82 g/t AuEq over 31.30 metres at Eskay Creek

Vancouver, BC (February 11, 2020) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF)

(“Skeena” or the “Company”) is pleased to announce additional gold-silver drill results from the

2019 Phase I surface drilling program at the Eskay Creek Project (“Eskay Creek”) located in the

Golden Triangle of British Columbia. Four surface drill rigs were utilized for the 2019 Phase I program

in the 21A, 21 E and HW Zones to infill and upgrade areas of Inferred resources to the Indicated

classification. Drill hole results reported in this release are from the 21 A, 21E and HW Zones.

Reference images are presented at the end of this release as well as on the Company’s website.

Phase I Eskay Creek Drilling Highlights:

• 11.53 g/t Au, 247 g/t Ag (14.82 g/t AuEq) over 31.30 m (SK-19-172) - 21A Zone

• 15.02 g/t Au, 70 g/t Ag (15.96 g/t AuEq) over 18.26 m (SK-19-171A) - 21A Zone

• 1.51 g/t Au, 355 g/t Ag (6.24 g/t AuEq) over 21.00 m (SK-19-201) - 21E Zone

• 2.83 g/t Au, 44 g/t Ag (3.42 g/t AuEq) over 25.00 m (SK-19-208) - 21E Zone

Gold Equivalent (AuE q) calculated via the formula: Au (g/t) + [Ag ( g/t) / 7 5]. Reported core lengths represent 80 -100% of true widths and are

supported by well-defined mineralization geometries derived from historical drilling. Grade capping of individual assays has not been applied to the

Au and Ag assays informing the length weighted AuEq composites. Processing recoveries have not been applied to the AuEq calculation and are

disclosed at 100%. Samples below detection limit are nulled to a value of zero.

2019 Drilling Continues to Intersect Increased Grades, While Confirming Widths

Infill drilling within the 21A Zone continues to improve upon historically defined grades as

demonstrated by 2019 Phase I drill hole SK -19-172 which intersected 14.82 g/t AuEq over 31.30

metres. This drilling confirms the 21A Zone thickness as indicated by the nearest historical drill hole

in the current mineral resource model which is located 20 metres down-dip and intersected slightly

lower grade mineralization of 7.63 g/t AuEq over 26.90 metres (CA89-080).

Likewise, additional up-dip confirmation was provided by drill hole SK-19-061 which averaged 10.56

g/t AuEq over 27.50 metres and correlates very well with previously reported thickness from 2018

Phase I drill hole SK-18-023 that intersected 14.57 g/t AuEq over 31.50 metres.

Mineralization within this portion of the 21A Zone is dominantly hosted within the footwall rhyolite

sequence with only a minor contribution from the mudstones (refer to attached section).

Current Status - Eskay Creek Drilling

Four surface-based drill rigs are currently on site at Eskay Creek. The Company anticipates

commencement of the surface 2020 Phase I infill and exploration drilling program in mid-February

2020. The remaining analytical results from the 2019 Phase I drilling program will be disclosed once

all information has been received and validated.

NR: 20-05

February 11, 2020

About Skeena

Skeena Resources Limited is a junior Canadian mining exploration company focused on developing

prospective precious metal properties in the Golden Triangle of northwest British Columbia, Canada.

The Company’s primary activities are the exploration and development of the past -producing Eskay

Creek mine, which contains a combined Indicated and Inferred 4Moz, 4.4 g/t gold-equivalent open-pit

resource. The Company recently completed a Preliminary Economic Assessment (PEA) on Eskay

Creek which highlights an after -tax NPV5% of C$638M, 51% IRR and a 1.2-year payback. Skeena is

also exploring the past-producing Snip gold mine.

On behalf of the Board of Directors of Skeena Resources Limited,

Walter Coles Jr.

President & CEO

Qualified Persons

Exploration activities at the Eskay Creek Project are administered on site by the Company’s

Exploration Managers, Colin Russell, P.Geo. and Adrian Newton, P.Geo. In accordance with National

Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President

Exploration and Resource Development, is the Qualified Person for the Company and has prepared,

validated and approved the technical and scientific content of this news release. The Company strictly

adheres to CIM Best Prac tices Guidelines in conducting, documenting, and reporting its exploration

activities on its exploration projects.

Quality Assurance – Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and

bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are

applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC)

samples at regular intervals in the sample stream, including blanks and reference materials with all

sample shipments to monitor laboratory performance. The QAQC program was designed and

approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s

Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British

Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 sta ndard

for gold assays and all analytical methods include quality control materials at set frequencies with

established data acceptance criteria. The entire sample is crushed and 1kg is pulverized. Analysis for

gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and

upper limit of 100 ppm. Samples with gold assays greater than 100ppm are re -analyzed using a 50g

fire assay fusion with gravimetric finish. Analysis for silver is by 50g fire assay fusion with gravi metric

finish with a lower limit of 5ppm and upper limit of 10,000ppm. Samples with silver assays greater than

10,000ppm are re -analyzed using a gravimetric silver concentrate method. A selected number of

samples are also analyzed using a 48 multi -elemental geochemical package by a 4 -acid digestion,

followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP -AES) and Inductively

Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with

Inductively Coupled Pl asma Atomic Emission Spectroscopy (ICP -AES) finish. Samples with sulfur

reporting greater than 10% from the multi -element analysis are re -analyzed for total sulfur by Leco

furnace and infrared spectroscopy.

Cautionary note regarding forward-looking statements

Certain statements made and information contained herein may constitute “forward looking information” and “forward

looking statements” within the meaning of applicable Canadian and United States securities legislation. These statements

and information are based on facts currently available to the Company and there is no assurance that actual results will

meet management’s expectations. Forward -looking statements and information may be identified by such terms as

“anticipates”, “believes”, “ targets”, “estimates”, “plans”, “expects”, “may”, “will”, “could” or “would”. Forward -looking

statements and information contained herein are based on certain factors and assumptions regarding, among other things,

the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation,

the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of

financing, the receipt of regulatory approvals, en vironmental risks, title disputes and other matters. While the Company

considers its assumptions to be reasonable as of the date hereof, forward -looking statements and information are not

guarantees of future performance and readers should not place undue importance on such statements as actual events

and results may differ materially from those described herein. The Company does not undertake to update any forward -

looking statements or information except as may be required by applicable securities laws.

Neither TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for

the adequacy or accuracy of this release.

Table 1: Eskay Creek Project 2019 Phase I length weighted drill hole gold and silver composites:

HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE

SK-19-096 4.70 5.50 0.80 0.49 47 1.12 21A

SK-19-096 32.50 33.00 0.50 0.61 18 0.85 21A

SK-19-100 ASSAYS PENDING

SK-19-101 22.16 22.70 0.54 1.28 5 1.35 21A

SK-19-128 ASSAYS PENDING

SK-19-130 ASSAYS PENDING

SK-19-133 1.40 3.35 0.03 <5 0.03 HW

SK-19-144 28.00 30.00 0.20 8 0.31 HW

SK-19-150 69.72 70.75 1.03 4.09 5 4.16 21A

SK-19-155 67.00 69.55 2.55 2.51 9 2.63 21A

SK-19-158 64.84 66.70 1.86 2.12 6 2.20 21A

SK-19-162 92.00 93.00 0.24 31 0.65 21A

SK-19-165 ABANDONED 21A

SK-19-165A ABANDONED 21A

SK-19-165B 80.40 82.40 2.00 2.25 63 3.08 21A

SK-19-165B 87.77 100.55 12.78 2.34 5 2.41 21A

SK-19-165B 108.00 110.00 2.00 1.98 78 3.01 21A

SK-19-168 ABANDONED 21A

SK-19-168A 90.50 102.00 11.50 4.96 107 6.38 21A

SK-19-168A 108.50 113.00 4.50 1.10 5 1.17 21A

SK-19-171 ABANDONED 21A

SK-19-171A 98.24 116.50 18.26 15.02 70 15.96 21A

INCLUDING 100.30 101.50 1.20 13.25 <5 13.25 21A

AND 101.50 102.00 0.50 19.20 <5 19.20 21A

AND 104.50 106.00 1.50 10.05 61 10.86 21A

AND 106.00 107.50 1.50 41.50 200 44.17 21A

AND 107.50 109.00 1.50 26.90 288 30.74 21A

AND 109.00 110.50 1.50 14.30 224 17.29 21A

AND 110.50 112.00 1.50 24.80 5 24.87 21A

HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE

AND 112.00 113.00 1.00 15.45 8 15.56 21A

SK-19-171A 132.50 137.00 4.50 1.01 14 1.20 21A

SK-19-172 91.50 122.80 31.30 11.53 247 14.82 21A

INCLUDING 92.15 92.65 0.50 10.10 109 11.55 21A

AND 92.65 93.15 0.50 92.80 1,105 107.53 21A

AND 93.15 94.00 0.85 140.00 981 153.08 21A

AND 94.00 94.51 0.51 141.50 380 146.57 21A

AND 94.51 95.15 0.64 22.60 2,230 52.33 21A

AND 95.15 95.90 0.75 21.30 1,110 36.10 21A

AND 95.90 96.40 0.50 18.85 906 30.93 21A

AND 96.40 96.90 0.50 19.30 2,610 54.10 21A

AND 113.65 114.98 1.33 9.42 186 11.90 21A

SK-19-172 132.50 133.36 0.86 0.72 5 0.79 21A

SK-19-172 140.00 141.00 1.00 1.11 5 1.18 21A

SK-19-173 ABANDONED 21A

SK-19-173A 94.80 95.86 1.06 0.61 8 0.72 21A

SK-19-173A 98.65 101.00 2.35 2.62 5 2.68 21A

SK-19-174 91.48 102.05 10.57 3.36 9 3.48 21A

INCLUDING 95.00 96.00 1.00 12.65 <5 12.65 21A

SK-19-174 117.00 118.10 1.10 0.97 5 1.04 21A

SK-19-175 2.50 22.50 20.00 0.90 6 0.98 21A

SK-19-175 28.00 53.85 25.85 1.87 9 1.99 21A

SK-19-175 56.50 64.00 7.50 1.01 6 1.09 21A

SK-19-176 12.00 22.00 10.00 1.01 15 1.21 21A

SK-19-176 29.50 37.16 7.66 1.09 6 1.17 21A

SK-19-176 43.47 45.20 1.73 0.74 10 0.87 21A

SK-19-177 7.50 25.00 17.50 1.00 8 1.11 21A

SK-19-177 28.00 45.00 17.00 1.03 14 1.21 21A

SK-19-178 5.00 30.75 25.75 1.40 20 1.66 21A

SK-19-178 33.75 36.00 2.25 1.04 5 1.11 21A

SK-19-178 42.00 48.50 6.50 0.94 63 1.78 21A

SK-19-178 53.00 69.90 16.90 0.78 35 1.25 21A

SK-19-178 83.00 104.50 21.50 2.04 7 2.13 21A

SK-19-178 109.00 110.50 1.50 1.31 5 1.38 21A

SK-19-178 115.00 116.50 1.50 0.79 5 0.86 21A

SK-19-178 124.03 128.35 4.32 1.64 64 2.49 21A

SK-19-179 4.75 35.00 30.25 1.12 22 1.41 21A

SK-19-179 41.00 42.50 1.50 0.61 65 1.48 21A

SK-19-179 47.00 89.00 42.00 1.10 12 1.26 21A

SK-19-179 92.00 118.00 26.00 1.26 28 1.64 21A

SK-19-179 121.00 124.00 3.00 1.10 5 1.17 21A

SK-19-180 1.50 4.50 3.00 0.31 71 1.25 21A

SK-19-180 14.50 23.50 9.00 1.81 7 1.90 21A

SK-19-180 26.00 29.50 3.50 1.41 5 1.48 21A

SK-19-180 32.50 40.00 7.50 1.04 64 1.90 21A

SK-19-180 43.00 58.50 15.50 1.69 5 1.76 21A

SK-19-180 62.00 63.50 1.50 0.60 13 0.77 21A

SK-19-180 67.00 78.83 11.83 1.45 9 1.57 21A

SK-19-180 81.50 99.00 17.50 0.90 5 0.96 21A

SK-19-180 104.00 108.00 4.00 1.16 5 1.23 21A

SK-19-180 118.50 124.50 6.00 1.29 97 2.58 21A

SK-19-180 152.00 153.50 1.50 1.06 15 1.26 21A

SK-19-180 169.00 170.00 1.00 1.67 20 1.94 21A

SK-19-181 8.50 10.00 1.50 0.95 5 1.02 21A

SK-19-181 16.82 33.00 16.18 0.88 5 0.94 21A

HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE

SK-19-181 36.00 39.50 3.50 0.68 5 0.75 21A

SK-19-181 42.65 66.00 23.35 1.51 6 1.58 21A

SK-19-181 70.50 104.50 34.00 1.12 20 1.39 21A

SK-19-181 110.00 113.00 3.00 0.64 19 0.89 21A

SK-19-181 125.00 131.00 6.00 1.53 7 1.63 21A

SK-19-181 134.00 139.00 5.00 0.59 12 0.75 21A

SK-19-182 2.00 14.50 12.50 0.90 55 1.64 21A

SK-19-182 37.70 47.16 9.46 0.77 25 1.10 21A

SK-19-182 51.12 63.00 11.88 1.04 6 1.11 21A

SK-19-182 66.00 69.00 3.00 0.79 17 1.01 21A

SK-19-182 73.24 76.24 3.00 0.73 5 0.80 21A

SK-19-183 1.34 17.00 15.66 1.26 54 1.98 21A

SK-19-183 22.50 24.00 1.50 0.20 48 0.84 21A

SK-19-183 41.50 50.00 8.50 2.74 14 2.92 21A

INCLUDING 48.95 50.00 1.05 10.50 28 10.87 21A

SK-19-183 53.15 54.50 1.35 0.83 13 1.00 21A

SK-19-183 59.95 62.40 2.45 0.77 5 0.84 21A

SK-19-183 65.00 71.15 6.15 1.28 17 1.51 21A

SK-19-183 78.50 79.75 1.25 0.88 5 0.95 21A

SK-19-183 90.00 91.50 1.50 1.70 1,195 17.63 21A

SK-19-183 100.00 106.00 6.00 0.72 13 0.88 21A

SK-19-183 118.18 118.68 0.50 0.70 9 0.82 21A

SK-19-184 1.96 13.00 11.04 1.26 144 3.18 21A

INCLUDING 10.00 11.50 1.50 1.68 710 11.15 21A

SK-19-184A 2.05 15.50 13.45 1.06 34 1.51 21A

SK-19-184A 21.53 23.50 1.97 1.02 5 1.09 21A

SK-19-184A 41.00 61.50 20.50 1.05 12 1.21 21A

SK-19-184A 64.50 71.65 7.15 1.05 44 1.63 21A

SK-19-184A 96.30 99.15 2.85 1.42 5 1.48 21A

SK-19-184A 103.50 106.50 3.00 1.56 5 1.63 21A

SK-19-184A 115.38 116.00 0.62 0.77 5 0.84 21A

SK-19-185 1.50 5.00 3.50 2.80 56 3.55 21E

SK-19-186 1.41 8.00 6.59 8.73 27 9.09 21E

INCLUDING 3.81 5.00 1.19 20.70 98 22.01 21E

AND 5.00 6.50 1.50 17.45 13 17.62 21E

SK-19-187 8.50 10.00 1.50 1.15 175 3.48 21E

SK-19-187 31.00 32.00 1.00 1.07 5 1.14 21E

SK-19-188 13.00 14.50 1.50 0.71 5 0.78 21E

SK-19-188 17.17 18.27 1.10 1.48 5 1.55 21E

SK-19-189 19.00 20.00 1.00 0.75 5 0.82 21E

SK-19-189 29.10 37.00 7.90 1.06 7 1.16 21E

SK-19-189 43.00 53.10 10.10 1.13 5 1.19 21E

SK-19-190 31.30 32.50 1.20 0.65 8 0.76 21E

SK-19-190 37.00 45.50 8.50 1.13 8 1.24 21E

SK-19-191 15.48 15.98 0.50 0.89 5 0.96 21E

SK-19-191 20.00 29.50 9.50 1.71 27 2.06 21E

SK-19-191 41.50 43.00 1.50 0.80 5 0.87 21E

SK-19-192 6.00 7.50 1.50 0.81 8 0.92 21E

SK-19-192 14.40 15.60 1.20 0.73 5 0.79 21E

SK-19-192 24.00 31.74 7.74 1.48 40 2.02 21E

SK-19-192 41.50 42.64 1.14 0.72 5 0.79 21E

SK-19-193 5.50 8.00 2.50 0.76 6 0.84 21E

SK-19-193 13.00 14.25 1.25 1.60 5 1.66 21E

SK-19-193 18.00 43.50 25.50 1.76 21 2.04 21E

SK-19-194 0.87 2.50 1.63 2.77 18 3.01 21E

HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE

SK-19-194 10.00 14.50 4.50 1.23 16 1.44 21E

SK-19-194A 11.50 19.50 8.00 1.07 16 1.28 21E

SK-19-194A 29.00 31.50 2.50 3.95 5 4.02 21E

SK-19-195 8.00 14.37 6.37 1.51 50 2.18 21E

SK-19-195 17.00 18.38 1.38 0.53 13 0.70 21E

SK-19-195 52.00 56.00 4.00 2.32 5 2.38 21E

SK-19-196 2.93 5.90 2.97 0.90 5 0.97 21E

SK-19-196 11.72 14.00 2.28 1.59 20 1.86 21E

SK-19-196 17.67 22.00 4.33 2.66 116 4.20 21E

SK-19-197 8.00 10.79 2.79 0.73 10 0.86 21E

SK-19-198 11.00 12.50 1.50 25.80 94 27.05 21E

SK-19-198A 8.00 9.80 1.80 1.12 7 1.21 21E

SK-19-199 6.02 7.67 1.65 1.24 5 1.31 21E

SK-19-200 5.75 7.25 1.50 0.74 5 0.81 21E

SK-19-200 59.50 67.00 7.50 0.66 10 0.79 21E

SK-19-201 28.00 30.58 2.58 1.61 7 1.70 21E

SK-19-201 42.50 63.50 21.00 1.51 355 6.24 21E

INCLUDING 43.60 45.00 1.40 2.17 1,550 22.84 21E

AND 54.90 55.40 0.50 4.24 4,470 63.84 21E

SK-19-201 66.50 71.00 4.50 1.37 5 1.44 21E

SK-19-202 32.00 33.50 1.50 0.55 69 1.47 21E

SK-19-202 36.00 37.75 1.75 1.18 5 1.25 21E

SK-19-202 42.22 63.00 20.78 1.21 18 1.44 21E

SK-19-202 69.00 70.46 1.46 0.84 40 1.37 21E

SK-19-203 ABANDONED 21E

SK-19-203A 7.00 8.00 1.00 0.92 5 0.99 21E

SK-19-203A 34.00 34.50 0.50 1.11 9 1.23 21E

SK-19-203A 37.00 38.16 1.16 1.02 6 1.10 21E

SK-19-203A 46.50 54.50 8.00 0.82 7 0.91 21E

SK-19-203A 61.00 61.84 0.84 0.70 5 0.77 21E

SK-19-204 28.00 31.00 3.00 2.74 5 2.81 21E

SK-19-204 33.73 34.43 0.70 1.31 5 1.38 21E

SK-19-204 37.25 43.00 5.75 1.31 15 1.51 21E

SK-19-204 46.00 49.00 3.00 0.88 5 0.95 21E

SK-19-204 54.50 57.69 3.19 1.46 5 1.53 21E

SK-19-204 60.50 62.00 1.50 1.10 5 1.17 21E

SK-19-205 23.50 28.00 4.50 1.17 5 1.24 21E

SK-19-205 33.72 36.00 2.28 0.75 14 0.94 21E

SK-19-205 41.10 51.35 10.25 2.78 15 2.98 21E

SK-19-206 8.00 9.50 1.50 0.35 6 0.43 21E

SK-19-207 5.00 6.00 1.00 0.30 23 0.61 21E

SK-19-208 1.90 9.50 7.60 0.64 104 2.03 21E

SK-19-208 12.50 25.00 12.50 0.64 31 1.05 21E

SK-19-208 37.00 62.00 25.00 2.83 44 3.42 21E

SK-19-209 2.00 10.50 8.50 0.64 215 3.50 21E

INCLUDING 4.00 4.50 0.50 1.59 1,620 23.19 21E

SK-19-209 14.00 19.50 5.50 2.35 159 4.47 21E

INCLUDING 14.85 15.35 0.50 13.65 621 21.93 21E

SK-19-209 22.50 24.98 2.48 0.75 13 0.91 21E

SK-19-209 40.00 45.00 5.00 2.01 158 4.11 21E

INCLUDING 44.00 45.00 1.00 2.81 554 10.20 21E

SK-19-209 52.05 53.50 1.45 2.59 5 2.66 21E

SK-19-210 14.30 17.00 2.70 4.51 114 6.02 21E

SK-19-210 30.00 39.50 9.50 0.88 48 1.53 21E

SK-19-210 42.90 44.00 1.10 0.85 205 3.58 21E

HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE

SK-19-211 14.00 17.30 3.30 4.39 105 5.79 21E

SK-19-211 26.50 41.50 15.00 1.06 60 1.86 21E

SK-19-211 65.50 91.00 25.50 1.31 12 1.46 21E

SK-19-212 7.38 14.00 6.62 3.68 35 4.15 21E

SK-19-212A 4.25 20.00 15.75 2.06 26 2.40 21E

SK-19-213 7.14 20.32 13.18 1.36 29 1.75 21E

SK-19-213 22.43 23.45 1.02 1.00 17 1.23 21E

SK-19-213 31.94 35.00 3.06 1.34 35 1.81 21E

SK-19-214 6.24 20.40 14.16 3.67 25 4.00 21E

SK-19-214 24.08 34.50 10.42 0.88 17 1.11 21E

Gold Equivalent (AuEq) calculated via the formula: Au ( g/t) + [Ag ( g/t) / 7 5]. Reported core lengths represent 80 -100% of true widths and are

supported by well -defined mineralization geometries derived from historical drilling. Length weighted AuE q composites were constrained by

geological considerations. Grade capping of individual assays has not been applied to the Au and Ag assays informing the length weighted AuE q

composites. Processing recoveries have not been applied to the AuEq calculation and are disclosed at 100%. Samples below detection limit were

nulled to a value of zero.

Table 2: Mine grid Phase I drill hole locations and orientations:

HOLE-ID EASTING NORTHING ELEVATION LENGTH (m) AZIMUTH DIP

SK-19-096 9904.0 9951.0 992.8 45.0 286.0 -45.0

SK-19-100 9973.0 10139.0 972.6 41.4 73.2 -59.8

SK-19-101 9973.0 10139.0 972.6 42.0 130.4 -65.5

SK-19-128 10086.0 10527.0 941.0 36.0 161.6 -60.3

SK-19-130 10086.0 10527.0 941.0 40.0 210.7 -55.1

SK-19-133 9925.1 10847.4 874.1 25.0 181.3 -50.4

SK-19-144 9933.1 10744.1 909.8 44.0 188.7 -65.7

SK-19-150 9709.7 10093.7 1019.8 86.0 187.6 -53.0

SK-19-155 9765.3 9994.8 1039.8 95.0 73.2 -85.4

SK-19-158 9763.8 9996.1 1040.8 86.0 273.6 -75.5

SK-19-162 9796.4 10027.9 1043.1 107.0 278.2 -72.0

SK-19-165 9871.3 10116.9 1031.0 11.0 126.7 -57.7

SK-19-165A 9871.3 10116.9 1031.0 25.4 133.0 -57.4

SK-19-165B 9871.3 10116.9 1031.0 110.0 131.6 -57.3

SK-19-168 9905.7 10160.8 1030.1 29.0 106.2 -49.5

SK-19-168A 9905.7 10160.8 1030.1 122.0 105.5 -52.0

SK-19-171 9883.2 10165.3 1034.8 66.0 106.4 -62.4

SK-19-171A 9883.2 10165.3 1034.8 137.0 102.7 -63.3

SK-19-172 9883.0 10164.5 1035.3 146.0 119.2 -52.7

SK-19-173 9893.6 10198.7 1034.8 23.0 107.8 -65.4

SK-19-173A 9893.6 10198.7 1034.8 125.0 115.7 -65.7

SK-19-174 9894.1 10198.4 1034.5 125.0 112.3 -56.2

SK-19-175 9876.9 9909.0 1023.2 65.0 281.4 -88.1

SK-19-176 9871.2 9896.3 1022.4 45.2 178.9 -66.0

SK-19-177 9870.7 9895.9 1021.8 45.0 0.0 -90.0

SK-19-178 9860.3 9891.2 1018.5 146.0 289.0 -85.2

SK-19-179 9859.9 9891.4 1022.1 155.0 316.9 -78.0

SK-19-180 9859.7 9938.1 1024.7 171.7 246.5 -89.8

SK-19-181 9860.4 9937.7 1026.3 155.0 146.8 -82.0

SK-19-182 9861.5 9874.6 1021.2 137.0 59.0 -85.8

SK-19-183 9858.5 9874.6 1026.6 122.0 288.8 -85.7

SK-19-184 9860.0 9874.6 1020.5 20.0 205.1 -82.0

SK-19-184A 9860.0 9874.6 1020.5 116.0 190.8 -82.8

SK-19-185 10136.0 10246.7 974.7 35.0 72.1 -53.0

SK-19-186 10135.1 10246.0 975.0 35.0 174.1 -86.2

SK-19-187 10135.4 10276.0 983.3 32.0 239.0 -89.4

HOLE-ID EASTING NORTHING ELEVATION LENGTH (m) AZIMUTH DIP

SK-19-188 10145.5 10267.4 982.8 50.0 185.3 -64.7

SK-19-189 10102.8 10252.5 968.2 56.0 229.5 -59.8

SK-19-190 10103.9 10251.5 966.3 65.0 261.0 -72.1

SK-19-191 10103.9 10251.5 966.3 56.0 185.3 -72.4

SK-19-192 10106.1 10250.3 965.7 62.0 186.0 -54.0

SK-19-193 10104.7 10251.6 965.7 50.0 144.9 -53.2

SK-19-194 10151.4 10318.9 983.1 16.0 215.7 -79.8

SK-19-194A 10151.4 10318.7 983.4 47.0 226.4 -78.9

SK-19-195 10150.7 10318.7 983.3 56.0 226.5 -62.2

SK-19-196 10151.3 10318.7 982.7 50.0 174.3 -64.0

SK-19-197 10152.6 10318.6 982.8 53.0 121.2 -71.6

SK-19-198 10152.7 10318.2 982.6 14.0 45.0 -80.0

SK-19-198A 10152.7 10318.2 982.6 56.0 61.9 -80.0

SK-19-199 10152.4 10319.4 981.9 56.0 45.5 -61.1

SK-19-200 10079.8 10263.8 966.1 77.0 39.7 -81.4

SK-19-201 10082.8 10261.9 969.3 77.0 58.5 -61.1

SK-19-202 10082.8 10261.6 969.6 77.0 61.1 -72.6

SK-19-203 10082.3 10262.4 968.4 14.0 83.2 -80.1

SK-19-203A 10082.3 10262.4 968.4 71.0 85.7 -79.2

SK-19-204 10082.7 10260.3 969.8 68.0 86.0 -64.8

SK-19-205 10083.4 10260.1 969.1 65.0 82.4 -50.5

SK-19-206 10145.5 10267.4 982.8 50.0 277.9 -88.5

SK-19-207 10147.3 10267.0 981.8 47.0 129.6 -66.3

SK-19-208 10119.8 10303.5 979.5 62.0 150.9 -67.0

SK-19-209 10119.9 10303.5 980.9 65.0 149.0 -51.4

SK-19-210 10077.8 10286.2 977.7 86.0 54.0 -81.5

SK-19-211 10078.5 10285.6 977.7 92.0 57.5 -74.4

SK-19-212 10134.8 10336.7 983.7 14.0 38.8 -67.6

SK-19-212A 10134.8 10336.7 983.7 41.0 25.4 -71.0

SK-19-213 10134.2 10336.8 984.2 35.0 255.7 -51.8

SK-19-214 10134.4 10337.1 985.2 41.0 320.3 -79.8