Skeena Intersects 14.82 g/t AuEq over 31.30 metres at Eskay Creek
Skeena Intersects 14.82 g/t AuEq over 31.30 metres at Eskay Creek
Vancouver, BC (February 11, 2020) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF)
(“Skeena” or the “Company”) is pleased to announce additional gold-silver drill results from the
2019 Phase I surface drilling program at the Eskay Creek Project (“Eskay Creek”) located in the
Golden Triangle of British Columbia. Four surface drill rigs were utilized for the 2019 Phase I program
in the 21A, 21 E and HW Zones to infill and upgrade areas of Inferred resources to the Indicated
classification. Drill hole results reported in this release are from the 21 A, 21E and HW Zones.
Reference images are presented at the end of this release as well as on the Company’s website.
Phase I Eskay Creek Drilling Highlights:
• 11.53 g/t Au, 247 g/t Ag (14.82 g/t AuEq) over 31.30 m (SK-19-172) - 21A Zone
• 15.02 g/t Au, 70 g/t Ag (15.96 g/t AuEq) over 18.26 m (SK-19-171A) - 21A Zone
• 1.51 g/t Au, 355 g/t Ag (6.24 g/t AuEq) over 21.00 m (SK-19-201) - 21E Zone
• 2.83 g/t Au, 44 g/t Ag (3.42 g/t AuEq) over 25.00 m (SK-19-208) - 21E Zone
Gold Equivalent (AuE q) calculated via the formula: Au (g/t) + [Ag ( g/t) / 7 5]. Reported core lengths represent 80 -100% of true widths and are
supported by well-defined mineralization geometries derived from historical drilling. Grade capping of individual assays has not been applied to the
Au and Ag assays informing the length weighted AuEq composites. Processing recoveries have not been applied to the AuEq calculation and are
disclosed at 100%. Samples below detection limit are nulled to a value of zero.
2019 Drilling Continues to Intersect Increased Grades, While Confirming Widths
Infill drilling within the 21A Zone continues to improve upon historically defined grades as
demonstrated by 2019 Phase I drill hole SK -19-172 which intersected 14.82 g/t AuEq over 31.30
metres. This drilling confirms the 21A Zone thickness as indicated by the nearest historical drill hole
in the current mineral resource model which is located 20 metres down-dip and intersected slightly
lower grade mineralization of 7.63 g/t AuEq over 26.90 metres (CA89-080).
Likewise, additional up-dip confirmation was provided by drill hole SK-19-061 which averaged 10.56
g/t AuEq over 27.50 metres and correlates very well with previously reported thickness from 2018
Phase I drill hole SK-18-023 that intersected 14.57 g/t AuEq over 31.50 metres.
Mineralization within this portion of the 21A Zone is dominantly hosted within the footwall rhyolite
sequence with only a minor contribution from the mudstones (refer to attached section).
Current Status - Eskay Creek Drilling
Four surface-based drill rigs are currently on site at Eskay Creek. The Company anticipates
commencement of the surface 2020 Phase I infill and exploration drilling program in mid-February
2020. The remaining analytical results from the 2019 Phase I drilling program will be disclosed once
all information has been received and validated.
NR: 20-05
February 11, 2020
About Skeena
Skeena Resources Limited is a junior Canadian mining exploration company focused on developing
prospective precious metal properties in the Golden Triangle of northwest British Columbia, Canada.
The Company’s primary activities are the exploration and development of the past -producing Eskay
Creek mine, which contains a combined Indicated and Inferred 4Moz, 4.4 g/t gold-equivalent open-pit
resource. The Company recently completed a Preliminary Economic Assessment (PEA) on Eskay
Creek which highlights an after -tax NPV5% of C$638M, 51% IRR and a 1.2-year payback. Skeena is
also exploring the past-producing Snip gold mine.
On behalf of the Board of Directors of Skeena Resources Limited,
Walter Coles Jr.
President & CEO
Qualified Persons
Exploration activities at the Eskay Creek Project are administered on site by the Company’s
Exploration Managers, Colin Russell, P.Geo. and Adrian Newton, P.Geo. In accordance with National
Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President
Exploration and Resource Development, is the Qualified Person for the Company and has prepared,
validated and approved the technical and scientific content of this news release. The Company strictly
adheres to CIM Best Prac tices Guidelines in conducting, documenting, and reporting its exploration
activities on its exploration projects.
Quality Assurance – Quality Control
Once received from the drill and processed, all drill core samples are sawn in half, labelled and
bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are
applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC)
samples at regular intervals in the sample stream, including blanks and reference materials with all
sample shipments to monitor laboratory performance. The QAQC program was designed and
approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s
Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.
Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British
Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 sta ndard
for gold assays and all analytical methods include quality control materials at set frequencies with
established data acceptance criteria. The entire sample is crushed and 1kg is pulverized. Analysis for
gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and
upper limit of 100 ppm. Samples with gold assays greater than 100ppm are re -analyzed using a 50g
fire assay fusion with gravimetric finish. Analysis for silver is by 50g fire assay fusion with gravi metric
finish with a lower limit of 5ppm and upper limit of 10,000ppm. Samples with silver assays greater than
10,000ppm are re -analyzed using a gravimetric silver concentrate method. A selected number of
samples are also analyzed using a 48 multi -elemental geochemical package by a 4 -acid digestion,
followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP -AES) and Inductively
Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with
Inductively Coupled Pl asma Atomic Emission Spectroscopy (ICP -AES) finish. Samples with sulfur
reporting greater than 10% from the multi -element analysis are re -analyzed for total sulfur by Leco
furnace and infrared spectroscopy.
Cautionary note regarding forward-looking statements
Certain statements made and information contained herein may constitute “forward looking information” and “forward
looking statements” within the meaning of applicable Canadian and United States securities legislation. These statements
and information are based on facts currently available to the Company and there is no assurance that actual results will
meet management’s expectations. Forward -looking statements and information may be identified by such terms as
“anticipates”, “believes”, “ targets”, “estimates”, “plans”, “expects”, “may”, “will”, “could” or “would”. Forward -looking
statements and information contained herein are based on certain factors and assumptions regarding, among other things,
the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation,
the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of
financing, the receipt of regulatory approvals, en vironmental risks, title disputes and other matters. While the Company
considers its assumptions to be reasonable as of the date hereof, forward -looking statements and information are not
guarantees of future performance and readers should not place undue importance on such statements as actual events
and results may differ materially from those described herein. The Company does not undertake to update any forward -
looking statements or information except as may be required by applicable securities laws.
Neither TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for
the adequacy or accuracy of this release.
Table 1: Eskay Creek Project 2019 Phase I length weighted drill hole gold and silver composites:
HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE
SK-19-096 4.70 5.50 0.80 0.49 47 1.12 21A
SK-19-096 32.50 33.00 0.50 0.61 18 0.85 21A
SK-19-100 ASSAYS PENDING
SK-19-101 22.16 22.70 0.54 1.28 5 1.35 21A
SK-19-128 ASSAYS PENDING
SK-19-130 ASSAYS PENDING
SK-19-133 1.40 3.35 0.03 <5 0.03 HW
SK-19-144 28.00 30.00 0.20 8 0.31 HW
SK-19-150 69.72 70.75 1.03 4.09 5 4.16 21A
SK-19-155 67.00 69.55 2.55 2.51 9 2.63 21A
SK-19-158 64.84 66.70 1.86 2.12 6 2.20 21A
SK-19-162 92.00 93.00 0.24 31 0.65 21A
SK-19-165 ABANDONED 21A
SK-19-165A ABANDONED 21A
SK-19-165B 80.40 82.40 2.00 2.25 63 3.08 21A
SK-19-165B 87.77 100.55 12.78 2.34 5 2.41 21A
SK-19-165B 108.00 110.00 2.00 1.98 78 3.01 21A
SK-19-168 ABANDONED 21A
SK-19-168A 90.50 102.00 11.50 4.96 107 6.38 21A
SK-19-168A 108.50 113.00 4.50 1.10 5 1.17 21A
SK-19-171 ABANDONED 21A
SK-19-171A 98.24 116.50 18.26 15.02 70 15.96 21A
INCLUDING 100.30 101.50 1.20 13.25 <5 13.25 21A
AND 101.50 102.00 0.50 19.20 <5 19.20 21A
AND 104.50 106.00 1.50 10.05 61 10.86 21A
AND 106.00 107.50 1.50 41.50 200 44.17 21A
AND 107.50 109.00 1.50 26.90 288 30.74 21A
AND 109.00 110.50 1.50 14.30 224 17.29 21A
AND 110.50 112.00 1.50 24.80 5 24.87 21A
HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE
AND 112.00 113.00 1.00 15.45 8 15.56 21A
SK-19-171A 132.50 137.00 4.50 1.01 14 1.20 21A
SK-19-172 91.50 122.80 31.30 11.53 247 14.82 21A
INCLUDING 92.15 92.65 0.50 10.10 109 11.55 21A
AND 92.65 93.15 0.50 92.80 1,105 107.53 21A
AND 93.15 94.00 0.85 140.00 981 153.08 21A
AND 94.00 94.51 0.51 141.50 380 146.57 21A
AND 94.51 95.15 0.64 22.60 2,230 52.33 21A
AND 95.15 95.90 0.75 21.30 1,110 36.10 21A
AND 95.90 96.40 0.50 18.85 906 30.93 21A
AND 96.40 96.90 0.50 19.30 2,610 54.10 21A
AND 113.65 114.98 1.33 9.42 186 11.90 21A
SK-19-172 132.50 133.36 0.86 0.72 5 0.79 21A
SK-19-172 140.00 141.00 1.00 1.11 5 1.18 21A
SK-19-173 ABANDONED 21A
SK-19-173A 94.80 95.86 1.06 0.61 8 0.72 21A
SK-19-173A 98.65 101.00 2.35 2.62 5 2.68 21A
SK-19-174 91.48 102.05 10.57 3.36 9 3.48 21A
INCLUDING 95.00 96.00 1.00 12.65 <5 12.65 21A
SK-19-174 117.00 118.10 1.10 0.97 5 1.04 21A
SK-19-175 2.50 22.50 20.00 0.90 6 0.98 21A
SK-19-175 28.00 53.85 25.85 1.87 9 1.99 21A
SK-19-175 56.50 64.00 7.50 1.01 6 1.09 21A
SK-19-176 12.00 22.00 10.00 1.01 15 1.21 21A
SK-19-176 29.50 37.16 7.66 1.09 6 1.17 21A
SK-19-176 43.47 45.20 1.73 0.74 10 0.87 21A
SK-19-177 7.50 25.00 17.50 1.00 8 1.11 21A
SK-19-177 28.00 45.00 17.00 1.03 14 1.21 21A
SK-19-178 5.00 30.75 25.75 1.40 20 1.66 21A
SK-19-178 33.75 36.00 2.25 1.04 5 1.11 21A
SK-19-178 42.00 48.50 6.50 0.94 63 1.78 21A
SK-19-178 53.00 69.90 16.90 0.78 35 1.25 21A
SK-19-178 83.00 104.50 21.50 2.04 7 2.13 21A
SK-19-178 109.00 110.50 1.50 1.31 5 1.38 21A
SK-19-178 115.00 116.50 1.50 0.79 5 0.86 21A
SK-19-178 124.03 128.35 4.32 1.64 64 2.49 21A
SK-19-179 4.75 35.00 30.25 1.12 22 1.41 21A
SK-19-179 41.00 42.50 1.50 0.61 65 1.48 21A
SK-19-179 47.00 89.00 42.00 1.10 12 1.26 21A
SK-19-179 92.00 118.00 26.00 1.26 28 1.64 21A
SK-19-179 121.00 124.00 3.00 1.10 5 1.17 21A
SK-19-180 1.50 4.50 3.00 0.31 71 1.25 21A
SK-19-180 14.50 23.50 9.00 1.81 7 1.90 21A
SK-19-180 26.00 29.50 3.50 1.41 5 1.48 21A
SK-19-180 32.50 40.00 7.50 1.04 64 1.90 21A
SK-19-180 43.00 58.50 15.50 1.69 5 1.76 21A
SK-19-180 62.00 63.50 1.50 0.60 13 0.77 21A
SK-19-180 67.00 78.83 11.83 1.45 9 1.57 21A
SK-19-180 81.50 99.00 17.50 0.90 5 0.96 21A
SK-19-180 104.00 108.00 4.00 1.16 5 1.23 21A
SK-19-180 118.50 124.50 6.00 1.29 97 2.58 21A
SK-19-180 152.00 153.50 1.50 1.06 15 1.26 21A
SK-19-180 169.00 170.00 1.00 1.67 20 1.94 21A
SK-19-181 8.50 10.00 1.50 0.95 5 1.02 21A
SK-19-181 16.82 33.00 16.18 0.88 5 0.94 21A
HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE
SK-19-181 36.00 39.50 3.50 0.68 5 0.75 21A
SK-19-181 42.65 66.00 23.35 1.51 6 1.58 21A
SK-19-181 70.50 104.50 34.00 1.12 20 1.39 21A
SK-19-181 110.00 113.00 3.00 0.64 19 0.89 21A
SK-19-181 125.00 131.00 6.00 1.53 7 1.63 21A
SK-19-181 134.00 139.00 5.00 0.59 12 0.75 21A
SK-19-182 2.00 14.50 12.50 0.90 55 1.64 21A
SK-19-182 37.70 47.16 9.46 0.77 25 1.10 21A
SK-19-182 51.12 63.00 11.88 1.04 6 1.11 21A
SK-19-182 66.00 69.00 3.00 0.79 17 1.01 21A
SK-19-182 73.24 76.24 3.00 0.73 5 0.80 21A
SK-19-183 1.34 17.00 15.66 1.26 54 1.98 21A
SK-19-183 22.50 24.00 1.50 0.20 48 0.84 21A
SK-19-183 41.50 50.00 8.50 2.74 14 2.92 21A
INCLUDING 48.95 50.00 1.05 10.50 28 10.87 21A
SK-19-183 53.15 54.50 1.35 0.83 13 1.00 21A
SK-19-183 59.95 62.40 2.45 0.77 5 0.84 21A
SK-19-183 65.00 71.15 6.15 1.28 17 1.51 21A
SK-19-183 78.50 79.75 1.25 0.88 5 0.95 21A
SK-19-183 90.00 91.50 1.50 1.70 1,195 17.63 21A
SK-19-183 100.00 106.00 6.00 0.72 13 0.88 21A
SK-19-183 118.18 118.68 0.50 0.70 9 0.82 21A
SK-19-184 1.96 13.00 11.04 1.26 144 3.18 21A
INCLUDING 10.00 11.50 1.50 1.68 710 11.15 21A
SK-19-184A 2.05 15.50 13.45 1.06 34 1.51 21A
SK-19-184A 21.53 23.50 1.97 1.02 5 1.09 21A
SK-19-184A 41.00 61.50 20.50 1.05 12 1.21 21A
SK-19-184A 64.50 71.65 7.15 1.05 44 1.63 21A
SK-19-184A 96.30 99.15 2.85 1.42 5 1.48 21A
SK-19-184A 103.50 106.50 3.00 1.56 5 1.63 21A
SK-19-184A 115.38 116.00 0.62 0.77 5 0.84 21A
SK-19-185 1.50 5.00 3.50 2.80 56 3.55 21E
SK-19-186 1.41 8.00 6.59 8.73 27 9.09 21E
INCLUDING 3.81 5.00 1.19 20.70 98 22.01 21E
AND 5.00 6.50 1.50 17.45 13 17.62 21E
SK-19-187 8.50 10.00 1.50 1.15 175 3.48 21E
SK-19-187 31.00 32.00 1.00 1.07 5 1.14 21E
SK-19-188 13.00 14.50 1.50 0.71 5 0.78 21E
SK-19-188 17.17 18.27 1.10 1.48 5 1.55 21E
SK-19-189 19.00 20.00 1.00 0.75 5 0.82 21E
SK-19-189 29.10 37.00 7.90 1.06 7 1.16 21E
SK-19-189 43.00 53.10 10.10 1.13 5 1.19 21E
SK-19-190 31.30 32.50 1.20 0.65 8 0.76 21E
SK-19-190 37.00 45.50 8.50 1.13 8 1.24 21E
SK-19-191 15.48 15.98 0.50 0.89 5 0.96 21E
SK-19-191 20.00 29.50 9.50 1.71 27 2.06 21E
SK-19-191 41.50 43.00 1.50 0.80 5 0.87 21E
SK-19-192 6.00 7.50 1.50 0.81 8 0.92 21E
SK-19-192 14.40 15.60 1.20 0.73 5 0.79 21E
SK-19-192 24.00 31.74 7.74 1.48 40 2.02 21E
SK-19-192 41.50 42.64 1.14 0.72 5 0.79 21E
SK-19-193 5.50 8.00 2.50 0.76 6 0.84 21E
SK-19-193 13.00 14.25 1.25 1.60 5 1.66 21E
SK-19-193 18.00 43.50 25.50 1.76 21 2.04 21E
SK-19-194 0.87 2.50 1.63 2.77 18 3.01 21E
HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE
SK-19-194 10.00 14.50 4.50 1.23 16 1.44 21E
SK-19-194A 11.50 19.50 8.00 1.07 16 1.28 21E
SK-19-194A 29.00 31.50 2.50 3.95 5 4.02 21E
SK-19-195 8.00 14.37 6.37 1.51 50 2.18 21E
SK-19-195 17.00 18.38 1.38 0.53 13 0.70 21E
SK-19-195 52.00 56.00 4.00 2.32 5 2.38 21E
SK-19-196 2.93 5.90 2.97 0.90 5 0.97 21E
SK-19-196 11.72 14.00 2.28 1.59 20 1.86 21E
SK-19-196 17.67 22.00 4.33 2.66 116 4.20 21E
SK-19-197 8.00 10.79 2.79 0.73 10 0.86 21E
SK-19-198 11.00 12.50 1.50 25.80 94 27.05 21E
SK-19-198A 8.00 9.80 1.80 1.12 7 1.21 21E
SK-19-199 6.02 7.67 1.65 1.24 5 1.31 21E
SK-19-200 5.75 7.25 1.50 0.74 5 0.81 21E
SK-19-200 59.50 67.00 7.50 0.66 10 0.79 21E
SK-19-201 28.00 30.58 2.58 1.61 7 1.70 21E
SK-19-201 42.50 63.50 21.00 1.51 355 6.24 21E
INCLUDING 43.60 45.00 1.40 2.17 1,550 22.84 21E
AND 54.90 55.40 0.50 4.24 4,470 63.84 21E
SK-19-201 66.50 71.00 4.50 1.37 5 1.44 21E
SK-19-202 32.00 33.50 1.50 0.55 69 1.47 21E
SK-19-202 36.00 37.75 1.75 1.18 5 1.25 21E
SK-19-202 42.22 63.00 20.78 1.21 18 1.44 21E
SK-19-202 69.00 70.46 1.46 0.84 40 1.37 21E
SK-19-203 ABANDONED 21E
SK-19-203A 7.00 8.00 1.00 0.92 5 0.99 21E
SK-19-203A 34.00 34.50 0.50 1.11 9 1.23 21E
SK-19-203A 37.00 38.16 1.16 1.02 6 1.10 21E
SK-19-203A 46.50 54.50 8.00 0.82 7 0.91 21E
SK-19-203A 61.00 61.84 0.84 0.70 5 0.77 21E
SK-19-204 28.00 31.00 3.00 2.74 5 2.81 21E
SK-19-204 33.73 34.43 0.70 1.31 5 1.38 21E
SK-19-204 37.25 43.00 5.75 1.31 15 1.51 21E
SK-19-204 46.00 49.00 3.00 0.88 5 0.95 21E
SK-19-204 54.50 57.69 3.19 1.46 5 1.53 21E
SK-19-204 60.50 62.00 1.50 1.10 5 1.17 21E
SK-19-205 23.50 28.00 4.50 1.17 5 1.24 21E
SK-19-205 33.72 36.00 2.28 0.75 14 0.94 21E
SK-19-205 41.10 51.35 10.25 2.78 15 2.98 21E
SK-19-206 8.00 9.50 1.50 0.35 6 0.43 21E
SK-19-207 5.00 6.00 1.00 0.30 23 0.61 21E
SK-19-208 1.90 9.50 7.60 0.64 104 2.03 21E
SK-19-208 12.50 25.00 12.50 0.64 31 1.05 21E
SK-19-208 37.00 62.00 25.00 2.83 44 3.42 21E
SK-19-209 2.00 10.50 8.50 0.64 215 3.50 21E
INCLUDING 4.00 4.50 0.50 1.59 1,620 23.19 21E
SK-19-209 14.00 19.50 5.50 2.35 159 4.47 21E
INCLUDING 14.85 15.35 0.50 13.65 621 21.93 21E
SK-19-209 22.50 24.98 2.48 0.75 13 0.91 21E
SK-19-209 40.00 45.00 5.00 2.01 158 4.11 21E
INCLUDING 44.00 45.00 1.00 2.81 554 10.20 21E
SK-19-209 52.05 53.50 1.45 2.59 5 2.66 21E
SK-19-210 14.30 17.00 2.70 4.51 114 6.02 21E
SK-19-210 30.00 39.50 9.50 0.88 48 1.53 21E
SK-19-210 42.90 44.00 1.10 0.85 205 3.58 21E
HOLE-ID FROM (m) TO (m) CORE LENGTH (m) AU (g/t) AG (g/t) AUEQ (g/t) ZONE
SK-19-211 14.00 17.30 3.30 4.39 105 5.79 21E
SK-19-211 26.50 41.50 15.00 1.06 60 1.86 21E
SK-19-211 65.50 91.00 25.50 1.31 12 1.46 21E
SK-19-212 7.38 14.00 6.62 3.68 35 4.15 21E
SK-19-212A 4.25 20.00 15.75 2.06 26 2.40 21E
SK-19-213 7.14 20.32 13.18 1.36 29 1.75 21E
SK-19-213 22.43 23.45 1.02 1.00 17 1.23 21E
SK-19-213 31.94 35.00 3.06 1.34 35 1.81 21E
SK-19-214 6.24 20.40 14.16 3.67 25 4.00 21E
SK-19-214 24.08 34.50 10.42 0.88 17 1.11 21E
Gold Equivalent (AuEq) calculated via the formula: Au ( g/t) + [Ag ( g/t) / 7 5]. Reported core lengths represent 80 -100% of true widths and are
supported by well -defined mineralization geometries derived from historical drilling. Length weighted AuE q composites were constrained by
geological considerations. Grade capping of individual assays has not been applied to the Au and Ag assays informing the length weighted AuE q
composites. Processing recoveries have not been applied to the AuEq calculation and are disclosed at 100%. Samples below detection limit were
nulled to a value of zero.
Table 2: Mine grid Phase I drill hole locations and orientations:
HOLE-ID EASTING NORTHING ELEVATION LENGTH (m) AZIMUTH DIP
SK-19-096 9904.0 9951.0 992.8 45.0 286.0 -45.0
SK-19-100 9973.0 10139.0 972.6 41.4 73.2 -59.8
SK-19-101 9973.0 10139.0 972.6 42.0 130.4 -65.5
SK-19-128 10086.0 10527.0 941.0 36.0 161.6 -60.3
SK-19-130 10086.0 10527.0 941.0 40.0 210.7 -55.1
SK-19-133 9925.1 10847.4 874.1 25.0 181.3 -50.4
SK-19-144 9933.1 10744.1 909.8 44.0 188.7 -65.7
SK-19-150 9709.7 10093.7 1019.8 86.0 187.6 -53.0
SK-19-155 9765.3 9994.8 1039.8 95.0 73.2 -85.4
SK-19-158 9763.8 9996.1 1040.8 86.0 273.6 -75.5
SK-19-162 9796.4 10027.9 1043.1 107.0 278.2 -72.0
SK-19-165 9871.3 10116.9 1031.0 11.0 126.7 -57.7
SK-19-165A 9871.3 10116.9 1031.0 25.4 133.0 -57.4
SK-19-165B 9871.3 10116.9 1031.0 110.0 131.6 -57.3
SK-19-168 9905.7 10160.8 1030.1 29.0 106.2 -49.5
SK-19-168A 9905.7 10160.8 1030.1 122.0 105.5 -52.0
SK-19-171 9883.2 10165.3 1034.8 66.0 106.4 -62.4
SK-19-171A 9883.2 10165.3 1034.8 137.0 102.7 -63.3
SK-19-172 9883.0 10164.5 1035.3 146.0 119.2 -52.7
SK-19-173 9893.6 10198.7 1034.8 23.0 107.8 -65.4
SK-19-173A 9893.6 10198.7 1034.8 125.0 115.7 -65.7
SK-19-174 9894.1 10198.4 1034.5 125.0 112.3 -56.2
SK-19-175 9876.9 9909.0 1023.2 65.0 281.4 -88.1
SK-19-176 9871.2 9896.3 1022.4 45.2 178.9 -66.0
SK-19-177 9870.7 9895.9 1021.8 45.0 0.0 -90.0
SK-19-178 9860.3 9891.2 1018.5 146.0 289.0 -85.2
SK-19-179 9859.9 9891.4 1022.1 155.0 316.9 -78.0
SK-19-180 9859.7 9938.1 1024.7 171.7 246.5 -89.8
SK-19-181 9860.4 9937.7 1026.3 155.0 146.8 -82.0
SK-19-182 9861.5 9874.6 1021.2 137.0 59.0 -85.8
SK-19-183 9858.5 9874.6 1026.6 122.0 288.8 -85.7
SK-19-184 9860.0 9874.6 1020.5 20.0 205.1 -82.0
SK-19-184A 9860.0 9874.6 1020.5 116.0 190.8 -82.8
SK-19-185 10136.0 10246.7 974.7 35.0 72.1 -53.0
SK-19-186 10135.1 10246.0 975.0 35.0 174.1 -86.2
SK-19-187 10135.4 10276.0 983.3 32.0 239.0 -89.4
HOLE-ID EASTING NORTHING ELEVATION LENGTH (m) AZIMUTH DIP
SK-19-188 10145.5 10267.4 982.8 50.0 185.3 -64.7
SK-19-189 10102.8 10252.5 968.2 56.0 229.5 -59.8
SK-19-190 10103.9 10251.5 966.3 65.0 261.0 -72.1
SK-19-191 10103.9 10251.5 966.3 56.0 185.3 -72.4
SK-19-192 10106.1 10250.3 965.7 62.0 186.0 -54.0
SK-19-193 10104.7 10251.6 965.7 50.0 144.9 -53.2
SK-19-194 10151.4 10318.9 983.1 16.0 215.7 -79.8
SK-19-194A 10151.4 10318.7 983.4 47.0 226.4 -78.9
SK-19-195 10150.7 10318.7 983.3 56.0 226.5 -62.2
SK-19-196 10151.3 10318.7 982.7 50.0 174.3 -64.0
SK-19-197 10152.6 10318.6 982.8 53.0 121.2 -71.6
SK-19-198 10152.7 10318.2 982.6 14.0 45.0 -80.0
SK-19-198A 10152.7 10318.2 982.6 56.0 61.9 -80.0
SK-19-199 10152.4 10319.4 981.9 56.0 45.5 -61.1
SK-19-200 10079.8 10263.8 966.1 77.0 39.7 -81.4
SK-19-201 10082.8 10261.9 969.3 77.0 58.5 -61.1
SK-19-202 10082.8 10261.6 969.6 77.0 61.1 -72.6
SK-19-203 10082.3 10262.4 968.4 14.0 83.2 -80.1
SK-19-203A 10082.3 10262.4 968.4 71.0 85.7 -79.2
SK-19-204 10082.7 10260.3 969.8 68.0 86.0 -64.8
SK-19-205 10083.4 10260.1 969.1 65.0 82.4 -50.5
SK-19-206 10145.5 10267.4 982.8 50.0 277.9 -88.5
SK-19-207 10147.3 10267.0 981.8 47.0 129.6 -66.3
SK-19-208 10119.8 10303.5 979.5 62.0 150.9 -67.0
SK-19-209 10119.9 10303.5 980.9 65.0 149.0 -51.4
SK-19-210 10077.8 10286.2 977.7 86.0 54.0 -81.5
SK-19-211 10078.5 10285.6 977.7 92.0 57.5 -74.4
SK-19-212 10134.8 10336.7 983.7 14.0 38.8 -67.6
SK-19-212A 10134.8 10336.7 983.7 41.0 25.4 -71.0
SK-19-213 10134.2 10336.8 984.2 35.0 255.7 -51.8
SK-19-214 10134.4 10337.1 985.2 41.0 320.3 -79.8